Loading...
Meter Swap . � Request Number: 15997 Public Works Division Service Request Problem Address: $310 Broad A� Requested By: Jemufer Jones Department: WATER Addresa: No address�ovic�d Problem/Issue: INSTALL AMR METER Phone Number: 612-578-9407 Seheduled Dste: 2017-06-16 Scheduled 1ime: OS:00:00 t i'� i ACTION NEEDED: Created by: We�y Hiatt Date Created: 2017-06-15 ACI'ION TAI�N: � � 1 ti�\��C-c�.'� 4`-4 � Status: In Progress Subautter Has Been r, Contacted Date Compieted: Completed by: �' l�O' I� � �°'�' �� - �3 5� -� y �,�y o���d�ey � W��e����a����� 5��- �b z5 ' 6433 l�raivers6ty Avenue NE Fr�dDey, MN 5543Z 763-572-3566 'fwe hereby authorize the�ty of�ridtey and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is tiabfe for the water line from the enain to the premise and aU ictterior plurnbing. (Per�Lity code 402.a5) 1 also hofd tfie City of Fridiey andrts employees harmless for any damages that may occur whife doing this operation. This to indude,but not limited to vafves,piping,wafls,floars or the curb stap box and service line. in understand 1 am also require ta obtain a permit prreor to arry arark,if necessary. FINAL METER READIAIG(oid meter) v����� Name: �``�`�`V�u� <,�1�`���.C� Address ��V�-� Ahone�lumber ��� Date K J � Y�V �� �V S�g° Witness Sigrrature OLD METER#_ _� � l-�� � l ��� ULD READlNG ��V "`�� NfWMETER#__��CJ���'l, ` NEW READINC', � E!l�TT# � � r� �`��� FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANfTARY SEWER ADMlNlSTttAT{ON (ltef Ord No 113,4.64.,565,566,629,638,662,922,988,1144,1156,1191j 4a2.5 PERMIT FEE Prior to constructing ar repair of any water of sewer line connecting the existing municipat system and any house or fwi(ding for which the appfication is made,the owner or corrtractor shatl be required to obtain a permit for wch connection,and shall pay a perrnit fee as provided in Chapter 11 of this Code. After such connedion has been made,the Water and Sewer Departmerrt shall be notified. It shali be unlawful to cover any connecting line until art inspection has been made and such connection and the work inciderrt thereto has been approved by the City as a proper and suitable connectian. 402.06 REP,4IRS AiVD MAIPITEIVARICE TO CONtYECT{OM After the iaitiat connection has been made to the arater service curb stop boz or the sewer fead at the property line or a water seniice iead has Iseen extended to the property line for sonnection,the applicarrt,owner,or occuparrt or user of such premises shall be liable for ail repairs required to any water line and sewer lines necessary#or connection of the premises from the main to the premises. tf the property owner requests maintenance service or repairs be performed by the City,the property owner shali be charged for the c�ts of the maintenance and/or repairs,inciuding necessary street repairs at a rate set annually t�y an administrative poliry. It shall be the responsibitity of the applicarrt, owner,occupant or user to perForm standard mai�enance of the sewer service line from the premises to the main inc{uding debris dearing or root cutting and to maintain the rxater servlce curb stop box for operabtlity and at such heigfrt as wifl ensure that it remains above the finished grade of the land or property. {Ref 638,1156,1191)