Loading...
Meter Swap Request Number: 12313 Public Works Division Service Request Problem Address: 7428 Concerto Curve Reqnested By: Anita Barber Department: WA1ER Address: 7428 Concerto G�r�e Fridley,MN 55432 Problem/Issue: INSTALL AMR METER Phone Number: 612-558-135� Schedul ed Date: 2016-12-12 Scheduled 15me: 02:00:00 J AC'ITON NEEDED:Install AMR-please note the resident is disabled and may take a little time to get to the door. � `{ Created by: Beth Kondrick Date Created: 2016-12-01 ACTION TA[�N: ` �ri5��f£� r�,�'�. `� Status: In Progress Snbmitter Has Been � Contacted Date Completed: `�! � 1�� t� Completed by: L. 6 , �. i � City of Fridley � �� � �� �j� Water Department 6431 University Avenue NE ���(�'v�'"-" Fridley, MN 55432 ��� � 763-572-3566 I/we �� �� �l�"��'e-`T hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for tfie water{ine from the main to the premise and all iMerior plumbing. (Per City code 402.06) I also hold the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand I am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) �� � � ` � �/ Name: ���- rJ�t�,�� Address ��2.� �"V�G e`t'�`t'� L c.�✓'1�'¢" Phone mber ��Z_ �`�v �1� Date �Z i �- � �� Signature • WitnessSignature V�`�""�`" o�u�n�r�R# .�� (� 5 (0 d o��_ OLD READING �(.o� -) / �� . . NEW METER# �'� �' �� ,U NEW READING � ERT#._ CD�� 7 / .7 � V � ., ��h"i FRIDLEY CIT1�CODE 3� CHAPTER 402.WATER,STORM V1��7ER AND SANITARY SEWER � ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) � 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or building for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shatt be not�ed. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the properly line or a water service lead has been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shall be liable for all repairs required to any water tine and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the mairrtenance and/or repairs,including necessary street repairs at a rate set annually by an administrative poliry. It shail be the responsibility of the applica�rt, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as wiil ensure that it remains above the finished grade of the land or p�operty. (Ref 638,1156,1191)