Loading...
Meter Swap �: Request Number: 12323 Public Works Division Service Request Problem Address: 7429 Concerto C�r� Requested By: Jonathan � Department: WA1ER Address: 7429 Concerto Curve Fridley,MN 55432 Problem/Issue: INSTAL,L AMIZ METER Phone Number: 651-315-3547 Scheduled Date: 2016-12-14 Scheduled 15me: 01:00:00 ING� � � l�Ob ACTTON NEEDED:Install AMR meter Created by: Beth Kondrick Date Created: 2016-12-02 ACTION TAI�N: ........_�.....�:...��`..�....�..,�.���.........._.....�_"..-_..-'...�_.._.._....._._._....__...__....__......._..�....._........._.._........__................_.�__.._._.__........_...__..,�....._..._.___.__..__.._......._._.... Status: 1n Progress Submitter Has Been � Contacted Date Completed: Completed by: i � �(., � � V , l��U��v°,ao�'�l� ! � �:�,-; � �, . City of Fridley � '� Water Department ���-��,�1�� 6(�U'� 6431 University Avenue NE Fridley, MN 55432 763-572-3566 I/we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and a{i interior plumbing. (Per City code 402.06j 1 also hold the City of Fridley and/its empioyees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and service Ilne. In understand I am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) `�1 D '-1�-I �2� Name:� 1CS��v � Address '�1�� w�Ce'�(�'�Cv '��'�, Phone Number ���� �����_ Date ��+ ' 1 � � � �Signature � Wiiness Signature i OLD METER# � � I ' b�l./C� � OLD READING ��� v� NEW METER# �� � I � `� � � NEW READING � ERT# ���� j3�`L- FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,556,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or building for wfireh the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter ii of this Code. After such connection has been made,the Wate�and Sewer Department shall be notif'ied. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitabfe connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service(ead has been extended to the property line for connedion,the applicant,owner,or occupant or user of such premises shall be liable for all repairs required to any water tine and sewer lines necessary for connection of the premises from the maio to the premises. tf the property owr►er requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs,inciuding necessary street repairs at a rate set annually by an administrative pofiry. It shall be the responsibility of the applicant, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)