Loading...
Meter Swap ° Request Number: 15977 Public works Division Service Request Probiem Address: 490 Ely St Requested By: Cherish Department: WA'IER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Namber: 612-834-1457 Scheduled Date: 201'I-06-15 Schednled 1lme: 08:30:00 � � ACTION NEEDED: - Created by: Wendy Hiatt Dxte Created: 2017-06-14 ACTION TAKEN: '"'�• _ . � �- ___ �.S�U _......................_.........._._..........................._...�..... . ._..._....._._.........._.__._..._.._.w........._��........................._..._......._.__..._...___.... __ � .........................__._.._ .._._ __�......_._._..____......_._..._........_._....._......................_...._._.�.��..�_�..___..___����_.__.. ________ Status: In Progress Submitter Hs�s Been r, Contacted � Date Completed: �_ ���'�t Completed by: � ���e _�� � :� �. � r �;� r .E ,� �. � . ; � -, � � i.s,"i , �i#y of Fridley �%�(�' — �C��� �� —"v � Wa��r�e�artrs�ent �b431 l�niversity Avenue A!E '/ � ���''�Y,MN 55432 ��� �i� (�� 763-572-356� T � ','Ne hereby authorize the Crty of�ridtey andjor its employees to do rvhat is necessary to replace the water meter. (understand that the proeserty owner is liable for the water line from the main to Ehe premise and aft irrterior plumhing. {Per�Lity code 402.06) 1 aiso hold tbe City of Fridtey and/its employees fiarmtess for a�y damages that may occur while doing this operation. This to indude,but not limited to valves,pipin;�wafls,floors or#he curb stop 6ex and senrice line. in understand 1 am also require to abtain e permit prior to any�rork,if necessary. FINAL METER READfA1G(o1d meter) � � �7 � � Name: �'4^Q, r' `�Yj � Address __ �� 0 �� 1 �• Phone lYumber ���,� u� t"' � t �� Qate � � ��� y� i nature � C,� � Witness Signature _� O� M�ER#_ �� , a ���b ( oLo R�D�NG �3 � `7(� � � __. NEW METER# �'1 la� C� 3 � (� �� IYEW READtNG O �.. ��T# �� 3� � na� FRIDLEY ClTY CODE CHAP7ER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (�tef Ocd Na 113,464,565,566,629,638,662,922,988,1144,1156,1191j 402.5 RERRAiT FEE P�ior to cvnstrucCing or repair of any water of sewer line connecting#he existing municipal system and arty house or buitding for which the application is made,the owner or centractor shall be required to obbin a permit for sucEt conaection,and shati pay a penmit fee as provided in Chapter 110#this Code. After such connecCion has been made,the Water and Sewer Departmerrt shalf be notified. It shall�untawfui to cover any connecting line urrCil an inspection has been made and such connection and the wo�{c incident theseto has been approved by the City as a proper and suitable conneetion. 40Z.06 REPAfRS AND MAINTENANCE TO COIVIVECT101V After the initiai conriection has been made to the water service curb stop box or the sewer lead at the properly line or a water ser�nice tead has been extended to the property Itne for connection,the appliraM,owner,or occupant ar user of wch premises shal!be{iaWe for all repairs required Co any water line and sewer lines necessary#or conneetion of the prers�ises from the main to the premises. tf the property oarner requests mai�tenance servTce ar repairs be performed by the C'rty,the property owner shati be charged for the c�ts of the maintenartce andJar repairs,inctuding necessary street repairs at a rate set a�nually Isy an adrn��istrative pofiry. It shap be the responsibility aF#he applicant, owner,occupant or user to perForm standard mairrtenance of the sewer se�rrice line f�om#he premises to the main inciuding debris dearing or root cutting and to maintain the water service curb stop box for operability and at such height as wiil ensure tf►at it remains above the finished grade af the land or property. (Ref 638,1156,1191)