Loading...
Meter Swap t i Request Number: 16194 Public Works Division Service Request Problem Address: 593 Fairmont St Requested By: Bob Department: WATER Address: No address p�ovided Problem/Issue: INSTALL AMR METER Phone Number: 763-'780-8515 Scheduled Date: 2017- 7-10 � Schednled'Cfine: 09:00:00 r���Y�1 �L�. ACITON NEEDED: Created by: Wendy Hiatt Date Created: 2017-06-29 ACTION TAI�N: � _1..�5�.(J� `�-i Status: In Progress Submitter Has Been r Contacted Date Completed: �_ I ,^ r '� Completed by: C���,,� lJ �, .� City of Fridtey Water Department 6431 University Avenue NE ��� � �j�.( 1�0—�) Fridley,MN 55432 763-572-3566 s� �. (��� � o�'ae hereby authorize the City af Fridley and/or its employees to do what is necessary to repiace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all irrterior plumbing. (Per City code 402.06j I also hold the Crty of Fridley andrts emp(oyees harmless for arry damages that may occur while doing this operation. This to include,but not limited to valves,piping,watis,floors or the curb stop box and service line. In understand i am also required to obtain a permit prior to any work,if necessary. FINAC METER READING(old meter) � �'�� v� � Name• ��Y� Address ��� �lill,��BLL�" �. ' v Phone Number � �- �- ��� p�, _ ��- t U �- ' � K Signature Witness Signature �— V� OI.DMETER# q�la2 S�C�c� OLD READING � � t ���d NEW MEfER# � 9 ✓��lp(�1(� NEW READING � ERT# � � � �\l[ l I FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ' ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1193} 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer{ine connecting the existing municipai system and any house or�ilding for which the applicafion is made,the owner or cor�tractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sevorer Department shali be notified. it shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service parb stop box or the sewer lead at the property line or a water service lead has 6een extended to the property line for connection,the applicant,owner,or occuparrt or user of such premises shall be liable for ail repairs required to any water li�e and sewer lines necessary for connection of the premises from the main to the qremises. if the property owner requests maintenance service or repairs be performed by the C'rty,the property owner shall be charged for the costs of the mai�enance and/or repairs,including necessary street repairs at a rate set annually by an administrative poliry. It shali be the responsibility of the appiicarrt, owner,occupant or user to perform standa�d mai�rtenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the�nished grade of the land or property. (Ref 638,1156,1191j