Loading...
Meter Swap � � Request Number: 15829 Public works Division Service Request Problem Address: 552 Fairmont St Requested By: Sandi Weber Department: WA'IER Address: No address provided Problero/Issue: INSTALL AMR METER Phone Number: 763-422-8053 SchedWed Date: 2017- 6-09 Schednled T1me: 07:30:00 � �� �1 ACTION NEEDED: Created by: Wendy Hiatt Date Created: 2017-06-07 ACTION TAI�N: __......�.�.��..I.__1_���._____.._.............___.._.______._...__....__..._._._. ____....___ ________.. Status: In Prog�ess Submitter Has Been �.. Contacted Date Completed: Completed by: �Q��^ �� � Lt�`( � , �'�„����ar�„ ���- ���1�� ��2- wa��r�e�a�r�en� �� G� rOC.CT ' 6431 llniversity Avenue NE Fr6tl9eyo MN 55432 763-572-3566 1/we hereby authorize the C�ty of Pridtey and/or its empioyees to do what is necessary to replace the water meter. 1 understand that the property owner is liabfe for the water line from the main to the premise and a!1 iriterior plumbing. (Per��i:y code�02.06J 1 also hold the Cty of Fridiey and/'�ts employees harmless for arry damages that may occur while doing this operation. This to indude,but not limited to valves,piping,walls,floors or the curb stop box and service line. In underst�and t am also requir� to abtain a permit pr�or to any work,if reecessary, FBPIAL METER READtNG(oid meter� � � `� � O Name•L��.�IX w'� We..."— `�� Address�� L �'�Z��O�� �' Phone 9Yum r�� —L 1�2� _ 'j Date �O�- 1' 1,`, � Si �ature � i_� Witness Signature OLD MIETER# � ��� ! L�� OLD READtIVG_� � L.i� —` O NEW METER#�-I���1-T{�j NEW READtNG V' ERT# � ��� � C�� FRIDLEY CITY CODE CHAP'TER 402.WATER,STORM WATER AND SANITARY SEWER ADMINtSfRAT10M � (lief Ord IVo 113,464,565,566,629,638,662,922,988,1144,1156,1191j 4a2.5 PERAAi7 FEE Prior#o constructing or repair of any water of sewer line cannecting the existing municipal system and any house or buiiding for which the application is made,#he owner or contractor shall be required to obtain a permit fvr such connection,and shat!pay a�rmit€ee as provided�rt Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shali be naGfied. It shail be untawful to cover any connecting line uritil an inspection has been made and such connection and the work incident thereto has t�en approved by the Crty as a proper and suitable wnnection. 402.06 REPAIRS AR1D MAINTERIANCE TO CONNECTIOfV After the initiat connectiort has been made to the water senrice curb stop box or the sewer tead at the property line or a water service Jead has been extended to the property line for sonnection,the applicarrt,owner,or occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines necessary#or connection af the premises from the main to the premises. tf the property owner requests mairrtenance senrice ar repairs be performed 6y the City,the property owner shali be charged for the costs of the maintenance and/or repairs,inciuding necessary stree#repairs at a rate set annual(y by an administrafive poliry. It shall be the respansibility af the applicant, owner,occupant or user to perform standard mairrtenance of the sewer service line from the premises to the main including debris dearing or root cutting and�o maintain the water service curb stop box for operability and at such height as wifi ensure that it remains above the finished grade af the tand or property. (Ref 638,1156,1191)