Loading...
Meter Swap . �. Request Number: 15854 Public works Division Service Request Problem Address: 546 Glencoe St Requested By: Abdulmojeed Deputment: WA'IER Address: No ac�ress provided Problem/Issue: INSTALL AMR ME1ER Phonc Number: 763-445-094? Scheduled te: 2017-06-16 Schedaledllme: 09:00:00 � � ��� ACTIOPT NEEDED: � r Creuted by: Beth Koxdrick Dnte Created: 2017-06-07 ACTION TA[�N: ..�........._ _._._......._.._���.���,������'�-�- , �� �� �4- '� :�.^;�. �`-�;i;:',. � ' . � '1 Status: In Progress Submitter Has Been r Contacted � Date Completed: �,Q-- ��,�G -- �� Completed by: �� ., �� '�;.3 .w� � �ity o#�r'tdley ���-- �V�E�� �'� 3 • Water�epa�evaerst �� � ��/ 643�lln6versi�y Averaue NE T d� �3 Fa�d9ey,MN 55432 763-572-3566 �/'"�e hereby authorize the C�ty of Fridtey and/or its emp(oyees to do what is necessary to replace the water meter, t understand that the pro�oerty owner is tiabie for the water line from the main to the premise and all irrterior plumbing. {Per City code 402.06) 1 also hoid the Crty of Fridiey and/its employees haemless for arry damages that may occur while doing this operation. This to include,but not limited to vahres,piping,walis,floors or the curb stop 6oK and service line. In understand!am also require to obtain a permit prio�to arry worlc,if necessary. FINAL METER READIAi6(old meter)_ ��� � � � V Name: � �1.1, ��Lj 1��.� Address-- ��� I'e{/�(�� ��— . — Phone 9Yumber c��' �' �' v I�� Date �' 1 l�`� �� Signature ' --� Witness Signature OLD METfR# 1�i { " `d l� (J� OLD READING � f�((J�c �� NEW METER# � -4 ��1..�O�v'� iYEIlV READIMG V EFtT# _ ��d�p" / �� I FRIDLEY CITY CODE CHAPTER 4�02.WATER,STORM WATER AND SANITARY SEWER ADMINlSTRATION � (Ref Ord No 113,454,565,566,629,638,662,922,958,1144,1155,I191} 402.5 PERMiT FEE Prior to constructing or repair of arry water of sewer line connecting the existing municipai system and arty house or building for which the applicafion is made,the owner or contractor shall be required to obtain a permit for such wnnection,and shall pay a permit fee as provided in Chapter 11 af this Code. After such connection has been made,the Water and Sewer Departmerrt shall be notified. It shall be unlawful to cover any connecting line urrti!an inspection has been made and such connection and the work incident thereto has been approved by the Ctty as a groper and suitable connectiort. 4Q2.06 REPAIRS AND MAINTENANCE TO CONPIECTIOAI After the initiat connection has been made to the water service curb stop boec or the sewer iead at the property line or a water seroice lead has been extended to the property line for connectio�,the applica�rt,owner,or occupaM or user of such premises shall be liable for aii repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. tF the property oarner requests mairrtenance service or repairs be performed by the�ty,the property owner shall be charged for the costs of the maiMenance and/ar repairs,including necessary street repairs at a rate set annually by an adminishative poliry. !t shall be the responsibility of the applicant, owner,occupant or user to perform standard mairitenance of the sewer service line from the premises to the main induding debris dearing or root cutting and to maintain the water service curb stop box for operability and at such height as wiN ensure that it remains above the finished grade af the fand or property. (Ref 638,1156,1191)