Meter Swap �
Request Number: 15811
Public works Division
Service Request
Problem Address: 106 Harhnann Circle Requested�y: Andrea Riebel
Deputmeat: WATER Address: No address provided
ProWem/Issue: INSTALL AMR METER Phone Numbcr: 651-353-8436
Scheduled Date: 2017-06-08 Sc6eduled 11me: 10:30:00
� ' � .
AC'ITON NEEDED:
Created by: Beth Kondrick Date Created: 2017-06-06
ACTION TAI+�EN:
�Y ���� ` �
Status: In Prog�ess Submitter Has Been r,
Cont�ted
Date Completed: � — �,-- �,'"1 Completed by: �a��
' �i�y o��ridfey �J�— � I � � ' �`
' Water Departrvaea�t
Fi431 lJo�iversity Averoue NE �� � / /,'� /�(�I
FrBd9ey,MPl 55432
`-f"�(15
763-572-3566
i/we hereby authorize the City of Frid(ey and/or its emp(oyees to do what is necessary to
ceplace the water meter. 1 understand that the property owner is liabie for the water line from the main to the premise and all irrterior
plumbing. (Per C'rty code�Q2.06j I aiso hoid tfee City of Fridiey and�ts employees harmtess for any damages that may occur while doing this
operation. This to indude,but not limited to vafves,piping,walts,floors or the curb stop box and service line. In understand!am also requin
to obtain a permit prior to arry worlc,if necessary.
FINA!METER READING(otd rr�terj � 1� / � � � O
Plame: ��'wr� ���VJ� ' tlddre�s-1V� �,�.r�� �,/1� Ci1'�
Phone lYumber��� v " ✓� —�l" �� D� �-- � '� �,�
Signature Witness Si�r�ature �
OLDMETfR#_ ��� � V� �' �
OLD READING ��� � 1/� O
NEW METER# _ { 1 � �y U 1 �
NEW READlP1G �
��# `�a3�� � �
FRIDLEY CIT1l CODE
CHAPTER 402.WA'�ER,STORN!WATER AND SANITARY SEWER
ADMINISTRATION �
(tief Ord No 113,464,565,566,629,638,662,922,988,i144,1156,i191j
402.5 PERAAiT FEE
Prior to constructing or repair of any water of sewer line connecting the existing municipa!system and arry hause ar buitding for which the
application is made,the owner or contractor shall be required to obtain a permit for such connection,and shail pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shail be nofified. tt shall be untawful to cover
any connecting line ur�til an inspection has been made and such connection and the work incident thereto has been approved by#he City as a
proper and suitable connection.
402.06 REPAIRS APtD MAINTENANCE TO COP(PiECT{OfV
After the initiat cannection has been made to the water service cur6 stop box or the sewer lead at the property iine or a water service lead has
been extended to the property line for sonnection,the applicant,owner,or occupant or user of such premises shali be ifable for all repairs
required to any water line and sewer lines necessary for connection of the premises from the main to the premises. lf the pmperty owner
requests mairrtenance service or repairs be performed by#he City,the property owner sha0 be charged for the costs of the maintenance and/or
repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibifity of the applicar�t,
owner,occupant or user to perform standard mairrtenance of the sewer seroice line from the premises to the main including debris dearing or
root cutting and#o maintain the water service curb stop box for operability and at such height as will ensure that it remains above fihe finished
grade af the land or property. (Ref 638,1156,1191)