Loading...
Meter Swap � Request Number: 15969 Public Works Division Service Request Problem Address: 7061 Hickory Dr Requested By: Frankie Department: WATER Address: No address provided Problem/tssue: INSTALL AMR METER Phone Number: 612-805-5486 Scheduled 2017-06-16 , Scheduled'Ilme: 10:00:00 � /i - � !l.� ACTION NEEDED: Createdby: WendyHiatt DateCreated: 2017-06-13 ACTYON TAI�N: �V� � ................................��.�___._..�� ..._ _.__..._____.__..._................._...._......_......_.__.__ Status: In Progress Snbmitter Has Been r.. Contacted Date Completed: Completed by: �'0-- 1 �`o—�'� �' �or � �� �10z�� ��' ���,�f�����Y � . Flva��r�epartrra�nc �Q�- ��2� �431 llniversity Aventae NE { Fr�dley,MN 55432 763-572-3556 rl'Ne he�eby authorize the City of Fridtey and/or its employees to r!o►uhat is necessary to replace the water meter. t understand that the pro�oerty owner is iiable for the water line firom the main to the premise and all irtterior plumbing. (Per C'�ty code 402.06) 1 also hoid ihe CFty of Fridiey andJ'rts employees harmless for any damages that may occur whiie doing this operation. 7his to tnclude,but not limited to vaives,piping,wa(Is,floors or the curb stop box end service line. In understand t am also requirE to abtain a permit prior to arry work,if s�ecessary. FINA!METE[t REAQ{t+1G(old meter) l�O �� C,� � Name• _ �Y�i V►� Address v v�� r Phone lYumber�1 V /!.�'—�are �"" �� �� �I 5���J Nllitness Sigrtature �� OlD METER# � 1 �� I c�� � �JLD READtNG � I � v� �V NEW METEit#__ 1�V� �`ri� NEW READtNG lJ E9�T# ! '� t�� `,� FRI�LEY CITY CODE CHAPTER 40Z.WATER,STORM WATER ANO SANITARY SEWER ADMINlSTRATION (Ref Ord Pto 113,464,565,566,629,638,662,922,9$8,1144,1156,1191) 402.5 PERMIT FEE Prior to sonstructing or repair of any water of sewer line connect+ng the existing municipa!system and any house or building for whicfi the application is made,the owner ar corrtractor sha(1 be required to obtain a permit for such connection,and shaii pay a permit fee as provided+n Chapter 11 of this Code. After such co�nection has been made,the Water and Sewer Departmerrt shall be notified iC sfiall be uniawful to cover any connectin�line urrtif an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper end suita6le connection. 402.06 REPAIRS AND MAINTENANCE TO COPINECTION After the initiat conaectian has been made to the water service wrb stop box or the sewer(ead at the property line or a water service tead has been 2xtended to the property 4ine for connection,the eppficant,owner,or occupant or user of such premises shatl be 1lable for a11 repairs required to ar�y arater line and sewer lines necessary for connection of the premises from the main ta the premises. ff the�ro�rty owner requests rrsaintenance service or repairs be perFormed by the C"rty,the property owner shail be charged for the costs af the maintenance and/or repairs,including necessary street repairs at a rate set annually 5y an admi�istrative policy. It shalf be the responsibility of the applicarit, awner,occupant or user to perform standard mair�Cenance of the sewer seroFce line trom the premises to the main indudir�g debris dearing or root cutting and to mairrtain the water service curb sto¢6ox for operability and a#wch height as will ensure that it remair�s above the finished grade af the land or property. {Ref 63g,1156,1191]