Loading...
Meter Swap Request Number: 16231 Public Works Division Service Request Problem Address: 695 Hugo St Requested By: Mark Rose Department: WATER Address: No address provided ProblemlIssue: INSTALL AMR METER Phone Number: 763-442-4671 Scheduled Date: 2017-07-07 Scheduled'[ime: OS:00:00 . � C.�`r/!'`— ACTTON NEEDED: Created by: Beth Kondrick Date Created: 2017-07-OS ACTION TAI�N: ................��n��,.•....'._'..��............_._..�....�.`.....:..�."�-_..____�......_...__...._.._.._........_................................_.�__......____._................................___.__..........................................._..__........._......_._._.... Status: In Progress Submitter Has Been �., Contacted Date Completed: Completed by: Hours ��j _— I�ta�f � � � + � � `�Ij�-' �j/lG�� '�C��- City of Fridley ��� ` `�/� � ' Water Department 6431 University Avenue PIE Fridley,MN 55432 763-5T2-3566 ��We hereby authorize the City of Fridley and/or iis employees to do what is necessary to repiace the water meter. 1 understand that the property owner is liable for the water fine from the main to the premise and all interior plumbing. (Per City code 402.06) 1 aiso hold the City af Fridley and/iu employees harmfess for arry damages that may occur while doing this operation. This to include,but not limited to valves,piping,waits,floars or the curb stop box and service line. In understand I am also required to obtain a permit prior to any work,if necessary. FINAL METER READI G(old meter) `�� ��� Alame• � `W �-- �v� Address �� Phoae Number���� �����p� � " �"' '� �Signature - --�C�-���( Witness Signature OLD METER# �Q 2-3 ��l OLD READING �Z�D � UQ NEW METER# �� J���`-1 U NEW READING � ERT#�� t I � �� � FRID4EY CITY CODE CHAPTER 4Q2.WATER,STORM WATER AND SANITARY SEWER ADMINiSTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 4fl2.5 PfRMIT FEE Prior to constructing or repair of arry water of sewer line connecting the existing municipal system and any house or buiiding for which the application is made,the owner or contrador shafi be required to obtain a permit for such co�nection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shail be unlawful to+cover any connecting line until an inspection fias been made and such connection and the work incident thereto has been approved by the City as a proper and suitabie co�nectio�. 402.06 REPAIRS AND MAINTENANCE TO COPtNECC{ON After the initial connection has been made to the water senrice curb stop box or t6e sewer fead at the property itne or a water seroic@ lead has been e�ctended to the property line for connection,the appiicant,owner,or ocwparrt or user of such premises sha11 be llabie for all repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests meintenance service or repairs be performed by the City,the p�nperty owner shalf be charged for the c�ts af the mairitenance arfdJor repairs,including necessary street repairs at a rate set annuaily by an administrative policy. It shall be the responsibi{ity of the appticarrt, owner,occupant or user to perform standard mair�tenance of tfie sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as wil�ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191j