Loading...
Meter Swap �, Request Number: 15887 ` Pubfic Works Division Service Request Problem Address: 666 Hugo St Requested By: Doug Cloutier Department: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 763-786-6651 Scheduled Date• 2017-06-i Scheduled Time: 08:00:00 �l� �Q/� ACTION NEEDED: Created by: Wendy Hiatt Date Created: 2017-06-08 ACTiON TAI�N: � �.5��I � �(2-. :� .....................� . . _ __...___._._......_.__............_______._._...........__.._..._.___.__ ______ Status: In Progress Submitter Has Been r Contacted Date Completed: Completed by: � - 1�- I� �"' �r � ���,of��;drey �ag- �ll 1�� �-a � Water Department �4 6431 lJniversity Avenue NE �� �. 'L!.�� Fridley,MN 55432 ��� • 763-572-3566 ��We hereby authorize the City of Frid(ey and/or its employees to do xrhat is necessary io replace the water meter. 1 understand that the properly owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 402.06) 1 also hotd the City of Fridfey and/its empioyees harmiess for any damages that may occur while doing this operation. This to include,6ut not limited to valves,pipin�walls,floors or the curb stop hox and service line. In understand!am aiso required to obtain a permit prio�to any work,if necessary. FINAL METER READiTIG(old meter) i�� �� ��O Name: _��� ���� Address �J� � � Phone Numb l� —�(>`���Vv✓�Date �r 1—`� � �i nature Witness Signature OLD METER# ���� ' � � OLD READING �� O I ��Q NEW METER# � � ����� �j NEW READING D E�# �l 22-2`� 2�(,� FRIDLEY CITY CODE CNAPTER 4U2.WATER,SfORM WATER AND SANITARY SEWER ADMI11tISTRATtON (Ref Ord No 113,464,565,566,629,63$,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constcucting or repair of any water af sewer fine connecting the existing municipat system and any house or buiiding for which the appiication is made,the owner or contractor shatl be requi�ed to obtain a permit far such connection,and shati pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Oepartmer�t shall be notfied. It shall be unlawful to cover any connecting line urrtil an inspection has been made and such connection and the work incident thereto has been approved by the Ctty as a proper and suitable connectiort. 402.06 REPAIRS AND MAINTENANCE TO CONNECTtON After the initial connection has been made to the water seroice curb stop box or the sewer lead at the property line or a water serv(ce tead has been extended to the property line for connectio�,the applicant,owner,ar occuparrt or user of such premises shall be liable fior all repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests mainte�ance service or repairs be performed by the City,the property owner shali be charged for the costs of the mai�rtenance and/or repairs.including�ecessary street repairs at a rate set annually by an administrative poliry. it shall be the responsibility of the applicant, owner,occupant or user to perForm standard maintenance of the sewer senrice line from the premises to the r►�ain including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of tbe land or property. (Ref 638,1156,1191)