Loading...
Meter Swap � j � � � � Request Number: 16047 Public works Division Service Request Problem Address: 677 Ironton St Requested By: Robert Larson Department: WATER Address: No address provided Problemllssue: INSTALL AMR METER Phone Number: ?63-354-9821 Scheduled Dnte: 2017-06-19 � Sc6eduled 1lme: 11:00:00 � ACTION NEEDED: Created by: Wendy Hiatt Date Created: 2017-06-19 AC'�TON TAI�N: ' ...........•�.-'-`�(,���...............��_...........__._..._...__...._......._.____�_._......__.._.....__.............._._......_.�..._..._......._...__._.._.___ __..__. ' Status: In Progress Submitter Has Been �.. Co�acted Date Completed: Completed by: (� � � ' �� 'T' � t1Y'"� � ' � �/� ����2 , City of Fridley �� Water Department 2� 6431 University Avenue NE �� � Fradley,MN 55432 � 7fi3-572-356fi ��`"�e hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and all irit:e�ior p{umbing. (Per C'�ty code 402.06) 1 aiso hold#he City of Fridley and/its employees harmless for arry damages that may occur while doing this operation. This to include,but not limited to valves,piping,walis,floors or the curb stop box and service line. In understand I am also required to obtain a permit prior to any work,if necessary. FINAL METER READIPfG(oid meter) � `�� ��-�C.IL,J � Name• ���� 1.6�" ��r � Address lCJ 4� �V1,� �� Phone Number��"��r�"� Date �U�� 1,— 1 1 �j S�g��?-f�`d�"��-�,001-�[� Witness Signature OLD METER# ` �"�� I �� OLD READING 1J E�`0� NEW METER# {�"1 Z� ���� �O NEW READING� ERT# � ���� ��� FRIDLEY CITY CODE ' CHAPTER 4�02.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,488,1144,1156,1191) 402.5 PERMIT FEE ' Prior to constructing or repair of arry water of sewer line connecting the existing municipal system and arry house or building for which the' application is made,the owner or contractor shail be required to obtain a permit for such connection,and shafi pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shalt be notified. It shali be urtlawful to cover any connecting line until an inspection has heen made and such connection and the work inciderrtthereto has been approaed by the�ty as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE T�D CONNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the properly tine or a water serv�ce tead��has been extended to the praperty tine for connection,the appticarrt,owner,or occupant ar user af such premises shall be liable for all repairs required to any water line and sewer lines necessary for connectian of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the mair�tenence and/or repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibility of the applicarrt, owner,occupant or user to perform standard mairrtenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. {Ref 638,1156,1191'