Meter Swap ,
t Request Number: 16018
Public works Division
Service Request
Problem Address: 549 Kimball St Requested By: Melody
Department: WATER Address: No address provided
Problem/7ssue: 1NSTALL AMR METER Phone Nnmber: 763-?86-2896
Scheduled D e• 2017-06-21 5chednled Tlme: 02:00:00
��e.� l�' ,�
ACITON NEEDED:
Created by: Wendy Hiatt Date Created: 2017-06-15
ACTION TAI�N:
_.L�s�..11 ._...........1�M � .._.._
_................_...................____....._._�:�_____._.___....._..____._..__.._..._..._._._.________.__.........__..._........._..__ _ __________.__._
Status: In Progress Snbmitter HAs Been r,
Contacted
Date Completed: Completed by:
�o - 21 - (�? 7�' Zo�---
�
���
, �i�y o�Frdclley
Wat�r De�sarteraen� � 1� �ta ��—�VI
6431 lJniversity Avenue NE
Farodley,MN 55432 �. (f''1Q'r
763-572-3566
a�'Ne hereby autharize the Crty of Fridley and/or its employees to do what is necessary ta
replace the water meter. 0 understand that the property owner is liable for the water fine from the main to ihe premise and all irrterior
plumbing. (Per�'rty code 402.06) 1 also hold the Crty of Fridfey andPts employees harmiess for any damages that may oaur while doing this
operation. This to include,but not lim'rted to valves,piping,walls,floors or the cucb stop box and service line. In understand!am also require
to abtain a permit prior to arry worlc,if necessary.
FINAL ME'1'ER READIAtG(otd meter) �`� � ���
Plame: Address � 1 ���, ��
Phone 9Yumber
�10 GrV�o� L�� I�ate_���`+ `�
}�., Signature Witness Signature_�
LV
O`DMETER#__� �� � � �Z�
OLD READING_ � ?j?j S� �
NEW NiETER#-- �Lq 2-2��3
NEW READfNG �
E�# �Z2�� ���`�
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,4fi4,565,566,529,638,662,922,988,I144,1156,1191j
402.5 PERMIT FEE
Prior to constructing or repair of any water of sewer line connecting the existing municipal system and arry house or building for which the
appiication is made,the owner ar contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connectio�has been made,the Water and Sewer Departmerrt shali 6e notified. It shail be untawful to cover
any connecting line until an inspection has been made and such co�anection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06 REPAIRS AIYD MAINTEPlAR10E TO CONNECTIOfV
After the initial connection has been made to the water service turb stop box or the sewer lead at the property line or a water seraice tead has
been extended#o the property line for connection,the appfica�,owner,or occupant a�user of wch premises shall be liable for ait repairs
required to any water line and seover lines necessary for connection af the premises from the main to the premises. ff the property owner
requests maintenassce service or repairs be performed by the City,the property owner shali be charged for the costs�af the mairrtenance and/or
repairs,including necessary street repairs at a rate set annualiy bg an administrative poliry. It shalt be the responsibility of ifie applicant,
owner,occupant or user to perform standard mair�tenance of the sewer service line from the premises to the main including debris dearing or
root cutting and to maintain the water senrice curb stop box for operability and at such height as will ensure that it remains above the finished
grade af the land or property. (Ref 638,1155,1191)