Loading...
Meter Swap . Request Number: 15316 . Public works Division Service Request _ _ _ _ _ __ . Problem Address: 172 Logan Pkwy Requested By: William Ste�nson Departmeat: WATER Address: No addtess provided Problem/Issue: INSTALL AMR METER Phone Number: 763-571-3589 Scheduled D e: 2017-OS-17 Scheduled Time: 09:00:00 �� ACTION NEEDED: Created by: Beth Kondrick Date Created: 2017-OS-12 ACTION TAI�N: �Cj,�'� � (�'� .��'t'�� _................................................................................................................................................_......._.............................................................................................................................._........................._.................._.....�......�...._......__�......._._............... ..........................................................................................................................._._.._...................................................................................................................._.............................................................................................__........................................__ ......................_.._...._............................................................................................................................................................................................................................................................................................................................................_.............................. .............................................................................................................................................................................................................................................................................................................................................................._...._.._..................................... .................................................................................................................................................................................................................................................................................................................................................................................................................. ....................................................................................................................................................................................................................................................................................._..____.._.._................_.._...._................_......_..........................................,. Status: In Progress Submitter Has Been r Contacted Date Completed: � '�� I� Completed by: \ �y�� Hours v� � �.;, ��� f �,� ��o -8 ! � City of Fridley � Water Department m � 1� ��� 6431 University Avenue NE S U � Fridley, MN 55432 763-572-3566 UWe hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 402.06J 1 also hald the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and senrice line. In understand I am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter) ��� �l./ � �� Name: IiV 1 ���G-b'v'L S�'�6 it�JC�'l� �� � ��►�c L��,�, ��-��,t � �� Address 1 �' Phone Number ��3� � / � ' ���l�) Date � + ` ` �� Signature Witness Signature OLD METER# 1, �'�` l�l�'�G�� OLD READING l �� G,�l% NEWMETER# `���t�� 55 �' NEW READING a ERT# � � � � � I I () FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988, 1144, 1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connectir►g the existing municipal system and any house or building for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connedio�. 402.06 REPAIRS AND MAINTENANCE TO CONNfCTION After the initiai connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shall be liable for ail repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs,inciuding necessary street repairs at a rete set annually by an administrative policy. It shall be the responsibility of the applicant, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the fnished grade of the land or property. (Ref 638,1156,1191)