Meter Swap ; Request Number: 15391
Public works Division
Service Request
_ _ _
Problem Address: 144 Logan Pkwy Requested By: Ms Yocum
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 571-2517
Scheduled Date: 2017-OS-19 � Scheduled'ISme: 10:30:00
.
� �:
ACTION NEEDED:
Created by: Wendy Hiatt Date Created: 2017-OS-17
ACTTON TAI�N:
.....................................................................��:.-�.��_�..I_�.c�.........................................._�,:_�°�.�....-......—......................................................................................................................................
................................................................................................................................................................................................___._........................................................................................................................................................................_......................
................................. ..................................................................................................................................................................................................................................................................................................................................................
................................................ ..................................................................................................................................................................................................................................................................................................................................
................................................................................................................................................................................................................................_....____.._.....................................................................................................................................................
...................................................................................................................................................................................................................................................................................................................................................................................................
Status: In Pro�ess Submitter Has Been r,
Contacted
Date Completed: �j,--, I G1—/ Completed by:
�/ 1 l � �� ��r
C
,e�,
City of Fridley �,/` �/ � � `�,r — v�
• Water Department ��(� � (y���
� 6431 University Avenue NE �
Fridley,MN 55432
7fi3-572-3566
��We hereby authorize the City of Fridley and/or its employees to do what is necessary to
replace the water meter. t understand that the property owner is liable for the water line from the main to the premise and aN interior
plumbing. (Per City code 402.06) 1 aiso hold the City of Fridley and/its employees harmless for any damages that may occur while doing this
operation. This to include,but not limited to valves,piQing,walls,floors or the curb stop box and service line. in understand 1 am also required
to obtain a permit prior to any work,if necessary.
FINAL METER READING(old meter) _ ✓ �✓ ��� `� �
�f l(���1
Name: ���� 'i()li�.�.l(/ Address � � �� ��.L��--Y� t r`-�'�1�
Pho�e Number _ � t� � �' oc�� 1� Date � '� �C� � C (
Signature Witness Signature ��
OLD METER# 1, l�!� 3 `�' � l �
OLD READlNG J �� �� �C1
NEW METER# �C���o� li%V` �
NEW READING �
ERT# � � C� � � � I �
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566, 629,638,662,922,988, 1144, 1156,1191)
402.5 PERMIT FEE
Prior to constructing or repair of any water of sewer line connecting the existing munitipal system and any house or buiiding fo�which the
application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be not�ed. it shall be unlawful to cover
any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06 REPAIRS AND MAINTENANCE 70 CONNECTION
After the initiai connection has been made to the water service curb stop 6ox or the sewer lead at the property line or a water service lead has
been extended to the property line for connectian,the applicant,awner,or occupant or user of such premises shall be liable for all repairs
required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner
requests maintenance senrice or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance andJor
repairs,including necessary street repairs at a rate set annually by an administrative policy. It shalt be the responsibility of the applicant,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or
root cutting and�o maintain the wvater service curb stop box for operability and at such height as will ensure that it remains above the finished
grade af the land o�property. {Ref 638,1156,3191}