Meter Swap , Request Number: 15441
Public works Division
Service Request
Problem Address: ll 6 Logan Pkwy Requested By: Julie Xiong
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 763-898-0909
Scheduled Date: �2017-OS-23 Scheduled'lime: 10:00:00
I ��S !�r..�.�.r �3`'� jC�c�►^'1
ACTION NEEDED:
Created by: Beth Kondrick Date Created: 2017-OS-18
ACT[ON T N: ��
.........._V_V�.�....................._�.�.................'T'"'.................................._......___............................................................................................................................................................................................................._.....................................
................................................................................................................................................................__.........................................................................................................................................................................................................._............_.,.................
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,_...................._........................................................................................................................
........................................................................................................................................................................................................................................................................................................................................................�...�.._.__.m..........._......................
...................................................................................................................................................................................................................................................................................................................................................................................................................
................................_...._............................................................................................................................................................................................................................................................................................................................................,.............................
Status: In Progress Submitter Has Been r
Contacted
Date Completed: Completed by:
�= Z- 3� l `1 `� �8 r
�
. 3�� -- �� �� �D -�3
. City of Fridley
Water Departrnent c�� , l���
6431 University Avenue NE V ���
Fridley, MN 55432
763-572-3566
�lwe hereby authorize the City of Fridley and/or its employees to do what is�ecessary to
replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all interior
piumbing. (Per City code 402.06) 1 aiso hofd the City of Fridley and/its employees harmless for any damages that may occur while doing this
operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand I am also required
to obtain a permit prio�to any wark,if necessary.
PINAL METER READING(old meter� �� � � � G �
Name:�U �� �� Address 1� ' r IL�
� '- _-i��/' ��
Phone Number �� ��� l.�pate � ���
Signature �_ � Witness Signature
OLD METER# lJ l � � ��--v —1
OLD READING � �� � — ` {Q
NEW METER# �f�1,���v�
NEW READfNG �
ERT# I � �� I �� �
FRIDLEY C{TY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMtNISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988, 1144, 1156,1141)
402.5 PERMfT FEE
Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or building for which the
application is made,the owner ar contractor shaN be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connedion has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover
any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06 REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has
been extended to the property line for connection,the applicant,owner,or occupant or user of such premises shall be liabfe for all repairs
required to any water fine and sewer lines necessary for connection of the premises from the main to the premises. If the property owner
requests maintenance service or repairs be perFormed by the City,the property owner shall be charged for the costs of the maintenance and/or
repairs,including necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibility of the applicant,
owner,occupant or user to perform standard maintenance of tfie sewer service line from the premises to the main including debris clearing or
root cutting and to maintain the water service curb stop box for operabi{ity and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)
F�€�q� f+ar�r� F��r#
��c�f Fr�d�
� �
�; �1-�2-5�01 . 11,J�l�12
Tjt�e: Tu��ateF a�d�nn �:
e�: Mlfater fi�tizen t+�e: ,�{�rg
= 11�L�GII�#P�04�1i''1� . �-9�Ri
Se3re�d[]�e= 71/'�''�1211�l1i1 Pl�ap�jrt)+�r�a_ �: �63-30i1-i�
��: �#t 20�2-0�i79� �re�Uir�tais: �ut aB�erfior�ar_ Lea�iae�_
� _
���
�rr-- � ��`� �-� t-�=� l� �
����c� �� t�'�' ��-e L�--�`�
�
. � _. �. _s�.n._ _ _ .
� ;������ j� � � �� �
�____ .._....�_._ �.�_�.._.�
�
_ - j . _
�.. _______�_ ____ _ _
�� �� _ l� �
. _��.__�___ _.__ . _ . ��
� o _ . _
. �
, City of Fridley .
� ' Water Department
6431 University Avenue NE
Fridley MN 55432
(763) 572-3561
Uwe hereby authorize the City of Fridley and/or its
' employees to do what is necessary to shut off the water at the curb stop box. I understand
that the praperiy owner is liable for the water line from the main to the premise. (Per
City code 402.06) I also hold the City of Fridley andlor its employees harmless for any
damages that may occur while doing this operation. This to i.n.clude,but not limited to,
sod,yard,landscaping,trees, shrubs, driveways, sidewalks or the curb stop box and
service li.ne. I understand I am also required to obtain a permit prior to any work.
� Name: Address: ��� ��CtiA�i�) ���:��
Phone Number: Date: r� —�I���
Signature:
�
Witness Signature: ��
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADNIINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988, 1144,1156,1191)
402.05. PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the e�sting municipal system and any
house or building for which the application is made,the owner or contractor shall be required to obtain a
permit for such connectian,and shatt pay a permit fee as provided in Chapter 11 of this Code. After such
connection has been made,the Water and Sewer Department shall be notified. It shall be unlawfiil to cover
any connecting li.ne until an inspection has been made and such connection and the work incident thereto
has been agproved by the City as a proper and scritable connection.
402.06. REPAIR3 AND MAINTENANCE TO CONNECTIUN
Aftar the initial connection has been made to the water service curb stop box or the sewer lead at the
properiy line or a water service or sewer lead.has been extended to the property line for conneckion,the
applicant,owner,or the occupant or user of such premises shall be liable for all repairs required to any
water line and any sewer lines necessazy for conneciaon of the premises from the main to the pzemises. If
the properiy owner requests maintenance services or repairs be performed 6y the Ciry,the properiy owner
shall be charged for the costs of the maintenance and/or repairs,including any necessary street repairs,at a
rate set annually by an adminittrative policy. It shall be the responsbility of t}ie applicant,owner,occupant
or user to'perform standard maintenance of the sewer service line from the premises to the main including
debris clearing or root cutting and to maintain the water service curb stop box for aperability and at such
height as will ensure that it*��inc above the fnished grade of the land or properiq: (Ref 638,1156, 1191j
Req�est fc�r Seraic� Rep�rt
�ity of Fndley
Reference No: �-12-5175 �a�e: S�'�J2'01z
Fi�que� T�tpwe� Se�e back�ap ct�edc C�►�ain ��d f�y: W���t
C�parkme�#: S� Gtii�Name: �e 7Gflng
Addr�ss� 11fr�.CK'�AM PKWY NE �e�c Phcan+�: 763-�s�1'-93�
Sd�hiled I�e: Prope�ty Ch�r:
E.aca�ion T7eta�s: � Detaila: Bac�a4_ Che�lc Cit�►Main
;4ction T�c�en:
_- _____-___ - i
, � � �
� , ��- �
C�- � ;
• (�� � �- �
� �� p(� ;
�
' � '�
� ;
� �
� � �
1 .
�- �
1 �
1
;
;
�
;
�
;
;
_ ._____ _ _ _ ______ __._____�
��P�_ �-�
,�ve�: �.,,,
Crsrr�e#icm Da�+e: ^ � � �z+en N+��exi
, v V! .rr �� .. n .. .
���s� f+�f '�r�a� �
Ci�yy af Fndl�y
�: �-�2-5t7� ��: 12
T�e� Se�t�ack�p�eck t��r� �rat,�#�j+�
�: Se� �z�re�: J�ie Xrarg
1W�+ess� 1iS LfJGAt�1�"K1l�Y 1� . 76�i71-9�#70
[l�e= _
�t L1e#ai�: 6��eia'�s: Bad�_ f�rec�Q�►ilan
Tat��
� a pi�ir� . �aacy �cat .
�
�
�
I
�
�
, .
9
�
�
�
�.___� ___ _� ...�e_. ___ �.._.. __.______ __� _._ �__.__ _ ___ �
f�e�ans�te P�� ��� � �
�..�_..�_._��......__.�.__�_...._..__.........____.� __. _....�_.�_ __--__
� '��
� _._..._..�._...............� _.__, ___............._�......._____________ ...__ _.�__.�._______ � �
�� C�S�e: 8��2�4�� � �i�ed