Loading...
Meter swap ti Request Number: 16017 Pubhc works Division Service Request Problem Address: 280 Longfellow St Requested By: Carol Halwrsen Department: WATER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 763-784-4952 Scheduled Date• 017-06-23 Scheduled Time: 10:30:00 ` ��� `� J ACTION NEEDED: Created by: Wendy Hiatt Date Created: 2017-06-15 ACTiON TAI�N: .........................�.._��,.�...��,1.....(................_/�:.._��:�....�..-......................................................................................................................................................................................................_.......................................... ..............................................................................................................................................................................................................................................................................................................................................................................:............................... ........................................................................................................................................................................................................................................................................................................................................................................................................... ......................................................................................................................................................... .......................................................................................................................................................................................................................................... ................................................................................................................................................................................................................................................................................................................................................................................................................. .................................................................................................................................................................................................................................................................................................................................................................................................... Status• In Progress Submitter Has Been r ' Contacted Date Completed: Completed by: �,��3- `� �-1�,� ��- � , ��ty o���oatey �j��� J����2�� � � • uvater De�artmen� S'�� (��(p�j � 5431 l�niversity Avenue�1E Fr6dley,MN 55432 753-572-356fi �,'iVe hereby authorize the City of Fridley and/or 6ts employees to�[o what is necessary to replace the water meter. !understand that the property owner is 4iable for the water line from the main to#he premise and all interior plumbing. (Per�i#y�ode 402.�6� I also hold the City of Fridley and/its employees harmtess for any damages�hat may occur while doing this operation. 7his to include,but not limited to valves,piping,walls,floors or the surb stop box ared service line. Irt understand t am also require to obtain a permit prior to any work,if necessary. FiNAL ME'fER READIfYG{o1d meter) � ` c.J � �� Name: �'�'� �iW►��/�` ' � Address_ � '�J �YL-����✓ 5� Phone!Yu r ' �/" , `"t �C�-Date ``L>��� � �� Signa�ture Witness Signature OLD MJE�ER# � = � ���� �LD READING _ � ' � ��� 1�iE�1/IYtETEit# - [�� `"�>� •� NE�REAf�INC; �� E��# �� �2�2� �c� FRIDLEY CITY CODE �6�Ad�TER 402oWA�'E9i,5��3R{1A 9NA7'ER AND SANITARY SEWER A�MINISTBtA�iON (�ef Ord N�113,464,565, 566, 629,538,562,922,9�8, 1144, 1156,1193.) 402.5 PERMIT FEE Prior to constructing or repair�f any water of sewer line connecting the existing municipaf system and any house or building for whith the application is made,the owner or contractor shall be required#o obtain a peranit for such connection,and shall pay a permit fee as provided in Chapter 11 of,this�ode. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by Khe City as a proper and suitable co�nection. 402A6 lt�PA1R5 AIVD MAINTENANCE TO CONNECTION After the initial connection has been rnade to the water service curb stop box or the sewer(ead at the property line or a water service lead has been e�ctended to the property line for connection,the app(icant,owner,or occupant or user of such premises shall be liable for al(repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the Qroperty oarner cequests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenartce and/or repairs,inciuding necessary street repairs at a rate set annualty by an administrative poliry. It shall be the responsibility of the applicant, owner,occupant or user to perForm standard maintenance of the sewer service line from the premises to the main including debris clearing o� roo�zutting and to rnaintain the water service curb stop box for operability and at such height as will ensure that it remains above the�nished grade af the iand or�property. (Ref 638,1156,1191j