Meter Swap �
� Request Number: 15917
Public works Division
Service Request
Problem Address: 385 Longfellow St Requested By: Mr Bisogner
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 763-258-6522
Scheduled 2017-06-15 Scheduled'Iime: 02:00:00
` � ,� ,-
ACTION NEEDED:
Created by: Wendy Hiatt Date Created: 2017-06-09
ACTION TAI�N:
................................................................-�-�`��.: �I , -,��.�---
........... ................................................................................................................................................................................................................................................................................................................................................................................
................................ ... ....................................... . ....................................___ ............._._............................................ ................ .............. ... . ........ ......................................................................
..............................................................................................................................................._........................................... .............................................................................................................................................................................................._.
°5
........................................................................................................................................................................................................................................................................................................................................._........................_......._.....................................
- ...................................................................................................................................................................................................................................................................................................................................................................................................................
Status: In Progress Submitter Has Been r
Contacted
Date Completed: Completed by:
� " i �` � � ��-�
�o�,����da�� 3�� — ���� —4 2
llvater Departmen�
� �431 l�aaiversity A�enue NE �� �� '�,J" ?j
Friclley,MN 55432
7�3-572-356�
�/'Afe hereby authorize the City af Fridtey and/or its employees to do what is necessary to
replace the water meter. I understand that the property owner is liabte for the water line from the enain to#he premise and all irrterior
pBumbi�g. {Per�Lity sode 402.06) i also hold the�ity�f Fr9diey and�ts employees harmtess for any damages that�nay occur while doing this
operation. This to include,but not 6imited to vafves,piping,walls,floors or the curb stop box and service line. In understand I am also require
to obtain a permit prior to any�rork,if necessary.
F6NAL ME'fER READING{old sneterj �C�� �C� C �..'
Name: I`1 r V�� ��i U �rl 1'� Address l� G� "–"• �1��C. L��:� ,�`-
Phone Number_�� �" � � �k���ate � — � � ` �� ,
�ignaiure ---- Wetness Signature
rJLD NlETER# �� � � ` ��
�
�
C�LD READINC; ����� l �� �� D V �!�t n�1�7� � SrIO(,l��� � •
�
1VE9t1/ �/tETER# `� �� �"� ���.
NEi�l� �El�DiNG �
E�T## G ���� ��ll�.
FRIDL�Y CI'9'Y CODE
CFdA�TER 402.iNA�'E9t,ST�RM WATElt/AND SANITARY SE1NEft
AIDMINIS�fRA�101�1
(Re$Ord No 113,464,565,56fi,�29,538,662,922,988,1144,1156,1191)
402.5 PERMIT FEE
Prior to constructing or repair�f any water of sewer line connecting the existing municipal system and eny house or building for which the
application is made,the owner or contractor shall be required to obtain a permit for such connedion,and shall pay a permit fee es provided in
�hapter 11 of this�ode. After such connection has i�een made,the 4Vater and Sewer Department sha11 be notified. It shall be unlawful to cover
any Connecting line until an inspection has beert made and such connection and the worfc incident thereto has been approved by the City as a
proper and suitable connection.
402.06 ltEPAfRS AIYD MAINTENANCE TO CONNEC'TION
After the initial connection has been made to the water service curb stap box or the sewer(ead at the property line or a water seroice(ead has
6een extended to the pr4perty line for connection,the applicant,owner,flr occupant ar user of such premises shall be liable for all repairs
required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner
requests maintenance service or repairs he performed by the City,the property owner shall be charged for the costs of the maintenance and/ar
repairs,inciuding necessary street repairs at a rate set annualty by an administrative poiicy. It shall be the responsibility of the applicant,
owner,occupant or user to per€orm standard maintenance of the sewer service line from the premises to the main including debris clearing or
root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade af the land or�roperty. {Ref 638,1156,1191j