Meter Swap � Request Number: 12800
Public works Division
Service Request
Problem Address: 7351 Lyric Ln Requested By: William Best
Departmeat: WATER Address: 7351 Lyric Ln
Fridley,MN 55432
Problem/Issue: INSTALL AMR METER Phone Number: 763-600-3302
SchedW ed Date: 2017-01-18 Scheduled'Il me: 09:00:00
��l,J � � ir\�`1
ACITON NEEDED:Install AMR
Created by: Beth Kondrick Date Created: 2017-01-09
ACITON TAKEN:
.
��-5��.�,��ec:�:. . _��..�.__.......�...
Status: Jn Progress Submitter Has Been r
Contacted
Date Compieted: � -- ����-- �� Completedby:
l,
��zy or rriaoey � /
Water Department � �l��� �
6431 University Avenue P1E
, Fridley,MN 55432 � ����`���
. � � � -
. 753-572-3566
1/we hereby authorize the City of fridiey andJor its employees to do what is necessary to
replace#he water meCer. 1 understand that the Qroperty owner is tiable for the water line trom the main to the premise and all irrterior
plumbing. (Pee City code 4Q2.06) i aiso hotd the�iry erF FridleY and/'rts employees harmless#or any damages that may occur while doing this
operetion. This to include,bufi not limi#ed to valves,piping,wafls,floors or the curb stop boz and service line. !n understand f am also required
to obtain a permit prior to any wortc,if necessary.
FINAL METER READIAIG(oid meter) 1 1 C.� I �-���
Name: �,��'��"�� 1����)� Address � ��1 l�M�(�� � l-�.
Phone Plumber � /�� ' �F�� ` ��� Date �`�- � �; — � l
Signat ��yv L-�. / r " ,� �� Witness Signature
� ��
�
OLD METER# �� K� �� �'���
OLD READIAIG ���� / � �C�
NEW METER# L 6 � � �� ( ,�
a
NEW READIPIG �
ERT# �����4� �� �� _
FRIDLEY CITY CCIDE
CHAPTER 402.WATER,STORM WATER AND SANIl'ARY SEWER
ADMISVISl'RATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,I156,1191)
402.5 PERMIT FEE
Prior to constructing or repair of any water of sewer line connecting the existing municipat system and any house or building for which the
application is made,the owner or contractor shali be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shali be notified. it shal{be uniawful to cover
any connecting line until an inspection has been made and such connection and the worh incident thereto has been approved Isy the City as a
proper and suitable connection.
402.06 REPAIRS AND MAtNTENAAiCE TO COtYNECTiON
After the initial connection has bee�made to the water service curb stop box or the sewer lead at fihe property line oc a water service lead has
been extended to tfie property line for connection,the applicacrt,owner,or accupant or user of such premises shali be liable for ail repairs
required to any water{ine and sewer lines necessary for connection of the premises from tfie main to the premises. if the property awner
requests maintenance service or repairs be perFormed by the City,the property owner shall be charged for xhe sosts of the mairrtenance andjor
repairs,including necessary street repairs at a rate set annuaily by an administrative policy, It shafl be the responsibility of the appiicant,
owner,occupant or user to perform standard maintenance of the sewer service line from the p�emises to the main inctuding debris clearing or
root cutting and to mairrtain the water service curb stop hoK for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)