Loading...
Meter Swap • Request Number: 12524 Public Works Division Service Request Problem Address: 7545 Lyric Ln Requested By: Chris Huber Depsrtment: WA1ER Address: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 612-221-8970 Scheduled Date: 2016-12-28 Scheduled 1ime: 10:00:00 � ��� L ACTION NEEDED:AMR Created by: Wendy Hiatt Date Created: 2016-12-20 ACTION T.AI�N: � ..._�...,�5.�::�._�.t�'................_......................_�tiL��-- ........................................................................................................................................................__..........................................._._................................................................._................................_....._..............._._._....................._........_....__ Status: In Progress 5ubmitter Has Been r Contacted Date Completed: ���� a�j�-�,� Completed by: ,A,�.. ���.. City of Fridley Water Department � � i � � � 6431 University Avenue NE Fridiey,MN 55432 �� �,�I �j-�—c�'1— 763-572-3566 !;we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 u�derstand that ihe property owner is liabfe for the water line from the main to the premise and all interior p{umbing. (Per City code 402.06) i also hold the City of Fridley and/its employees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walis,floors or the curb stop box and service line. In understand l am also reguired to obtain a permit prior ta any work,if necessary. FINAL METER READING(old meter) �� ��� t�L� Name:_1_ �d���� C'�'�tti h�'°� Address 1 J LJ� J �d'1 C, �,L'L. . Phone Number�t�- ` 2-Z�� 1� Date ��' ��'��� ''1 , :� _�_. �Signature b . _ � ..�- WitnessSignature OLD METER# t � GI� �� ,J�� 1 OLD READING d � �� J�� NEW METER# l� N �� �I NEW READING � ERT# l9 �-)�� ��' � ` 1 FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SAtVITARY SEWER ADMINISTRATION {Ref Ord No 113,464,565,566,629,638,662,922,988, 1144,1156,1191) 402.5 PERMlT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or buiiding for which the application is made,the owner or contractor shall be required to obtain a permit for such connection,and shali pay a permit fee as provided in Chapter 11 of this Code. After such connedion has been made,the Wate�and Sewer Department shall be notified. it shall he unlawful to cover any con�ecting line until an inspection fias been made and such connection and the work incident thereto has been approved by tbe City as a proper and suitabie connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECT{ON After the initial connection has been made to the water service curb stop box or the sewer lead at the prope�y line or a water seavice lead has been eztended to the property line for connection,the apQlicant,owner,or otcupant or user of such premises shall be liabie for all repairs required to any water fine and sewer lines�ecessary for connedion of the premises from the main to the premises. If the property owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the maintenance and/or repairs,including necessary street repairs at a rate set annually by an administrative poliry. It shal{be the responsibility of the applicant, owner,occupant or user tv perform standard maintenance of the sewer service(ine from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)