Meter Swap .
� Request Number: 13213
Public Works Division
Service Request
__ _ _ _ _ _ _. _ __ __.
Problem Address: 7472 Mcldnley St Requested By: John Kabiri
Department: WATER Address: 7472 Mcldnley St
Fridley,MN 55432
Problem/Issue: INSTALL AMR METER Phone Number: 612-803-6939
Scheduled Date: 2017-02-OS Scheduled'ISme: 1130:00
� � � ��' ! L`�
ACTION NEEDED:
Created by: Beth Kondrick Date Created: 201'7-02-02
ACTION TAKE��� ��` '
1r/�"� � �
Status: 1n Progress Submitter Has Been r
Contacted
Date Completed: Completed by:
41fa�ea-��Sar�rr�ent �/
6431 lOnivea-sitv�1�vereue NE Cj��" ��i2..��
Fridaey,Mf1i 55432
763-572-3556 � � � ` J 1 � �� L� –�}' �
, �/�"°� her�eby authorize the�iiy arf Fridley andJor its empioyees to slo wltat ds necessary ta
replace the water meter. �vnderstand tt►at the proper�ty oarner 6s liabte fos the+erater line#rom the main to the premise and all interior
plurrsbing. {Per City cosle 402.46� i alsa�old the C'rty a�f Feidiey and�ts employees harmless#or eny damages tt�at anay otcur while sfoing this
uperation. This ta 9nclude,but not tim"rted to vaives,piping,wails,#loors or Lhe curb sto�O boz and servece line. fn understand l am also requi�
#o obtain a germ;t pr9o�r to aoy�ror4c,if necessary.
�FINAL 9111ETER READIPiG{oid meter} �, �� � �r `�
c
Name• �� ("��,�_ ;, y ^f Address �
�
Pfione Number �l-�-• p�e 2.� ,�— ��
Signature__ ✓���� Wstness Signature
�---
�LD MET�ii# - }��� * �. �
OLf�f�EAD1dVG Y 1��� � �U�
A1EW METER# ��L�� ��
NE�1/RE/�.all�tG �
v
���#�� �����
FFi1�3l.�Y�il'Y�taDE
CFiAP3'Ei8 402.tIVATER,STOR6V!4V/�1�'ER AND SAPJiTARY SEWER
ADN11N 9STRA1'84�A1
(�ief Orst No 113,464,565,566,629,638,�62,92Z,988p 1144,I15Fi, I1J1�
402.5 PERNflT FEE
Prior to canstructing or repair of any water of sewer line connecting the existing municipaf system and any house or building for which the
appiication is made,the owner ar contractor shal(be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of th�s Code. After such connection has been made,the Water and Sewer Departmerrt shall he aotified. {t shafl be uniawfui to cave
any connecting tine untif an inspection has been made and such connection and the r+rorlc incidecst fihereto has been approved by the City as a
proper and suitable conneetio�a.
402.05 REPAIRS laR1D MAINTE911AAICE TO CONIYECTIOPI
A�fter the inr�ial connectiort has been made to the water service curb stop box or the sewer lead at fihe property iine or a water service lead has
been extended to the property)ine for connectian,the appiicarn,owner,or occupan#or user of sucfi premises shap be fiable foc a(I repairs
rec�uired ko any water line and sewer lines necessary for sonnedion of the premises from the main to the premises. if the property owner
requests mairrtenanee se�vice or repairs be perFormed hy the City,the property awner shatl be charged for the tosts of the mairrtenance and/oa
repairs,inciuding necessary street repairs at a rate set annua!{y by an administrative po4'scy, it shatf be the respansibitity of the applicarrt,
owner,occupant or user to perform standard mairrtenance of the sewer service line from the premises to the ma�n 3ncluding debris cieari�g or
root cutCing and tv maintain the water servica curb sfiop box foc operability and at such height as wili ensure that it remains above the finished
grade of the land or�roperty. (Ref 638,1156,1191)