Meter Swap .
" Request Number: 12465
Public Works Division
Service Request
Problem Address: 7493 Melody Dr Requested By: Mary Ann Hoffman
Deprrtmenit: WATER Address: 7493 Melody Dr
Fridley,MN 55432
Preblem/Iss�: INSTALL AMR METER Phone Number: 763-780-5911
Scheduled i�te: 201?-01-1 Schedaled'Itme: 10:30:00
� ��
ACiiON NEEDED:Install AMR
Crea�ed by: Beth Kon�ick Dxte Crented: 2016-12-15
A�k:"IION TAKENs "
,
��V1�GU�' Tz�-`,�-
Stxh�s: In Progess sabmitter A�Been �..
Contaeted
n�c�co��etta: '� ., l� ..�. �� com�ecea by: �' 1/i��
��oyr
City of Fridley � �� _ J.c�. �� ��J„—h _ � �
Water Department V
r 6431 University.Avenue NE
• Eridley,MN 55432 �O �O��j
763-572-3566 I
�/We hereby authorize the City of Fridley and/or its employees to do what is necessary ta
repface the water meter. I understand that the property owner is liable for the water line from the main to the premise and ail interior
p4umbing. (Per City code 402.06) 1 atso hold the City of Fridiey andJits employees harmless for any damages that may otcur while doing this
operation. This to incfude,but aot limited to vaives,piping,walis,floors or the curb stop boz and service tine. in understand 1 am also required
to obtain a permit prior to any work,if necessary.
FINAL METER READIPIG(old meter)__� ISJ�����
Name:� Y�V� �aH��` Address � !� �e�C)�y �Y`.
Phone Number L �3 � 7�d ~ � l L 1 Date �� �� ^ � l
�Signatur Witness Signature �—
OLD METER# � I l� �� f�,l��
OLD READING J�� �D��
NEWMECER# �� �I V���
NEW READING �
ERT# V� ��V���V ,
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ; .�
ADMINISTRATION
(Ref Ord No 113,464,5fi5,566,629,638,662,922,988,1144,1156,1191)
402.5 PERMIT fEE
Prior to constructing or repair of any water of sewer line connecting the existing municipal sysCem and arry house or building for which the
application is made,the owner or contractor shall be required to obtain a permit for such wnnection,and sha14 pay a permit fee as provided in
Chapter 11 of this Code. After such co�nection fias been made,the Water and Sewer Department shali be notified. it shall be unlawFul to caver
any connecting line untii an inspection has been made and such connection and the work incide�t thereto has been approved by the City as a
proper and suitable connection.
402.06 REPAIRS AND MAINTENANCE TO COfYNECTION
After the initial connection has been made to the water seroice curb stop box or the sewer lead at the property line or a water service lead has
been extended to the property line for connection,the applipM,owner,or occuparrt or user of such premises shall be liable for all repairs
required to any water line and sewer lines necessary for connedion of the premises from the main to the premises. If the property owner
requests maintenance senrice or repairs be performed by the City,the properry owner shalt be charged for the costs of the mairitenance and/or
repairs,including necessary street repairs at a rate set annually by a�administrative poliry. It shali be the responsiirility of the appiicarrt,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the mai�i�cludi�debris dearing os
root cutting and to maintai�the water service curb stop box fo�operebility and at such height as wiil ensure that it remair�s above the finished
grade aF the land or property. (Ref 638,1156,1191)