Loading...
Meter Swap 3 r� - ��� ���� ��i ' Request Number: 12354 Public Works Division Service Request Problem Address: 7311 Memory Ln Requested By: Ben Hedlu�d Department: WATER Addre�s: No address provided Problem/Issue: INSTALL AMR METER Phone Number: 763-786-3424 Sc�eduled Date: 2016- - � Schedaled 11�: 10:00:00 . � AC"IION NEEDED:AMR Created by: Wendy Hi�t Date Creattd: 2016-12-(13 ACTION TAI�N: I h ����;�. � I� � Status: In Pro ss Submitter Has Reea C, � Con�tacted Dat�Completed: Compieted by: / �— � —'�,,,_ �� ' � City of Fridley Water Department � 6431 University.Avenue NE �I a--S'�S`��`'��� Fridley, MN 55432 �� 763-572-3566 �l.' � �� � �/We hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. t understand that the property owner is liable for the water line from the main to the premise and all interior plumbing. (Per City code 40Z.06j 1 atso hold the City of Fridley and/its employees harmiess for any damages that may occur while doir�g this operation. This to include,but not limited to valves,piping,walis,floors or the curb stop box and service line. In understand 1 am also required to obtain a permit prior to any work,if necessary. FINAL METER READING(old meter)_�l{ � � q V{,/ Name: Address� �Y� 1 �t��(',��� �n Pho�e Number `�� 7�a JL ( p� �''l�' � ;10 Signature ' Witness Signature OlD METER# � � �� ��j � ..> OLD READING_``1 F� � ���.,! NEW METER# � 1 � � i"'�� NEW READING_ ( / ERT# � V � v �O FRIDLEY CITY CODE CHAPTER 402.WATER,STORM WATER AND SAN(TARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMiT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipai system and ar�y house or building for vrhid�the application is made,the owner or coritractor shall be required to obtain a permit for such connection,and shali pay a permk fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting tine until an inspection has been made and such connection and the work incident thereto has been approved by the City as a proper and suitable connedion. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service arb stop box or the sewer tead at the property(ine or a water service Iead has been extended to the property line for wnnection,the applicant,owner,or occupant or user of such premises shall be liabie for ail repalrs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. ff the property owner requests maintenance service or repairs be pe�formed by the C'ity,the property owner shall be charged for the costs of the mairrtenance and/or repairs.including necessary street repairs at a rate set annually by an administrative poliry. It shall be the responsibility of the applicaM, owner,occupant or user to perform standard mairrtenance of the sewer service line from the premises to the main inclu�r�deb�is dearing or root wtting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished grade of the la+zd or property. (Ref 638,1156,119!)