Meter Swap ` Request Number: 13033
Public works Division
Service Request
Problem Address: 1513 N Timber Ridge Requested By: Neil
Department: WA'IER Address: 1513 N Timber Ridge
Fridley,MN SS432
Problem/Issue: INSTALL AMRMETER Phone Number: 763-221-415�
Scheduled 2017-01-26 Scheduled'ljme: OI:OO:UO
~n�.� �� ��` )
t,
ACIION NEEDED:Install AMR
Crented by: Beth Kondrick Date Cre�ed: 2017-01-23
ACTION TAI�N:
�:�..����<',/�v�
Status: In progress Submitter Has Been �..
Coutacted
Date Completed: j...�/„,_1`'� Completed by:
6 �� /
�lk�
iAfate��epartpn�nt
6431�9niversit�r s�#venaae 9VE ` � � � � �
" Fritiley,MN 55432
• �s3-S7z-3566 �( � —S) ���Z'—v`�1
,I�e here6y authorize#he City of Fridley and/or iis empioyees to do what is rtecessary to
replace the water meter. !undersfiand that the properi•y owner is liable for the water line feom the main to the premise and all irrterior
piurrabing. {Per City code 402.06j i also hold the City af Fridley andJits emptoyees harmiess for any damages that snay occur while doing this
operatinn, This to'snclude,but not timited to valves,piping,walls,floors or xhe surb stop box and service line. In understand i am also require�
to obtain a permit prio�r to any�ror�c,�f necessary.
`'� C ��
F1NAL METER READING(otct meterj_� �
Name• t�" e�� I Address r`/ � i "' 1 �Wtb�°i� �`` Z°
Phone Number��� � ���� � 1� a� '1, '� t�Ll� "J V�
Signatare Witness Signature -"'
OLD METER# � �� c���
OLD READtWG � 4 � ��� `2�"
r ei��
NEW METER# �� I � ��"4 � Q�
NEW READIAIG �
ERT# V� �� / ���� .
FRIDLE1l CI'tY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMIAIISTRATtON
(R2f OPd MO 113�464�565�566s 629�638r 662�922s 9$8r 1144�I156�1191�
402.5 PERMIT FEE
Prior to constructiog or repair of any water of sewer line connecting the existing muniapaf system and arry hause or building foc which tfie
application is made,the owner or corrtractor shall be required to obtain a permit for sucfi connection,and shail pay a permit fee as provided irr
Chapter 11 of this Code. After such connection has been made,the Water and Searer Departmerrt shall be natFFied. Ft shall be unfawful tn caver
any connecting line unfil an irrspection has been made and such connection and the work inadecrt thereto has 6een approved by the C'�as a
proper and suitable connecCion.
402.06 REPWRS AND MA{WTEA(AAiCE TO CONNEC7'ION
After the initiai connection has been made#o the water service curb stop box or#he sewer tead at the property tine or a water senrice lead(�as
been extended to the property line for consiection,tfie appiicarrt,owner,or accupartt or user of such premises shaN be IiaWe for ail repairs
required to any water iine and sewer lines necessary for connection of the premises firom the main to the premises. ff the property cwrrer
requests maisrtenance service or repairs be perFormed by the City,the property awner shali be charged for The costs of the maiRttenance and/or
repairs,including necessary street repairs at a rate set annual(y by an administrative policy. it sbalf be the responsibil'rty of the appticar�t,
owner,occupant or user to perform standard mairrtenance of the sewer service tine from the premises to the main including debris dearing or
root cutting and to maintain the water service turb stop box for operabili#y and at such height as will ensure that it remai�u above the finished
grade of the land or property. �Ref 638,1156,1191)
:�.�. �