Loading...
Meter Swap , ' Request Number: 15953 Public Works Division Service Request Problem Address: 7871 Pearson Way Requested By: Matt Bushaw Dep�rtment: WATER Address: No address provided Problem/Iasue: INSTALL AMR METER Phone Number: 763-438-�940 ScheduledDate: 2017-06-14 r..� SchedWedTlme: 07:00:00 cr � � `( Y ACIION NEEDED: Created by: Wendy Hiatt Date Created: 2017-06-13 ACTION TAKEN: � ____J�!�.._v t� �� _._ __.__...._.___........_............._._.._.�..__. Status; In Progress 5ubmitter Hac Been �, Contacted Date Completed: Completed by: � 4 �� �/�� . � •_ - ._ � �ity of Frddley ���r �/���v — � �� , • Water De�arte�a�nt �4311Jn6versity Arreroue NE Fr�dley,MN 55432 7C3-572-3566 ��`Ne here6y authorize the City af Fridley and/or its empioyees to do what is necessary to replace the water meter. !understand that the property owner is liabie for the water line from the main to the premise and all irrterior plurnbing. (Per City code 402.U6) I also hold the City of Fridteg andPts employees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walts,floors or t8e curb stop box and senrice line. In understand 1 am also requir� to obtain a permit prior to any work,if necessary. FINAL METER REAqING(old meter) ������ Name:_]`�5�'�GE Y^,�"i x�D�N� Address 1 Phone!Yu r �EJ � �V �_'��'�'v Date I�_ 4�V �� � Signatu e Witness Signature ' ```r OLD METER# _ �S�����T � OLD READING _ V '�1 q 2 � MfW METER# � ` v�� � O� �Ew R�►DfN�O E�T'� _� �1��� � �:� FRiDLEY CITY CODE CHAPTER 402.Wi4TER,STORNf WATER AND SANlTARY SEWER ADMINISTRAtTION (tief Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191j 402.5 RERMIT FEE Prior fio constructing or repair of any water of sewer line connecting the existing municipat system and arry house or building for which the application is made,the owner or corrtractor shall be required to abtain a permit for such connection,and shafl pay a permit fee as provided in Chapter 11 of this Code. After sucfi cannection has been made,the Water and Sewer Departmerrt shail be notified. It shall!�untawful to cover any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the Crty as a proper and suitable co�nection. 9�02.06 REPAIRS AIYQ MAINTENANCE TO CONIVECTION After the initial connectiort has been made to the water service curb stap box or tfie sewer tead at the property tine or a water senrice lead has been extended to fihe property line for connection,the applicarrt,owner,or occupant a�user of wch premises shall be liabie for all repairs required to any water line and sewer(ines necessary for connectio�of the premises from the main to the premises. If!he property oarner requests mai�tenance servtce or repairs be performed by the C'ity,the property owner shatl be charged for the costs of the maimenance and/or repairs,inctuding necessary street repairs at a rate set annually by an administrative policy. It shall be the responsibility of the applicarrt, owner,occupant or user to perForm standard mairrtenance of the sewer service line ftom the premises to the main including debris dearing or root cutting and to maintain fihe water service curb stop box for operabitity and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191' � paubzg � -��� n'�� a� S :sS{.zeuta� ( ,� �,�,� axEy� �ua�ua�2tdag Q buipEag �uaiva�Etdag l� -5�.� f-.s ;°H �uauza��tdag �<� G �� � uip�a� .za�a�I PTO �' Q�� �9� .zaqumH .za�ay� PZO � �=c{�l�'C a�pQ �� 7-y� .�.,,t�� ' an�Ex ~��1 °-eoS'��� ! .�i cS �, ssasPPK l �1-�v� � V� ;^fK � ������ �� �.�,� ��� . ry€W", h .. Y�� "� � } � >�,'�,:�� 'h, �.�, �:'07 1. ����.'�,�E ��, ,�f.��-'�_ '�i x � *t._r�,�.;. ��� ���i���� '6� L� �t ,