Loading...
Meter Swap ° Request Number: 15623 Public works Division Service Request Problem Address: 341 Pearson Way Requested By: Je�ette Department: , WA1ER Address: No address provickd Problem/Issue: INS1"ALL AMR METER Phone Number: 763-202-7D26 Scheduled Date: 2017-Ob-OS Schednled'Ilme: 01:30:00 � AC�ON NEEDED: Created by: Wendy Hia�t Date Created: 2017-OS-30 ACTION TAKEN: _._...__��__ ......................_�C�' `.:�-- �- :� ....___..........................................__._..................._..........._._...._.�_�__._..�.�.._....._............................_..__.............__..._..............._____-___. _......._. �, f z . Status: In Progress Submitter H�u Been r, Coatacted � Date Compteted: f „ .., � ,_ f `� Completed by: ����� �'�i � �o�,����ad'�Y � I 3 '�I ��f z��D 3 wat�r�e�a�tment ' 6431�niversity Avenue NE � � '! , r , � � Fr�dley,MN 55432 ��� 763-572-3566 I/we hereby authorize the C'rty of Fridley and/or its emp(oyees to do what is necessary to replace the water meter. i understand that the pro�erty ouvner is liabie for the water line from the main to the premise and all interiar plumbing. (Per Lity code 402.06j I also hold the Crty of Fridiey and/its empioyees harmless for arry damages that may occur while doing this operation. This to include,but not limited to vatves,piping,walis,floors or the curb stop box end senrice line. In understand 1 am also requir� to obtain e permit prior to any wor[c,if necessary. F9tVAL METER READtNG(otd meter) � �� �e �J D Plame: �����1�Q��'�,� Address '�Cl.�0� Phone lYumber `�� '�-� �p�•VI p�_ �� -- �� Si nature Witness Signature �— � � o�o��E�� � -����w i��� � � OLD READtNG _ ���� �� � v NEW NiETER#_ � � ��„� V�� NEW READIMG � ERT# tp( 3�� �� � FRIDLEY CITY CODE CHQi�TER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATIOPt � (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and arry house or bui(ding for which the application is made,the owner or contractor shaH be required to obtain a permit for such tonnection,and shail pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shali be notified. ft shall be unlawful to cover any connecting line urrtif an inspection has been made and such connection and the work inadent thereto has been approved 6y the City as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial cunnect+on has been made to the water service curb stop box or the sewer lead at the properly line or a water service lead has been extended to the property line for connecfion,the applicarrt,owner,or occupant ar user of such premises shall be liable for a11 repairs required to any water line and sewer{ines necessary for connection af the premises from the main to the premises. If the property oarner requests maintenance service or repairs be performed 6y the City,the property owner shali be charged for the cosCs of the mairrtenance and/o� repairs,including necessary street repairs at a rate set annually by an administrative poiiry. It shall be the responsibitity of the applicant, owner,occupant or user to perform standard mairrtenance of the sewer senrice line from the premises to the main including debris dearing or root cutting and to maintain the uvater service curb stop box for operability and at such height as wi(1 ensure that it remains above the finished grade of the land or property. (Ref 638,1155,1191)