Meter Swap .
.
Request Number: 16398
Public works Division
Service Request
Problem Address: 129 Rickard Rd Requested By: Nicole
Department: WATER Address: No address provided
Problem/Issue: INSTALL AMR METER Phone Number: 763-574-9130
Scheduled Date: 2017-07-20 .--� Scheduled 13me: 08:00:00
� � r
ACTION NEEDED:
,,;�rente��: Wendy Hiatt Date Created: 2017-07-19
� � � � ° �
� ` AC'1�'TAI�N:
ta �� �� �f�
_ ..... __._.........................�_�__._.___...._................_.._...._� ..._._. �..
...........................______._.._ _.._....._. ..._. w.
..._. ...._.._ _._._........._..._.._.........._....._..._...._.____..__...__.._..___.
� �,�``� ���
___..._.....................................__.__._...._. _......_....._..._........_._........_ ._..__....�^...___..__ �� ��'����„�
__.__ _.__... ._...._..._......_.....__.._....�..___._._...__�_..___....._......._..._...._._.._...........___.�__.___....__ __._.
��' .��,- -�.
���R •
Snbmitter Has Been ' ���
Status: In Progress r' `��;�
Contacted
r
�. _
Date Completed: "''J �a � �� Completed by: `�( , � �:�
l " �.J �G,
;f:y i
�
•�
�.` ��
` �;�y����e�iey
�����/�1��� ���
' Mtater�e�saa�trve�nt S�� -�-���
6431 lJr�iversity Avenue NE
Fridley,MIU 55432
753-572-3566
i✓'"�e hereby authorize the City of Fcidfey and/or its employees to do what is necessary to
repiace the uvater meter. t unde�stand that the property owner is liable far the water line from the main to the premise and all interior
plumbing. (Per S'ity code 402.06) 1 also hold the City of Fridley and/its employees harmless#or any damages that may oaur while doing this
operation. This to include,but not limited to valves,pipin�watls,floors or the curb stop baz and service line. In understand 1 am also requirE
to obtain a permit pr6or to any wark,if necessary.
FINAL METER READINtG(old meterj ���� � � �
Name• �"��•U�'Q I�kkldress__ I�q �v�l�`v �iL`
Phone Number ' �" �p� �— 2,�-- ��
�(5ignature � Witness Signature �—
�..
OLD ME'i'ER# ��``' �v��/
OLD READlNG �� 1� �� "� �
� NEWMETER# � t����✓ �
NEW READING D
E�# `l�.�tl ��v � .
FRIDLEY CITY CODE
CHAPTER 4�02.WATER,STORM WATER AAID SANITARY SEWER
AOMINISTRAT{ON
(I�ef Ord No 113,464,565,566,629,638,662,922,988,1144, 1156,1191)
402.5 PERMlT FEE
� Prior to constructing ar repair of arry water of sewer line connecting the existing municipai system and arry hou�or building for which the
application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in
thapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shait be notified. It shall be uniaarful to cover
any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the Ctty as a
proper and suitabie connection.
402.06 REPAtRS AiYD MAINTEMAPtCE TO CONNECTION
After the initial co�nection has been made to the water service curb stop box or the sewer lead at the property line or a water senric�fead has
been extended to fihe property line for connection,the applicant,owner,or occupant or user o�f such premises shall be iiable for all repairs
required to any water line and sewer liaes necessary#or connection of the premises from the main to the premises. If the property owner
requests mairrtenance service or repairs be performed by the�ty,the property oarrter shall be charged for the costs of the mairrtenance andJor
repairs,including necessary street repairs at a rate set annually by an administrative poliry. It s6all be Lfie responsibility of the appiicanfi,
owner,occupant or user to perForm standard mair►tenance of the sewer service li�e from the prem�ses to the main including debris ctearing or
root cutting and to maintain the water service curb stop hox for operabil'rty and at such height as wiil ensure that it remains above the finished
grade uf the land or property. (Ref 638,1156,1191)