Loading...
Meter Swap " Request Number: 16037 t Public works Division Service Request Problem Address: 8120 Ruth Circle Requested By: Kuceli Department: WA1ER Address: No a�ress provided Problem/Issue: INSTALL AMR METER Phone Number: 651-785-4160 Scheduled Date: 2017-06-19 Scheduled 1lme: 10:30:00 �S�'�• �J n� � �� !vs � ACITON NEEDED: Created by: Wendy Hiatt Date Created: 2017-06-16 AC'IION TAI�N: ._ ��. __...�.�-I�:__�--.___ _._............____.._........_._.__.. Status: In Progress Subm�itter Has Been r, Contacted Date Completed: Completed by: C� �l°I-4r1 �'�t�- � City of Fridley �r (� �— 5 / ���� �V� Water Departrnent � ,r � � 6431 University Avenue NE � ���r/ Fridley,MN 55432 � 763-572-3566 ��We hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and ali interior plumbing, (Per City code 402.05j I also hold the Ciiy of Fridley and/its employees harmless far arry damages that may ocwr while doing this operation. This to include,but not limited ta valves,piping,walis,floors or the curb stop box and service line. In understand t am also required to ohtain a permit prior to any work,if necessary. FINAL ME7ER READING(otd meter) ��� �� Name• � V(�QiL� Address_�4� ls'�•� Phone Number ��`���� �p0-�Date aU� 1� 1�— � 1 }�,S�g�n�ature �►" "�1J�'"� Witness Signature Q' OLD METER# _ (�"1 U`"I ��� � OLD R€ADING Z�' �� ��O NEW METER# "'t��� 2-�2—� ' NEW READING � E�-# �l �°I2-- l � �� fRiDLEY C17Y CODE CHAPTER 402.WATER,570RM WATER AND SANITARY SEWER ADMINISTRAl'ION (Ref Ord No 113,464,565,566,6Z9,638,662,922,988,1144,1156,i191j 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system a�d arry house or buiiding for wfiich the application is made,the owner or contracto�shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Se�nrer pepartme�shall be notified. ft sha�i be uniawful ta cover any connecting line until an inspection has been made and such connection and the woric incident thereto has been approved by the City as a proper and suitab{e connedion. 402.06 REPAIRS AAID MAINTEAiANCE TO CONNECTION After the initial connection has been rnade to the water service curb stop box or the sewer lead at the property itne or a water serviae lead has been extended to#he property line for connection,the applicant,owner,or occupant or user of such premises shal)be liable for all repairs required to any water line and sewer tines necessary for connection of the premises from the main to the premises. ff the property owner requests maintenance service or repairs be performed by the C"rty,the property owner shail be charged for the costs of the maiMenance and/or repairs,incfuding necessary street repairs at a rate set annually by aa administrative policy. It sfiall be the responsibilifiy of the applicant, owner,occupant or user to perform standard mairrtenance of the sewer senrice line from the premises to the main including debris cfearing or raot tutting and to maintain the water service curb stop box for operability and at such height as wiil ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)