Loading...
Meter Swap � Request Number: 16933 Public works Division Service Req�est Problem Address: 7411 Tempo Terr Requested By: Phoebe Masakara Department: WA'IER Address: No ad�ess provided Problem/Issue: INSTALL AMR METER Phone Number: Scbeduled Date: 2017-09-08 Sc6eduled T'ime: AC"�ON NEEDED: Created by: Wendy Hiatt Dnte Created: 2017-09-08 ACTIOPi TAKEN: Old meter#18124554 Old reading:914650 New meter#4890760 ERT#71820668 Statas: Completed ���er Has Been r, Cont�ted Dnte Completed: 2017-09-08 Completed by: Jake Aspenson Hours City of Fridley 3 r �- Sz � 23� P d� Water Department 6431 University.Avenue NE , � , Fridley,MN 55432 � r'` ` 763-572-3566 �� � r�� J-��� �/We hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. 1 understand that the property owner is liable for the water line from the main to the premise and all iriterior plumbing. (Per City code 402.06j 1 also hold the City of Fridley and/its employees harmless far any damages that may occur while doing this operation. This to include.but not limited to valves,piping,walls,floors or the curb stop box and service line. In understand 1 am also required to obtain a permit prior to any work,if necessary. I FINAL METER READfMG(ald meterl � �� `� � � Name: Address ! l �I ��"l�� �•1�{^ • I Phone Number Date �� v � � l Signature_;.1� r �``�ti+'C� ��-�. • Witness Signature �� � �c� O!D METER# � � ��� �'J � �0LD READING � f 1 ��0 NEW METER# � ��`� � "� �� NEW READING v ERT# � c ��► � � � g � � . FRIDLEY ClTY CODE . CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191j .�� 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and arry house or building for which the application is made,the owner or contractor shali be required to obtain a permit for such connection,and shall pay a permit fee as provided io Chapter 11 of this Code. After wch connection has been made,the Water and Sewer Department shall be notif'ied. It shail be uniawful to cover any connecting line untii an inspection has been made and such wnnection and the work incident thereto has been approved by the C�ty as a proper and suitable connection. � 402.06 REPAIRS AND MAINTENANCE TO CONNECTION �, ` After the initial connection has been made to the krater service curb stop box or the sewer lead at the property line or a water service fe - been extended to the property line for connection,the appiicant,owner,or occupant or user of such premises shall be liabie for ali repairs � required to any water line and sewer lines necessary for connection of the premises from the main to the premises. If the property owner requests mairrtenartce service or repairs be performed by the CFty,the property owrser shall be charged for the costs of the mair�terrance and/or repairs,including necessary street repairs at a rate set annuaily by an administrative poliry. It shail be the responsibii'rty of the appiipM, owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operabiliiy and at such helght as will ensure that it remains above the�nisHed grade of the land or property. (Ref 638,1156,1191) � 1 W t `� � .�.. , � � �. A� �����