Loading...
Meter Swap � �, '' . Request Number: 12584 Public works Division Service Request Probtem Address: 7401 Te�o Ten Requested By: Jane Tradup 7401 Tempo Ten Dep�rtmeat: WA'IER Address: Frid[ey,MN S343Z Problem/tssne: INSTALL AMR METER Phone Namber: 612-412-0616 Sched�iled DAte: 2017-01-06 Schedaled Ti me: O t:34:U0 � � 3 AC1iON NEEDED:Install AMR � Created by: Beth Koncirick Date Cre�ed: 2016-12-27 ON T � Y�. �j \ �i� � Stat�: Ia Progess Snbmitter Haa Been �. Coutacted �; �: � Date Completed: Completed by: �� � � �� __ . � � City of Fridley Water Department � � a�v�r)a-- 6431 University Avenue NE ���� � . "� Fridley,MN 55432 S. � � r 763-5723566 � � � 1/we hereby authorize the City of Fridley and/or its employees to do what is necessary to replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and ali irrterior plumbing. (Per City code 402.06) 1 also hold the C'ity of Fridley and/its empioyees harmless for any damages that may occur while doing this operation. This to include,but not limited to valves,piping,walls,floors or the curb stop box and service tine. in understand I am also required to obtain a permit prior to any work,if necessary. FINAL METER READING„(cld meter) � �� ��� Name��1�(�.Q� lr�� Address 1�V 1 ( '�� Phone Number `� � � 1� Date �,� � ' � �Signature "`��`�- !�^� """ Witness Signature OLD METER# ���� ����J OLD READING � �/� �O� � NEW METER# �'� 1�1 tJ��D NEW READING �J E�# ���� o��q � FRIDLEY C17Y CODE CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER ADMINISTRATION (Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191) 402.5 PERMIT FEE Prior to constructing or repair of any water of sewer line connecting the existing municipal system and any house or buildirq�for which the application is made,the owner or cor�trattor shall be required to obtain a permit for such�nnection,and shali pay a permit fee as provided in- Chapter 11 of this Code. After wch connection has been made,the Water and Sewer Department shall be natified. It shail be unlawful to cover any connecting line ur�tii an inspection has been made and such connection and the work inadent thereto has been approved by the City as a proper and suitable connection. 402.06 REPAIRS AND MAINTENANCE TO CONNECTION After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has been extended to the property line for connedion,the applicant,owner,or occupaM or user of such premises shail be liable for all repairs required to any water line and sewer lines necessary for connection of the premises from the main to the premises. if the property owner requests maintenance service or repairs be performed by the City,the property owner shall be charged for the costs af tfie maintenance and/or repairs,including necessary street repairs at a rate set annually by an administrative poiiry. It shall be the responsibilliy af the applipM, owner,occupant or user to perform standasd maintenance of the sewer service line from the premises to the main induding debris ciearing or root cutting and to mairitain the water service curb stop box for operability and at such height as wili ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)