Meter Swap '� �—'1� �-fSZ�Cf��f c��?��cJ
� INSTQLLATION
�.n� AUTOMATIC METER READER
FRIDLEY ,
Address ��� ����� '� (
Name Fc�'tN4�� �RCt.r'�A4,
Date ��,'`� �:�t d�
Old Meter Number t
Old Meter Reading ��
Replacement No. �- �C�� �
Replacement Reading �
Replacement Make �`�
ERT# .��3 ( �� l�U'�,
Replacement ERT#
Remarks:
��,�1 Signed:
� �_�__:._ _.�._�__ _.._..... ___.�
�
���qi� .�
� _____ . .�___. _�_ � __ .__�____________�_�_ �
� _ --_y
i �
�
-�
E
. � � �
__ _.___._._ _____. ��. � .�.._._______�_� .
_____�_. � _�
� � � �
� � �
�
. �
�
, �l�1 � l._..�..�.� �l���
, :6��pea� n����
�
_�U�d� �-��-� # .�a��� ���y
��"0 �, � :�uipe�� Rlt�
�
1._..-'l�%l ����'J #���Il� RI�i
=���rr
t�v =�� ���
��a � �aQ=� �u��s -���
���a�s�.�-z�� =�� ���� =�
- . nn
��1#� =���3 ���1l�f��! ��1 �'.
ZC�I4�f'8 ���1 �l�-Zl-1� ����f
��� ����� �
� ����� ����
Hiatt, Wendy
From: Hara, Sandra
Sent: Friday, August 10, 2012 11:56 AM
To: Hiatt, Wendy
Subject: AMR appt scheduled
Hi,
I heard from Kathy Garman from 6366 Pierce St NE. The appt is for Thursday Aug 16'"at 1 pm. Her phone number�s 612-816-0151.
N�an�
Sandi Hara
City of Fridley
Utility Billing
763-572-3529
1
City of Fridley
Water Department
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
��We hereby authorize the City of Fridley and/or its
employees to do what is necessary to reptace the water meter. I understand that the propertY owner
is liable for the water line from the main to the premise and all interior plumbing. (Per City code
402.06) I also hoid the City of Fridley and/its empioyees harmless for any damages that may occur
while doing this operation. This to include,but not limited to;valves,piping,walls,floors or the curb
� stop box and service line. I understand!am also required to obtain a permit prior to any work,if
necessary.
Final meter reading(old meter) �� �� ���
Name• Address:_ ��� �t���
. Date: ��� ��
phone Number. P---
Signature:
. Witness Signature: � .
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER,AND SANtTARY SEWER
ADMtNISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144, 1156, 1191)
402.05.PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shail pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be noti�ed. It sha�l be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06. REPAIRS AND MAlN7ENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be liable for all repairs required to any water line and sewer tines
netessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shaN be chargetl for the costs of the
maintenance andior repairs, including any necessary street repairs,at a rate set annually by an administ�ative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
° the sewer service line from the premises to the main including debris ciearing or root cutting and to maintain the
water service cur6 stop box for operability and at such height as witl ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)
---
_ _ --- �
- ---— ..�„��
-- —___�._ --
.4, ,, --_ �-.,.. '
. ,
....__�. ..u.,..,�-�.r,w .�
�.�,�.,...�..