Loading...
Meter Swap r����s-��-�-�� '� (;�-L'�� INSTALLATION �rnroE AUTOMATIC METER READER ER(DLEY Address 1�'1��� 1�� Name ��-�ks� l"aC'�'`�•������ Date ���''�� Old Meter Number � F� ��� Oid Meter Reading � Replacement Na . `������ Replacement Reading � Replacement Make �!� �' ERT# �_��Jl.� ��� C-, Replacement ERT# Remarks ��,�� Signed: �M__,A_ ___..�_a�. _ �.e�,..._ .� �� ` ��� � . � - _ �_. .__ ______.____________ _ __ ._.____ _� _ ____�_� � =� _ _______��__ �_____._� ____�..______ _�_��._�� _____ �. � ; � � ��� � � __.�__-- �.__�_�._�________________�._ .___ __ _ .__�__�_ . ____� _--_____ __ __�_ ____ _ -� �°������ � ��� � :fiuipe�� nr��� � � ���� ��� ���� � .�u�pea� P'E� - � � # ���I� R�I+� -��� � �'� � '�� ""7^�r-%Jk� � ~��f!"!i#X9 i.�ii4/�#.�/�� '"�'lt XW WL���� ' . ���LI*+7��iTf! ��. . . "�'��'!� �' - ��M � A�i ���� ���11�'�+'1�+1 =�i � Zl��lB�� :ayet� �-Zi-lik9 =� �i �P�� #��� • �d�� ���+�� �s�nt�� �. Hiatt, Wendy From: Hara, Sandra Sent: Friday, May 18, 2012 2:04 PM To: Hiatt, Wendy Subject: AMr appt I added an AMR install appointment for next Thursday 5/24 at 9am for Alina Gonzalez at 6380 Madison St NE. Her phone # 612-702-6975. It's on the calendar. Sandi Hara ' � r City of Fridfey Water Department 6431 University Avenue NE Fridley,MN 55432 (763J 572-3566 {/we hereby authorize the City of Fridiey and/or its employees ta do what is necessary to replace the water meter. I understand that the property owner is liable far the water line from the main to the p�emise and all interior plumbing. (Per City code 402.06) I aiso ho{d tfie City of�ridley and/its emptoyees harm{ess for any damages that may occur while daing this operation. 7his to include,but not limited to;valves,piping,walls,floars or the curb stop bax and service(ine. !understand!am also required to obtain a permit prior to any work,if necessary. Finai meter reading(old meter) �Q Name: pddress: �LlVI__J ti�� Phone Number� _D � ` ` . Sigs►ature: . Witness Signature: fRIDLEY CITY CODE CHAPTER 402.WATER,STQRM WATER,AND 5ANITARY SEWER ADMINISTRATION (Ref Ord No 113,454,565,565,629,538,652,922,988,1144,1156,1191) 402.05. PERMIT FEE Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house or buifding for which the application is made,the owner or contractor shali be required to obtain a permit for such connection,and shail pay a permit fee as provided in Chapter 11 of this Code. After such connection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an inspection has heen made and such connection and the wark incident thereto has been approved by the City as a praper and suitable connection. 4U2.06. REPAIRS AND MAINTENANCE TO CONNECTION After the initiat connectionhas been made to the water service curb stop box or the sewer iead at the property line or a water service or sewer lead has been e�ctended to the property line for connection,the applicant,owner, or the occupant or user of such premises shail be liable for all repairs required to any water line and sewer lines necessary for cannection of the premises from the main to the premises. If the property awner requests maintenance service or repairs be performed by the City,the property owner sha11 be charged for the costs of the maintenance and/or repairs, including any necessary street repairs,at a rate set annualiy by an administrative policy. It shail be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the water service curb stop box for operabifity and at such height as will ensure that it remains above the finished grade of the land or property. (Ref 638,1156,1191)