Meter Swap � , �S��s'—���s�
� d�-'�r INSTALLATION
��.N� AUTOMATIC METER READER
FRIDLEY
Address �-��� '`" �T``-`�(
Name ���� ��
Date ��,/��-��3�`� �
Oid Meter Number �c��.
Old Meter Reading t� �lQ
RepiacementNo. `7����.�`����
Replacemsnt Reading �
Replacement Make ��
ERT# �`}.X1����J
Replacement ERT#
Remarks
Sb� Signed: �
• � Requesf fvr Sa�r� R�port
City af Fndle}�
���a: s�t-1i-� a��: �0.�2��0»
F�c� T�e� r►u�al� AMR�wec�x Ern�d By: w�r F��t
[�partmev�t: W�� �izen N�me: Dauiti Lu
Addreas_ 59MQ�4TN ST NE C�sack Phorie: 763�6��57�
"Sc�edul�d [3ate= l�t l 1�3D P'M ��� � Property tJwner:
Lc�c,ation Dexa�s; � L?etaits: k�stall 14MR
P#itm T�cen:
�� ������ ��
� �
E
E
E
�
�
E
�
�,� �.,�.� _ �,���1�� �
��� �
i �� ,� �q�� �+���
; ��c� R�� C: �-
���7c,=n �.� — �1�5��5��
��� �Z�=p�pt{3�� �
; � �- — ������ l�
Respc�ns�af�e Perscan: .
�__ _ _
f4{�prouer: ,
�I�ican Da�e: _ �� _ �] 1�izen Nat#ieci
� C -��-11
.
City of Fridley
Water Deparkment
6431 University Avenue NE
Fridley MN 55432
(763) 572-3561
Uwe hereby authorize the City of Fridley and/or its
employees to do what is necessary to replace the water meter. I understand that the
property owner is liable for the water line from the mai.n to the premise and a11 interior
plumbing. (Per City code 402.06) I also hold the City of Fridley and/or its employees
harmless for any damages that may occur while doing this operation. This to include,but
not limited to;valves, piping, wa11s, floors or the curb stop box and service line. I
understand I am also required to obtain a permit prior to any work, if necessary.
Name: �r,��;,,�n�,� Address: .�`�°� 1f'fl�. S fr��-t_ �Yti����; �N i��`�2
Phone Number: ?�;—��c�-y,57 H Date: I��:�/-1���
Signature: �
Witness Signature: �..._
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINLSTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988, 1144, 1156, 1191)
402.05. PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the e�sting municipal system and any
house or building for which the applicarion is made,the owner or contractor shall be required to obtain a
permit for such connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such
cannection has been made,the Water and Sewer Department shall be notified. It shall be unlawful to cover
any connecting line until an inspecrion has been made and such connecrion and the work incident thereto
has been approved by the City as a proper and suitable connection.
402.06. REPAIItS AND MAINTENANCE TO CONNECTION
After the initial connecrion has been made to the water service curb stop box or the sewer lead at the
property line or a water service ar sewer lead has been eactended to the property line for connection,the
applicant,owner,or the occupant or user of such premises shall be liable for all repairs required to any
water line and any sewer lines necessary for connection of the premises from the main to the premises. If
the property owner requests maintenance services or repairs be performed by the City,the property owner
shall be charged for the costs of the maintenance and/or repairs,including any necessary street repairs,at a
rate set annually by an administrarive policy. It sha11 be the responsibility of the applicant,owner,occupant
or user to perform standard maintenance of the sewer service line from the premises to the main including
debris clearing ar root cutting and to maintain the water service curb stop box for operability and at such
height as will ens�e that it remains above the finished grade ofthe land or property. (Ref 638, 1156, 1191)