Meter Swap '= J� �-j�- ����'�-�--Yt�(��
INSTALLATION
cmroF AUTOMATIC METER READER
FRIDLEY
Address �{T�� � 1��� ��
Name �, ����c��.tr�.�1���
Date ��- �- ��
�
Old Meter Number �
Old Meter Reading �d
Replacement No. ����J�
Replacement Reading �
Replacement Make�
ERT# �3�� (7���
Replacement ERT#
Remarks:
�� Signed:
�.. , �2�t�t f�r�er�ric�: F�+�rt
�ify c�f �ri�idl�y
�: s��t-�� y t��: �t���2
T�e� ,�R�eeee� ���. �Y��c
. Wat� .
� fs1�11 �6Ti#�;T� . �i12,414-29Q8
fl�e: 3�Z1�#t�l�7�l�i�,(i(/� t3v�ier:
��: ��: �
T .
�!d �'let�r� � �, ��
��� ������: o y o I �o
���� ����� �35°�a3��
�
��+�w R�adin�. �
�
�
���T� 3�3� 0� 5�
�
�
�
�
�
,
�
�
�
� _ _ ���_� _�____ ____ _��.___
���: ;
3 __ �__.__���. � ��� ����������..�__ ��.�.�__ _��.___.._��_�.___
� �
— �
� . ��__�_�__ _ _e _ _e__ _______ __�_____ __ __�
�`��� i�. ._,___
�i
�
Hiatt, Wendy
From: Hara, Sandra
Sent: Monday, March 19, 2012 8:20 AM
To: Hiatt, Wendy
Subject: AMR appt
Hi
I scheduled an AMR install for Thursday morning at 7:30am for Nick Clements at 6171
6th St NE. His phone# is 612-414-2928.
It's on the calendar.
Thanks
Sandi
�
f , ,
City of Fridley
Water Department
6431 University Avenue NE
Fridley,MN 55432
(763)572-3566
1/we hereby authorize the Ciiy of Fridley andior its
emplayees to do what is necessary to repface the water meter. f understand that the property owner
is liabfe for the water line from the main to the premise and all interior plumbing. (Per City code
402.06j 1 also hold the City of Fridley and/its employees harmless for any darnages that may accur
whi{e doing this operation. This to inciude,but not fimited to;valves,piping,wafls,fioors or the curb
� stop box and service line. I understand I am also required to obtain a permit prior to any work,if
necessary.
Final meter reading�old meter) � 1� � C��
Name: Address• ��� 1 ' �EJ�S! _
Phone Number: Date: �"��—��
/ �r /'
Signature: i��2!"l /
Witness Signature:
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
ADM1NiSTRATION
{Ref Ord No 113,464,565,566,629, 638, 662,922,988,1144, 1156, 1191)
402.�5. PERMlT FEE
Prior to constructing or repalr of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shait be requi�ed ta obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shafl be notified. it shall be unlawfuf to cover any connetting line untii an
inspection has bee�made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06. REPAIRS AND MAINTENANCE T4 CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been exte�ded to the property line fo�connection,the applicant,owner,
or the occupant or user of such premises shati be liabie for all repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shal!be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsibility of the appiicant,owner,occupant or user to perform standard maintenance of
the sewer service line from the premises to the main including debris c{earing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the fand or property. tRef 638,1156, 1191)