Meter Swap j��?s-�t�r�-�'
�� �'��INSTALLATION
unroF AUTOMATIC METER READER
FRIDLEY
Address �� L� "�� ""i"�(
Name�LC(,���3,�% ��U�"�'�
Date ����' ��
�
Old Meter Number � -4 1 �
, Old Meter Reading
Replacement No. ��J�ol��
Replacement Reading Qf
Replacement Make � ��._ '
ERT#�����,�3� -
Replacement ERT#
Remarks
�Uv(g Signed:
L ? ���t fc�r�rr� R�r�
�i�y af F �
r�; �ot-�2-�� t�a��: �2
�T�� n��� �:
� . w�� .
�_ �9n sr�sT r� . �-�a-��o
�. �ao�,a�2,�aor�w �(ZI p�{ . �
��: �� ���� ��
���_
�
��� ��� �
�,►�� y359a5�
� �
��� 33�oag3�
�
� � � �
� ;
� �
� �
� �__ _ �_ __ _� ��____ _� �_ _.__ :_ _.�.
�: � �
;
@ ___����` . ___
,
Benson, Jeannie
From: Hara, Sandra
Sent: Friday, March 09, 2012 9:09 AM
To: Benson, Jeannie
Subject: AMR install appointment
Hi,
I scheduled an appointmen hon Friday March 23 at 10am for an AMR install for
Michelle Lecuyer at 6190 6 St NE. Her phone# �o ko de3fo39he guys that would be
It's on the calendar already so if you could do a w
great. Thanks
. .
City of Fridley
Water Department
6431 University Avenue NE
Fridiey,MN 55432
(763)572-3566
I/we hereby authorize the City of Fridley and/or its
employees to do what is necessary to repiace the water meter. I understand that the property owner
is liabie for the water line from the main to the premise and all interior plumbing. (Per City code
402.06) 1 also hold the City of Fridley and/its empioyees harmless for any damages that may occur
while doing this operation. This to intiude,6ut not limited to;valves,piping,walis,floors or the curb
� stop box and service line. 1 understand I am also required to obtain a permit prior to any work,if
necessary.
Finai meter readin old meter � �
BI �
Name• Address: 1V�-1��`l`��� �7 --
Phone Number: Date: � �✓-�
Signature:
Witness Signature: ,�
FRIDLEY CITY CODE
CHAPTER 4Q2.WATER,STORM WATER,AND SAPIITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988, 1144,1156,1191) -
402.05. PERMIT FEE .
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any'house
or building for which the application is made,the owner or contractor shail be required to obtain,a it f�r such
connection,and shali pay a permit fee as provided in Chapter 11 of this Code. After such conn' ;; has been
made,the Water and Sewer Department shall be notified. it shall be unlawful to cover any connecting line untii an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06. REPAIRS AND MAINTENANCE TO CONNECTION . ,
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,.
or the occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, including any necessary street repairs,at a rate set ar�nually by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perForm standard maintenance of
- the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)
r•;