Meter Swap y�•� �� . n-� �
'� � �r;� 1^�-u- �(�h, )v
� iO` " INSTALLATION
�.n� AUTOMATIC METER READER
FRIDLEY
Address �-1�c)(�j � c��
Name_�"�6�t��RG�1('��
Date �c7"'�`- I �
Old Meter Number G �1 t"�d�
Old Meter Reading � �.�
Replacement Na � �
Replacement Reading �
� Replacement Make � ��Q�r��� � �
t
E RT# ���� �,IQ�� �
Replacement ERT#
Remarks:
Signed: .,r
����'
.� , R�qu�t fc�,�rv� R
, � � �iiy of Ftidley
� �: s�t-� �: ��r��2
Reqe�T�e� ' 'J�IF�� Ey�
£�r�� YVa� t��: ,k�s Tsesl�ar
Add�� �Z Ia1B1.E ST t� #�ao�e: �l-��3-�734
Sc�ir�d[l�ite: fsf'1lZfl72 9iiD 11�i --��' �t9w�:
�
Lo�n - Requef t�a�s: +lll�
�
Ac�ian Ta��
�Id ��;�C# ( �'7�� ��
C�Id re�a�din�, -��C�L.� ��
N+�r �e#�r# �•/�`� ����
�J��rr �eadir�g: �S
E�T# �������
�
_.___.__..__ _.__ _____ __ _
� _ � ,,�_
�___.. �...._._..____ �..�._ _u_ ___._.---_________
�
: �.__ .______._. � __ � _______._____.�_... _____..__._______._
�_ ____ __..____ ��
�� � ` C�
, me R�_��.��__e..�__ ___�
- City of Fridley
Water Department
5431 University Avenue NE
Fridley,MN 55432
(7fi3)572-3566
I/we hereby authorize the City af Fridley and/or its
employees to do what is necessary to replace the water meter. I understand that the property owner
is liable for the water line firom the main to the premise and aN interior plumbing. (Per City code
402.06) t also hold the City of Fridtey and/its ert�ployees harmiess for any damages that may occur
while doing this operation. This to include,but not limited to;valves,piping,walis,floors or the curb
� stap bax and service 11ne. i understand I am also required to obtain a permit prior ta any work,if
necessary.
Final meter reading(old meter) � � � -
Name: Address:_� s/� �`�`-'
� 1
Phane Number: Dat � •
Signature:
. Witness Sign re: .
, "t`� � � FRIDLEY CITY CODE
� � CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
� ADMINISTRAT{UN
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144, 1156, 1191)
402.05. PERMIT FEE
Prior ta constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor sha11 be required to obtain a permitfor such
connectIon,a�d shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
� made,the Water and Sewer Qepartment shall be notified. It shali be unlawful to cover any connecting line until an
inspection has 6een made and such connection and the work incider+t thereto has been approved by the City as a
proper and suitable connection.
40t.06. REPAIR5 AND MAfNTENANCE TO CONNECTtON
<,�`..
After the initial connection has been made to the water service curb stop box or the sewer lead af the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall 6e liable for all repairs required to any wate�line and sewer lines
necessary far connection of the premises from the main to the premises. If the prope�ty awner requests
maintenance ser�ice or repaics be performed by the City,the property owner shall be charged for the costs of the
mainte�ance and/or repairs, including any necessary street repairs,at a rate set annually by an administrative
po(icy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard rr►aintenance of
the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)
j`� .
:�_
Hiatt, Wendy
From: Hara, Sandra
Sent: Thursday, May 31, 2012 11:06 AM
To: Hiatt, Wendy
Subject: AMR appt
1 scheduled an appt for tomorrow, Friday 6/1/12 at 9am for John Trentor at 6452 Abie
St NE. His ceil # is 571-243-6734. It's on the calendar.
Sandi