Meter Swap '_ ��. .��s rc�ci ,�c:j,�-t�
� � � � 1 STQtLATION
u.�� AUTOMATIC METER READER
FRIDLEY
Address �C��` ���b��
Name��� �`�� ������'`---
Date � �"
Old Meter Number , � �� �
Old Meter Read'mg
Repiacement No. � 8
Replacement Reading �
Replacement Make ��'����-,
ERT# ��� �kJ���
Replacement ERT#
Remarks:
�3�� Signed:
'� ,;��-.�,�;', ��"?��-`��i`�%�'-'�-',
� `` INSTALLATION
G.��. AUTOMATIC METER READER
FRIDLEY
Address �J'Y�-)� UN����
Name ;� �fZ L ���C'�
Date I�Y�����
Old Meter Number
v � ��
Old Meter Reading V� '-1.
Replacement Na ���1� l���
Replacement Reading �
Replacement Make �t ''
ERT# � �
Replacement ERT#
Remarks
'���� Signed:
;� -
. R��# ftar�r� R+�rrt
� �i#yr a►f Fr�d�y
�ka; �Di-�2' . �lf�i12
Tjt�e� �� ��
. VII�� {�iz��� ��
1�Yd�ss� 5�1 TAYL�ST 1� . �74-�tA6
,�
[l��e= 12��MMt _
t��: fie�[�ta�s: Ai��
Ac�n�a�: -
:
+i�ld �e�f # �� � �'��
+C�I�d r+�dir��: �,��j$l--(�
�J+�v�r �let�r�# ��p ��d�
Ne�r �+ea�dir�g. �
E�T# �j�J��� `��
�
,
� __ � .�._�._�.._______� _._ _._�_ _�__ �_.__..__._____ � ______
���� �
��...___ .� ___ _.__ __��.._�_�.�..__ ... _.__.._�___.
� �
;
�_ ._.____._.... ..� �_.__._.___.__ _--
_ . , �
� _ �_ ��-��-� ---� �
_ --
,�:,.
' City of Fridley
Water Department
6431 UniversityAvenue NE
Fridley,MN 55432
(763)572-3565
I/we hereby authorize the City of Fridley and/or its
employees to do what is necessary ta replace the water meter. I understand that the property owner
is liable for the water line from the main to the premise and all interior plumbing. (Per City code
402.06) 1 also hold the City of Fridley and/its employees harmless for any damages that may occur
white doing this operation, This to include,but not(imited to;valves,piping,walls,floors or the curb
stop box and service line. I understand I am also required to obtain a permit prior to any work,if
necessary. ��
Final meter reading(old meter� � �� .
Name: Address ��1 ���� —
Phane Numbe • Date: ��%'_�--� �
�Signature:
. Witness Signature:
FRIDLEY CtTY GOaE
CHAPTER 402.WATER,STORM WATER,AND SANiTARY SEWER
ADMINISTRATIQN
(Ref Ord Na 113,464,565,566,629,fi38,662,922,488,1144,1156,1191}
402.05. PERMIT FEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the appiication is made,the owner or contractor shall 6e required to obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shall be notified. It shall be unlawful to cover any connecting line until an
inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
4U2.06. REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box oc the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be liable for a11 repairs required to any water line and sewer fines
necessary for connection of the premises from the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shall 6e charged for the costs of the
maintenance and/ar repairs, including any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsi6ility of the applicant,ow�er,octupant or user to perform standard maintenance of
the sewer service line from the premises to the main including debris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as witl ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)