Meter Swap '�r ��a� � �- 3.s-vs-�.����v�
� INST/ILLATION
G.N� AUTOMATIC METER READER
FRIDLEY
Address ���� �������QI.�
Name ��.P'l,D �N����I.�
Date ��'��'—��
Old Meter Number a��;�l
Old Meter Reading �
Replacement No. � �,
Replacement Reading
Replacement Make
ERT# �����Q��
Replacement ERT#
Remarks � /1.�T
�U., Signed:
��t�t fnr�er�c� F�
�i�yr ofi �ri�il�
� �: s��-�2-� �c�: ��,rz�r�o��
T�e� ��- �r� F�t
�er�t. W�er fi��� �d Ar�art
J#dd�= 63�1 11�1l�H ST� _ �1-2�5
�hedEir�d[I,�e= 11IZ7lZA721�0' ��� R�apeRjr�:
��� �
. Request tl�ta�s= �11i�i 6t�or ZD72
Ac�im Ta��
,�I�i �let�r#� ' ',c��`7���
�id re�din+g� ��,� �,��
�
New �e�r# �'�(o ti`��v�
�1ev�r �eading: �
E�'� �j� a� 1 ��S
� ,
�._____._ __________.___,_ ______�___ _
���� �v___ ._
�
� �
� �__________._____. _.___ _.___ _._
- 'c�
�._m_.L_l.�_�-�.`�____._
f i-liatt, Wendy
From: Hara, Sandra
Sent: Tuesday, November 20, 2012 4:22 PM
To: Hiatt, Wendy
Subject: AMR install for ROE penalty list
I got a call from Ronald Anderson at 6331 Washington St about the ROE penalty charge so he scheduled an appointment
for the AMR install on Tuesday 11/27/12 at 1pm. His phone#is 763-571-2975.
I can't get access to the calendar for some reason this week! So it's not added to that yet. I may not have time to find
the calendar again until next week some time.
Sandi Hara
City of Fridley
Utility Billing
763-572-3529
1
- City of Fridley
Water Department
6431 University Avenue hiE
, Fridley,MN 55432
(763)572-3566
��We hereby authorize the City of Fridley and/or its
employees to do what is necessary to replace the water meter. 1 understand that the property owner
is liable for the water line from the main to the p�emise and alt interior plumbing. (Per City code
�02.06} I also hold the City of Fridley and/its empioyees harmless for any damages that may occur
while doing this operation. This to include,but not limited to;vatves,piping,walls,floars or the curb
stop box and service line. i understand I am alsa required to obtain a permit prior to any work,if
necessary.
�
Final meter reading(otd meter)
Name:
Addresr._�•/ �/� �
Phone Number• Date• � `�� � '� -
Signature:�"
Witness Signature:
FRIDLEY CITY CODE
CHAPTER 402.WATER,STORM WATER,AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638r 662,922,988, 1144, 1156,1191)
402.05.PERMIT EEE
Prior to constructing or repair of any water or sewer line connecting the existing municipal system and any house
or building for which the application is made,the owner or contractor shall be required to obtain a permit for such
connection,and shall pay a permit fee as provided in Chapter 11 of this Code. After such connection has been
made,the Water and Sewer Department shaU be notified. it shaft be unlawfu!to cover any connectingline until an
inspection has been made and such connection and the wo�k incident thereto has been approved by the City as a
propec and suitabte connection.
402.06.REPAIRS AND MAINTENAMCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property
line or a water service or sewer lead has been extended to the property line for connection,the applicant,owner,
or the occupant or user of such premises shall be liable for all repairs required to any water line and sewer lines
necessary for connection of the premises frorn the main to the premises. If the property owner requests
maintenance service or repairs be performed by the City,the property owner shall be charged for the costs of the
maintenance and/or repairs, incfuding any necessary street repairs,at a rate set annually by an administrative
policy. It shall be the responsibility of the applicant,owner,occupant or user to perform standard maintenance of
• the sewer service fine from the premises to the main including dehris clearing or root cutting and to maintain the
water service curb stop box for operability and at such height as wili ensure that it remains above the finished
grade of the land or propecty. (Ref 638,1156,1191)