Meter Swap � �
�
_
Ciry a,{
F�a��y
Request Number: 17833
Pub�ic Works I�v�ion
Servlce Requeat
Problem Address: 6061 2nd St Reqneated By: Brad
Dep�rtment: WATER Addreas: No address provided
Problem/Issne: INSTALL AMR METER Pho�Nnmber: 651-329-6107
� Sc6eduledDstes r. 2018-03-OS Schedoled'Ifine: 02:00:00
�-c
AC7ION NEEDED:AMR
r
Crented by: Wendy Hiatt Date Created: 2018-03-02
ACTION TAI�N:
�,r�.9 �C ����- ���(�t.,�
Status: In Progressy Sebmitter Has Been r
Contacted
Date Completed: Completed by:
� � ���
3 5 ��3 e
.
' City of Fridley �v �1��
Water Department
6431 University Avenue NE �
Fridley,MN 55432 I� , f��s�'v
763-572-3566
1/we hereby authorize the City of Fridley and/or its empioyees to do what is necessary to
replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all interior
plumbing. (Per City code 402.06) i also hold the City of Fridley and/its employees harmless for any damages that may occur while doing this
operation. This to include,but not limited to vaives,piping,walls,floors or the curb stop box and service line. In understand 1 am also required
to obtain a permit prior to any work,if necessary.
FINAL METER READING(old meter)__ { / �-N� � f v
Name• �1 r11.� Address �VV '�/ ' C'n�-% ��
Phone Number "'�` � ✓ ^' ✓ � �
�Sig��e , ' ess Signature �r
~ OLD METER# ��J � (/�v SIZE & STYLE Circle
OlQ READING__ ��� ! Z� � 5/8" HEX
NEW METER# i� ! � 1 l I � � 1" HEX
NEW READING v I'r4" ELIPTICAL or HEX
ERT# _ � � - / 1 � ` � � 2" ELIPTICAL or HEX
FRIDLEY CITIf CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRATION
(Ref Ord No 113,464,565,566,629,638,662,922,988,1144,1156,1191)
402.5 PERMIT FEE
Prior to constructing or repair of any water of sewer line connecting the existin�municipal system and any house or building for which the
application is made,the owner or contractor shall be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connection has been made,the Water and Sewer Departmerrt shall be notified. It shall be unlawful to cover
any connecting line until an inspection has been made and such connection and the work incident thereto has been approved by the City as a
proper and suitable connection.
402.06 REPAIRS AND MAINTENANCE TO CONNECTION
After the initial connection has been made to the water service curb stop box or the sewer lead at the property line or a water service lead has
been extended to the property line for connedion,the applicant,owner,or occupant or user of such premises shall be liable for all repairs
required to any water line and sewer lines necessary for connection of the premises from the main to the premises. lf the property owner
requests mairrtenance service or repairs be performed by the City,the property owner shall be charged for the costs of the mairrtenance a�d/or
repairs,including necessary street repairs at a rate set annually 6y an administrative policy. it shalt be the responsibility of the applicant,
owner,occupant or user to perform standard maintenance of the sewer service line from the premises to the main including debris clearing or
root cutting and to maintain the water service curb stop box for operability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)