Meter Swap . • � �
�
,.;, ���Q�,
Fridley
Request Number: 17836
. Public works I)Ivision
Service Recp�est
Problem Address: 6019 Main St Reqneated By: Yonas
DepartmeM: WA1ER Addresa: No address}�ovided
�Problem/Issue: iNSTALL AMR ME'IER Phone Numbcr: 6019 Main St
c'
Scheduled Date: 2018-03-06 Schedeled Tlmc: 08:00:00
J ��S (V�-/ �� M
ACIION NEEDED:AMR .�'� no C�.v�.S w�� - l.� o G�1R+v��rS q -'�o� ` '
�r: �.`
�r�v�- i� ���, arr�a `� €,:� :
,
��,, 6,r,�
Created by: Wex�y Hiatt Date Created: 2018-03-02 ;,
ACIION TAKEN: `
._._�._�___ _.�_vi.-s�-�.�l�e� �;-�. �--
_...______.__ _ ....___.._.__ _...___ ��_�:�
��.���
a�
__._____._._._____.....__.___._ _. ........._..................______..__ _.........._._ _ �;;��
�
Status: In Progress Snba�tter Haa Been r.
Cont�ted
Ds�te Completed: Completed by: '
��
�—�— �g �
�
- A 5� � � �-s�
City of Fridley
Water Department
6431 University Avenue NE 1��(�c_.`��� r,r�
Fridley,MN 55432 � �J W
763-572-3566
1/we hereby authorize the C'rty of Fridley andJor its employees to do what is necessary to
replace the water meter. I understand that the property owner is liable for the water line from the main to the premise and all interior
piumbing. (Per City code 402.06) 1 alw hold the City of Fridley and f its employees harmless for any damages that may oaur while do+ng this
operation. This to include,but not limited to valves,piping,walis,floors or the curb stop box and service line. In understand 1 am also required
to obtain a permit prior to any work,if necessary.
�
FINAL METER READING old meter ��� " �� O
� )
�1�� I �
Name• d v`�/1-�7 Address V �"VCI.I Gl. ��r
Phone Number �- Date �" `� � f V
..�,
x5ignature Witness Signature
_�
OLD METER# ��� t�o 6 � SiZE & STYLE(Circle)
OLD READING �() � 6 �a� S�° v 5� HEX
NEW METER# � 1� q T I. I� � 1" EX
�� ��
NEW READING v 1�4n T ELIPTICAL or HEX
L,� (� �_"�' �;,
ERT# ��� I �� (a 2" E�I�CAL or HEX
,. � � _.
FRIDLEY CI�'Y CODE
CHAPTER 402.WATER,STORM WATER AND SANITARY SEWER
ADMINISTRA710N
(Ref Ord No 113,464,555,566,629,638,662,922,988,1144,1156,1191)
402.5 PERMfT FEE
Prior to constructing or repair of any water of sewer line conneding the existing municipal system and any house or building for wh(ch the
application is made,the owner or contractor sfiall be required to obtain a permit for such connection,and shall pay a permit fee as provided in
Chapter 11 of this Code. After such connedion has been made,the Water a partment shall be not�ed. it shall be unlawful to cover
any connecting line until an inspection has been made and suc inciderrt tfiereto has been approved by the C'rty as a
proper and suitable co�nection. � �" "`� �,� ' "
��� '=�� t�f, �
�: S F`
C;:n �'�5A r�+`��
402.06 REPAIRS AND MAINTENANCE TO CONNE « � � �: �`
After the initial connedion has been made to the w � '�'i ������u -� �� '�',,lead at the property line os a water senrice{ead has
been extended to the property line for connection,t���.�s�-�� ;� ��'"'w r.�-' ��tr of such premises shall be liable for all repairs
required to any water line and sewer lines necessary Y�+ � °� , .-�.� -°�e main to the premises. if the property owner
requests maintenance service or repairs be performec� �1e charged for the costs of the maintenance and/or
repairs,intluding necessary street repairs at a rate set� , , f���,: rt shail be the responsibility of the appiicant,
ownQr,occupant or user to perform standard maintena ;��j�'"��nne from the premises to the main including debris clearing or
root cutti�g and to maintain the water service curb stop '� ability and at such height as will ensure that it remains above the finished
grade of the land or property. (Ref 638,1156,1191)