PS01-01 GATEWAY EAST ADDITION CITY OF FRIDLEY
6431 UNIVERSITY AVENUE
FRIDLEY, MN 55432
(612) 571-3450
COMMUNITY DEVELOPMENT DEPARTMENT
SUBDIVISION APPLICATION FOR:
'x Plat Lot Split
PROPERTY INFORMATION: - site plan required for submittal, see attached
Address: 5807 & 5755 university, 353 & 339 57th Place, 348 57th Ave
Property Identification Number:
Legal Description: Lot Block Tract/Addition
_ See Attached
Current Zoning: Attached Square footage/acreage: Attached
Reason for Subdivision: Reauest for preliminary and final plat for
proposed 28 unit for sale townhome project.
Have you operated a business in a city which required a business license?
Yes No x If Yes, which city? N/A
If Yes, what type of business?
Was that license ever denied or revoked? Yes No x
FEE OWNER INFORMATION (as it appears on the property title)
(Contract Rutchasers: Fee owners rpust sign this form prior to processing)
NAME: -t"f_
ADDRESS:
DAYTIME PHONE: vZ-ES]�Z — SIGNATURE/DATE:
--------------
PETITIONER INFORMATION
NAME: Gateway East Redevelopment, LLC
ADDRESS:
DAYTIME PHONE: 651 -227-6925 SIGNATURE/DATE: 2 zkj
.b.V.V ArN/VVN.V NAV ti.VAr.�r.V/V�rV.V.VV V.Vti..V.V.V NVVNN.V.rVMHHNV.V/r.�r.V V.V /VArN .V .V/VrVV/vN.V..r.V
FEES
Plat: $500.00 for 20 Lots, $15.00 for each additional lot / C; Total Fee: vim•
Lot Split: $250.00 Receipt#: Received By:
(
Application Number: �5 " GI
Scheduled Planning dommission Date: k7 1. -7A- Q
Scheduled City Council Date:
10 Day Application Complete Notificati n Date: � i ana")n4. (J/
60 Day Date: Mph 5, 61
CityQf Fridley Land
Use
Application P
60 Day Agency Action Law
Application Date Planning Commission MeetingCity Council Decision
60 Day Window Starts Recommendation to Council Approval or Denial
21-40 Days i 50-60 Days
Approved, Action Taken Letter
Application Complete ,
10 Day Notice
Tabled, 60 More Days
Submit Complete Public Hearings:
Application and Variance Denied
Materials Vacations ;
Lot Splits Public Hearings:
Plats Rezonings
Rezonings Zoning Amendments
Zoning Amendments
Wetland Replacements
Comprehensive Plan
Special Use Permits
HKS 10315
12/27/00
Gateway East Townhomes
Existing Legal Description:
See Attached.
Current Zoning:
Lots 6, 7, 8, 9, Block 4, Bennett—Palmer Addition: Zoned C2
Street Address: 5807 University Ave. N.E.
Lots 1, 2, and 3, Block 3, City View Addition: Zoned C2
Street Address: 5755 University Ave. N.E.
Lots 4, 5, and 6, Block 3, City View Addition: Zoned R2
Street address: 339 57th Place N.E.
(Vacant)
Lots 7, 8, Block 3, City View Addition: Zoned R2
Street Address: 353 57th Place N.E.
Lots 5, 6, and 7, Block 6, City View Addition: Zoned R2
Street Address: 348 57th Ave. N.E.
Square Footage/acreage:
Until the east right-of-way line for State Highway 47 (University Avenue N.E.) is
delineated by Egan, Field Nowak, the exact size of the site cannot be determined. The
approximate size is 2.51 acres.
Arm
C"yF
FMDLEY
FRIDLEY MUNICIPAL CENTER •6431 UNIVERSITY AVE. N.E. FRIDLEY, MN 55432•(612)571-3450 •F.kX(612)571-1287
January 16, 2001
Gateway East Redevelopment, LLC
325 Cedar Street, Suite 400
St. Paul, MN 55101
Dear Sirs:
Per Minnesota Statute 15.99, local government units are required to notify land use
applicants within 10 working days if their land use applications are complete. We
officially received your applications for a preliminary plat, rezoning, & street vacation on
January 5, 2001. This letter serves to inform you that your applications are complete.
Your hearings and discussion on these items will take place at the City of Fridley
Planning Commission Meeting on February 7, 2001 at 7:30 P.M. in the City Council
Chambers at 6431 University Avenue. Final action on these requests will be taken by
the City of Fridley City Council at 7:30 P.M. on February 26, 2001.
If you have any questions regarding this letter or the process, please feel free to contact
me at 572-3593.
Sin erely,
Paul Bolin
Planner
PB
C-01-05
-Focus
City of Fridley
PUBLIC HEARING
BEFORE THE
PLANNING COMMISSION
Notice is hereby given that there will be
a public hearing of the Fridley Planning
Commission at the Fridley Municipal
Center, 6431 University Avenue N.E. on
February 7, 2001, at 7:30 p.m. for the
purpose of:
Consideration of a Preliminary Plat, PS
#01-01,by Gateway East Redevelopment,
LLC,for a preliminary plat for.a proposed
28 unit for sale townhome project, gener-
ally located at 5807 & 5755 University,
353 & 339 57th Place, and 348 57th
Avenue. The legal descriptions are as fol-
lows:
"A"
Lots 6, 7, and the south 15 feet, front
and rear of lot 8, block 4, Bennett-Palmer
Addition,Anoka County,Minnesota.
Lot 8, Block 4,except the south 15 feet,
front and rear thereof; and all of Lot 9,
Block 4, Bennett-Palmer Addition Anoka
County,Minnesota.
"B"
Lots 1 and 2, Block 3, City View,
Addition,Anoka County,Minnesota.
Lot 3, Block 3, City View Addition,
Anoka County,Minnesota.
"C"
Lots 4,5, and 6, Block 3, City View
Addition,Anoka County,Minnesota.
"D"
Lots 7 and 8, Block 3, City View
Addition,Anoka County,Minnesota.
"E"
Lots 5, 6, and 7, Block 6, City View
Addition,Anoka County,Minnesota.
Any and all persons desiring to be heard
shall be given an opportunity at the above
stated time and place. Any questions
related to this item may be referred to
Scott Hickok, Planning Coordinator at
763-572-3599.
Hearing impaired persons planning to
attend who need an interpreter or other
persons with disabilities who require auxil-
iary aids should contact Roberta Collins at-
763-572-3500 no later than February 1,
2001. The TDD number is 763-572-3534.
DIANE SAVAGE
CHAIR
PLANNING COMMISSION
(January 25, February 1, 2001)
Columbia Heights, Fridley, Hilltop Focus
News
PUBLIC HEARING
BEFORE THE
PLANNING COMMISSION
Notice is hereby given that there will be a public hearing of the
Fridley Planning Commission at the Fridley Municipal Center, 6431
University Avenue N.E. on February 7, 2001, at 7 :30 p.m. for the
purpose of :
Consideration of a Preliminary Plat, PS #01-01, by Gateway
East Redevelopment, LLC, for a preliminary plat for a proposed
28 unit for sale townhome project, generally located at 5807 &
5755 University, 353 & 339 57th Place, and 348 57th Avenue .
The legal descriptions are as follows :
"All
Lots 6, 7, and the south 15 feet, front and rear of lot 8,
block 4 , Bennett-Palmer Addition, Anoka County, Minnesota.
Lot 8 , Block 4 , except the south 15 feet, front and rear
thereof; and all of Lot 9, Block 4 , Bennett-Palmer Addition
Anoka County, Minnesota.
%%B„
Lots 1 and 2 , Block 3 , City View, Addition, Anoka County,
Minnesota.
Lot 3 , Block 3 , City View Addition, Anoka County, Minnesota.
"C„
Lots 4, 5 , and 6, Block 3 , City View Addition, Anoka County,
Minnesota.
\\D„
Lots 7 and 8, Block 3 , City View Addition, Anoka County,
Minnesota.
"E//
Lots 5, 6, and 7, Block 6, City View Addition, Anoka County,
Minnesota.
Any and all persons desiring to be heard shall be given an
opportunity at the above stated time and place . Any questions
related to this item may be referred to Scott Hickok, Planning
Coordinator at 763-572-3599 .
Hearing impaired persons planning to attend who need an interpreter
or other persons with disabilities who require auxiliary aids
should contact Roberta Collins at 763-572-3500 no later than
February 1, 2001 . The TDD number is 763-572-3534 .
DIANE SAVAGE
CHAIR
PLANNING COMMISSION
Publish: January 25, 2001
February 1, 2001
Il
CITY OF FRIDLEY
PUBLIC HEARING NOTICE
BEFORE THE PLANNING COMMISSION
TO: All property owners/residents within 350 feet of property
generally located at 5802 and 5755 University, 353 and 339
57' Place, and 348 57th Avenue.
CASE NUMBER: Rezoning, ZOA #01-01
APPLICANT. Gateway East Redevelopment, LLC
Petitioner or representative must attend the Planning Commission meeting.
PURPOSE: To rezone for a proposed 28 unit for sale townhome project.
LOCATION OF 5802 and 5755 University, 353 and 339 57th Place, and 348
PROPERTYAND 57`h Avenue
LEGAL
DESCRIPTION: Legal description is on file and available at the Fridley
Munici al Center.
DATE AND TIME OF Planning Commission Meeting:
HEARING: Wednesday, February 7, 2001, at 7:30 p.m.
The Planning Commission Meetings are televised live the night
of the meeting on Channel 17.
PLACE OF Fridley Municipal Center, City Council Chambers
HEARING: 6431 University Avenue N.E., Fridley, MN
HOW TO 1 . You may attend hearings and testify.
PARTICIPATE: 2. You may send a letter before the hearing to Scott Hickok,
Planning Coordinator, at 6431 University Avenue N.E.,
Fridley, MN 55432 or FAX at 763-571-1287.
SPECIAL Hearing impaired persons planning to attend who need an
ACCOMODATIONS: interpreter or other persons with disabilities who require
auxiliary aids should contact Roberta Collins at 763-572-3500
no later than February 1, 2001. The TDD # is 763-572-3534.
ANY QUESTIONS: Contact Scott Hickok, Planning Coordinator, at 763-572-3599
or Paul Bolin, Planner, at 763-572-3593.
Publish: January 25, 2001
February 1 , 2001
CITY OF FRIDLEY
PUBLIC HEARING NOTICE
BEFORE THE PLANNING COMMISSION
TO: All property owners/residents within 350 feet of property
generally located at 5802 and 5755 University, 353 and 339
57th Place, and 348 57th Avenue.
CASE NUMBER: Preliminary Plat, PS #01-01
APPLICANT: Gateway East Redevelopment, LLC
Petitioner or representative must attend the Planning Commission meeting.
PURPOSE: For a preliminary plat for a proposed 28 unit for sale townhome
project.
LOCATION OF 5802 and 5755 University, 353 and 339 57th Place, and 348
PROPERTYAND 57" Avenue
LEGAL
DESCRIPTION: Legal description is on file and available at the Fridley
Municipal Center.
DATE AND TIME OF Planning Commission Meeting:
HEARING: Wednesday, February 7, 2001, at 7:30 p.m.
The Planning Commission Meetings are televised live the night
of the meeting on Channel 17.
PLACE OF Fridley Municipal Center, City Council Chambers
HEARING: 6431 University Avenue N.E., Fridley, MN
HOW TO 1 . You may attend hearings and testify.
PARTICIPATE: 2. You may send a letter before the hearing to Scott Hickok,
Planning Coordinator, at 6431 University Avenue N.E.,
Fridley, MN 55432 or FAX at 763-571-1287.
SPECIAL Hearing impaired persons planning to attend who need an
ACCOMODATIONS: interpreter or other persons with disabilities who require
auxiliary aids should contact Roberta Collins at 763-572-3500
no later than February 1, 2001 . The TDD # is 763-572-3534.
ANY QUESTIONS: Contact Scott Hickok, Planning Coordinator, at 763-572-3599
or Paul Bolin, Planner, at 763-572-3593.
Publish: January 25, 2001
February 1 , 2001
� s
CITY OF FRIDLEY
PUBLIC HEARING NOTICE
BEFORE THE PLANNING COMMISSION
TO: All property owners/residents within 350 feet of property
generally located at 5802 and 5755 University, 353 and 339
57" Place, and 348 571h Avenue.
CASE NUMBER: Vacation, SAV #01-01
APPLICANT. Gateway East Redevelopment, LLC
Petitioner or representative must attend the Planning Commission meeting.
PURPOSE: For a street vacation for a proposed 28 unit for sale townhome
project.
LOCATION OF 5802 and 5755 University, 353 and 339 5711 Place, and 348
PROPERTYAND 571h Avenue.
LEGAL
DESCRIPTION: Legal description is on file and available at the Fridley
Munici al Center.
DATE AND TIME OF Planning Commission Meeting:
HEARING: Wednesday, February 7, 2001, at 7:30 p.m.
The Planning Commission Meetings are televised live the night
of the meeting on Channel 17.
PLACE OF Fridley Municipal Center, City Council Chambers
HEARING: 6431 University Avenue N.E., Fridley, MN
HOW TO 1. You may attend hearings and testify.
PARTICIPATE: 2. You may send a letter before the hearing to Scott Hickok,
Planning Coordinator, at 6431 University Avenue N.E.,
Fridley, MN 55432 or FAX at 763-571-1287.
SPECIAL Hearing impaired persons planning to attend who need an
ACCOMODATIONS: interpreter or other persons with disabilities who require
auxiliary aids should contact Roberta Collins at 763-572-3500
no later than February 1 , 2001. The TDD # is 763-572-3534.
ANY QUESTIONS: Contact Scott Hickok, Planning Coordinator, at 763-572-3599
or Paul Bolin, Planner, at 763-572-3593.
Publish: January 25, 2001
February 1 , 2001
1 � ,
LEGEND -
dot
a '
r \ %, \.
glyN
91 la la M
(O N E 4
Ink
.�.a1 �l
2- --- -- - 0
-4o ( �■
=7 y � I
-- ---,-
Z CD
LiO
00,
00
OD s
� D
- ':
-- —
S
-------- -- -
aac — --
: L[IFT-FFF]
C"
�: ----
y I G
- _ '"
CITY OF FRIDLEY
PUBLIC HEARING NOTICE
BEFORE THE PLANNING COMMISSION
TO: All property owners/residents within 350 feet of property
generally located at 5700 and 5900 Block of 3rd Street
CASE NUMBER: Preliminary Plat, PS #05-08
APPLICANT. Blue Print Homes, Inc.
Petitioner or representative must attend the Planning Commission meeting.
PURPOSE: To replat portions of Block 2, City View Addition and Blocks 12
and 28, Hyde Park Addition, to create 16 new single family lots
for the Gateway West Redevelopment project.
LOCATION OF 5700 and 5900 Block of 3r Street
PROPERTY AND
LEGAL • Lots 16-26, Block 12, Hyde Park Addition, Anoka
DESCRIPTION: County.
• East one-half of Lot 7, all of Lots 8-12, and the
West 25 feet of Lot 13, Block 2, City View
Addition.
• Lots 6-10, Block 28, Hyde Park.
• Lot 16, Block 21, Hyde Park Addition.
DATE AND TIME OF Planning Commission Meeting:
HEARING: Wednesday, November 2, 2005, at 7:30 p.m.
The Planning Commission Meetings are televised live the night
of the meeting on Channel 17.
PLACE OF Fridley Municipal Center, City Council Chambers
HEARING: 6431 University Avenue N.E., Fridley, MN
HOW TO 1. You may attend hearings and testify.
PARTICIPATE: 2. You may send a letter before the hearing to Stacy
Stromberg, Planner, at 6431 University Avenue N.E.,
Fridley, MN 55432 or FAX at 763-571-1287.
SPECIAL Hearing impaired persons planning to attend who need an
ACCOMODATIONS: Interpreter or other persons with disabilities who require
auxiliary aids should contact Roberta Collins at 763-572-3500
no later than October 27, 2005. The TDD # is 763-572-3534.
ANY QUESTIONS: Contact Stacy Stromberg, Planner, at 763-572-3595.
Publish: October 20, 2005
CITY OF FRIDLEY
PUBLIC HEARING NOTICE
BEFORE THE PLANNING COMMISSION
TO: All property owners/residents within 350 feet of property
generally located at 57th Place, 58th and 59th Avenue NE.
CASE NUMBER: Vacation, SAV #05-01
APPLICANT: Blue Print Homes, Inc.
Petitioner or representative must attend the Planning Commission meeting.
PURPOSE: To vacate portions of 57 Place NE, 58 th Avenue NE, and 59
Avenue NE, lying easterly of 3rd Street NE and terminating at
the University Avenue NE right-of-way, to accommodate the
replat for the Gateway West Redevelopment project.
LOCATION OF 57 Place, 58thand 59th Avenue NE
PROPERTY AND
LEGAL The legal descriptions are on file and available at Fridley
DESCRIPTION: Municipal Center.
DATE AND TIME OF Planning Commission Meeting:
HEARING: Wednesday, November 2, 2005, at 7:30 p.m.
The Planning Commission Meetings are televised live the night
of the meeting on Channel 17.
PLACE OF Fridley Municipal Center, City Council Chambers
HEARING: 6431 University Avenue N.E., Fridley, MN
HOW TO 1. You may attend hearings and testify.
PARTICIPATE: 2. You may send a letter before the hearing to Stacy
Stromberg, Planner, at 6431 University Avenue N.E.,
Fridley, MN 55432 or FAX at 763-571-1287.
SPECIAL Hearing impaired persons planning to attend who need an
ACCOMODATIONS: Interpreter or other persons with disabilities who require
auxiliary aids should contact Roberta Collins at 763-572-3500
no later than October 27, 2005. The TDD # is 763-572-3534.
ANY QUESTIONS: Contact Stacy Stromberg, Planner, at 763-572-3595.
Publish: October 20, 2005
M CITY OF COMMUNITY DEVELOPMENT DEPARTMENT
FRIDLEY PUBLIC HEARING NOTICE
5947 5974 5973
36 N 5935 5942 N 5945 5940
5968 5965
z —59-29F--
9295960
� �
932 0 __ 5924 _._ 5957
5923 N 5950
1.0
924 C/) ---- 04 --
1 5916 (D 5920 0) 5946 5949
cn
916 5917 5941
5908 5942
5909 _
910 5933
5901 15900 j 5901 5900 5905 5932
- 5925
592
59TH AVE 58 _ _ _
5881 5852 �' 51 5860 � � 5917
5859 z 5916
000 5875 5850 5849 5854 — 5909
c
U.) 5847 5849 rn 5908
5845 00
5846 M 5901
866 � 5846 L 5840 5839 5900
� 5841
(n -- 5
848 5834 5833 � 5872
5832 5831 ! 5871
5835 5828 5825 j 5826 5821 `00
r'
5860
830 5825 5820 5821 5824 > 5861
5861
5817 5824
�.—- ' 5807 � < 5850 5851
816 5815 ) ' 5810 5813_. 5810 m
5807 5805 M 5840 5841
800 5801 �I 5800 5801 5800 to i
w
_._ _. 5832 5831
58TH AVE
N 5791 5823 5820 5821
79900
__
790ch �t 278 2901 saz, 5812
N N - 5811
5783 5805
4 5803
5761 � O 5801 5800 5801
5775 y'l1 I L�. . __...
57 112 AVE _
57605748
N M _ vin in uteri uri v�'i 5746
('7 N LIQ ! �� II[— — _ M
N N N 5744ry
5724 5718 5742
5722' I 5716 5740
57TH PL 5720 5714
__--_... .--__-- --_-� ..........._ ...._.._.. .-. 5712
5710
SOURCES N
Fridley Engineering _
Fridley GIS
9 Preliminary Plat, PS #05 04 and Vacation SAV #05-01
Anoka County GIS Petitioner: Blue Print Homes w E
Map Date:October 21 st, 2005 S
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5942 4TH ST NE 5932 4TH ST NE 5980 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5978 4TH ST NE 5974 4TH ST NE 5968 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5960 4TH ST NE 5950 4TH ST NE 5946 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5905 UNIVERSITY AVE NE 6005 UNIVERSITY AVE NE 5925 UNIVERSITY AVE NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5945 UNIVERSITY AVE NE 6007 3RD ST NE 6011 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
6010 3RD ST NE 6000 3RD ST NE 251 60TH AVE NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5980 3RD ST NE 5974 3RD ST NE 5940 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5900 3RD ST NE 5901 2 1/2 ST NE 5945 2 1/2 ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5947 2 1/2 ST NE 5915 3RD ST NE 5915 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5923 3RD ST NE 5925 3RD ST NE 5931 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5955 3RD ST NE 5973 3RD ST NE 5981 3RD ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5955 2 1/2 ST NE 5920 3RD ST NE 5917 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
251 57TH PL NE 271 57TH PL NE 281 57TH PL NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5745 UNIVERSITY AVE NE 5745 UNIVERSITY AVE NE 255 57TH AVE NE
FRIDLEY,MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
262 57TH PL NE 289 57TH AVE NE 255 57TH PL NE
FRIDLEY, MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5805 3RD ST NE 5807 3RD ST NE 5839 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5849 3RD ST NE 5860 3RD ST NE 5846 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5840 3RD ST NE 5826 3RD ST NE 5824 3RD ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5824 3RD ST NE 5810 3RD ST NE 5800 3RD ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5801 2 1/2 ST NE 5807 2 1/2 ST NE 5813 2 1/2 ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5817 2 1/2 ST NE 5821 2 1/2 ST NE 5833 2 1/2 ST NE
FRIDLEY, MN 55432 FRIDLEY,MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5841 2 1/2 ST NE 5845 2 1/2 ST NE 5847 2 1/2 ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5849 2 1/2 ST NE 5851 2 1/2 ST NE 5770 2 1/2 ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5770 3RD ST NE 5791 2 1/2 ST NE 5745 UNIVERSITY AVE NE
FRIDLEY, MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5745 UNIVERSITY AVE NE 5745 UNIVERSITY AVE NE 5832 3RD ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
261 57TH PL NE 5760 3RD ST NE 5783 2 1/2 ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5775 2 1/2 ST NE 5854 3RD ST NE 247 57TH PL NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
278 58TH AVE NE 290 58TH AVE NE 5831 3RD ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5821 3RD ST NE 5859 3RD ST NE 5825 2 1/2 ST NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5840 4TH ST NE 5832 4TH ST NE 5831 UNIVERSITY AVE NE
FRIDLEY, MN 55432 FRIDLEY, MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5865 UNIVERSITY AVE NE 5926 4TH ST NE 5916 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5820 4TH ST NE 5812 4TH ST NE 5800 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY, MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5895 UNIVERSITY AVE NE 5701 UNIVERSITY AVE NE 5714 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT
CURRENT RESIDENT CURRENT RESIDENT
5714 4TH ST NE 5716 4TH ST NE 5718 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5720 4TH ST NE 5722 4TH ST NE 5724 4TH ST NE
FRIDLEY, MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5734 4TH ST NE 5736 4TH ST NE 5738 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY, MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5728 4TH ST NE 5730 4TH ST NE 5732 4TH ST NE
FRIDLEY,MN 55432 FRIDLEY, MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5805 UNIVERSITY AVE NE 5803 UNIVERSITY AVE NE 5801 UNIVERSITY AVE NE
FRIDLEY,MN 55432 FRIDLEY, MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5825 UNIVERSITY AVE NE 5823 UNIVERSITY AVE NE 5821 UNIVERSITY AVE NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT CURRENT RESIDENT CURRENT RESIDENT
5821 UNIVERSITY AVE NE 5667 UNIVERSITY AVE NE 5696 UNIVERSITY AVE NE
FRIDLEY,MN 55432 FRIDLEY,MN 55432 FRIDLEY,MN 55432
CURRENT RESIDENT
250 57TH AVE NE
FRIDLEY, MN 55432
11-16-00 construction cost.xls
Gateway East, Fridley, MN 11/16/00
HKS Project No. 10315
Estimated cost of site work. Estimated cost is based on the conceptual layout
Site Work - Development
Item Quantity Unit Unit Price Cost
Clear & Grub 2.50 ACRE $1,500.00 $3,750.00
Excavation 10,000.00 CU. YD. $8.00 $80,000.00
Class 5 Agg. Base 600.00 CU. YD. $15.00 $9,000.00
Curb & Gutter 2,200.00 LIN. FT. $7.25 $15,950.00
4" Sidewalk 3,600.00 SQ. FT. $4.00 $14,400.00
Bituminous Pavement 570.00 TON _ $30.00 $17,100.00
Storm Sewer Pipe 800.00 LIN. FT. $30.00 $24,000.00
Storm Sewer Structures 8.00 EA. $1,800.00 $14,400.00
6" Watermain 965.00 LIN. FT. $25.00 $24,125.00
Water Services 710.00 LIN. FT. $25.00 $17,750.00
Hydrants 6.00 EA. $2,200.00 $13,200.00
Fittings, Gate Valves, Curb Stops 1.00 LS $8,000.00 $8,000.00
Sanitary Sewer 885.00 LIN. FT. $30.00 $26,550.00
Sanitary Sewer Services 800.00 LIN. FT. $30.00 $24,000.00
Sanitary Sewer Manhole 6.00 EA. $2,500.00 $15,000.00
Lights, Conduit, Wiring 4.00 EA. $4,000.00 $16,000.00
Transformer 2.00 EA. $4,000.00 $8,000.00
Striping 2,500.00 LIN. FT. $0.40 $1,000.00
Traffic Control Signage 1.00 LS $4,000.00 _ $4,000.00
Subtotal $336,225.00
15% Contingency $50,433.75_
Total $386,658.75
11-16-00 construction cost.xls
Gateway East, Fridley, MN 11/16/00
HKS Project No. 10315
Ro dway/utility Reconstruction
Item Quantity Unit Unit Price Cost
Remove Bituminous Pavement 3,000.00 Sq. Yd. $4.00 $12,000.00
Subgrade Excavation 2,000.00 CU. YD. $6.00 $12,000.00
Class 5 Agg. Base 805.00 CU. YD. $15.00 $12,075.00
Curb & Gutter 1,500.00 LIN. FT. $7.25 $10,875.00
4" Sidewalk 4,300.00 SQ. FT. $4.00 $17,200.00
Bituminous Pavement 630.00 TON $30.00 $18,900.00
Adjust Storm Sewer Structure 4.00 EA. _ $600.00 $2,400.00
6" Watermain 0.00 LIN. FT. $25.00 $0.00
Water Services 0.00 LIN. FT. $25.00 $0.00
Hydrants 0.00 EA. $2,200.00 $0.00
Fittings, Gate Valves 0.00 LS $5,000.00 $0.00
Sanitary Sewer 375.00 LIN. FT. $30.00 $11,250.00
Sanitary Sewer Services 0.00 LIN. FT. $30.00 $0.00
Sanitary Sewer Manhole 4.00 EA. $2,500.00 $10,000.00
Lights, Conduit, Wiring 4.00 EA. $4,000.00 $16,000.00
Transformer 0.00 EA. $4,000.00 $0.00
Striping 1,500.00 LIN. FT. $0.40 $600.00
Traffic Control Signage 1.00 LS $0.00 $0.00
Subtotal $123,300.00
15% Contingency $18,495.00
Total $141,795.00
Total Construction.Cost $528,453.75
Landscape Costs / I-
PLANT Quantity Unit Unit Price Cost
Sod 4000 Sq. Yd. $3.00 $12,000.00
Shrubs 301 Ea. $30.00 $9,030.00
Overstory Trees 71 Ea. $250.00 $17,750.00
Evergreen Trees 44 Ea. $225.00 $9,900.00
Ornamental Trees 35 Ea. $175.00 $6,125.00
Ornamental Railing 695 Lin. Ft. $120.00 $83,400.00
Mulch 1 L.S. $6,000.00 $6,000.00
Irrigation 1 L.S. $15,000.00 $15,000.00
Edging, Fertilizer, Peat Moss 1 L.S. $5,000.00 $5,000.00
TOTAL $164,205.5-0-
15% Comtingency $24,630.75
Total $188,835.75
-�- I -41 76` '5v
1
f `
CIVIL ENGINEERING
LA.\-DSCAPE ARCHITECTURE
ENVIRONMENTAL SERVICES
URBAN PLANNING
GENERAL TRANSMITTAL
Date: November 30, 2000
To: Barbara Dacy
City of Fridley
6431 University Ave. NE
Fridley, MN 55432-4348 _
From: Brian Vitek/Don Shaffer
Re: Gateway East
HKS Project Number: 10315
Items:
Number of Items Description
two sets(2) Site Plan&Utility Plan
Purpose: As You Requested ❑ Please Review and Return
For Your Information ❑ Please Reply to Sender
❑ For Your Approval ❑ Other(See Remarks)
Remarks:
Any questions please call me at(651)603-6009.
Copy to: File
821 Raymond Avenue --Suite 100—St. Paul, Minnesota 55114
Tel: 651-659-9,732 -- Fax: 651-659-0891
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
ily.-S.-I I X%A HIM z ENVIRONMENTAL SERVICES
URBAN PLANNING
CONSTRUCTION SERVICES
MEMORANDUM
DATE: January 4,2001
SUBJECT: Gateway East Townhomes
Stormwater Design
TO: HKS Project No. 10315
FROM: Don Shaffer
Stormwater calculations were completed for the predeveloped and developed site with the stormwater
flows compared from the predeveloped site to the developed site.
Predeveloped Site:
The drainage areas are defined as below:
Areas 1, 2 and 3 all drain to the storm sewer system located in 57 '/2 Avenue NE and University Avenue
Service Road.
Area 4 drains to the storm sewer system located in the south west corner of the site.
Areas 5, 6, and 7 drain to the storm sewer system located in 4"' Street NE and 57'x'Avenue NE.
Drainage areas are shown on the attached drainage area map for the predeveloped conditions.
Developed Site
The drainage areas were defined in the same manner as the predeveloped site so that a comparison of the
rate of flow to the city's storm sewer system can be made. Drainage areas 5,6, and 7 were increased to
reflect the storm sewer system that is constructed for the developed site. The flow rates shown in the table
for the developed site shows the total flow rate to the existing CB 5.
Drainage areas are shown on the attached drainage area map for the developed conditions.
The following table shows the comparison of predeveloped flow rates to developed flow rates.
HKS ASSOCIATES INC
821 RAYMOND AVENUE SUITE 100
ST.PAUL,MN 55114
PHONE 651/659-9732 FAx 651/659-0891
E-Mail:info@hksassociates.com
January 4,2001
Gateway East Townhomes
Page 2
Drainage Area Flows to Predeveloped Developed Comments
Flow(cfs) Flow(cfs)
Area 1 University Service Road 1.56 0.98
Area 2 Existing CB 1 1.66 1.87 Slight increase in drainage
area due to new driveway
Area 3 Existing CB 2 2.95 1.48 Drainage are for developed
site is less due to more
storm water directed to the
south
Area 4 Existing CB 3 2.76 2.81
Area 5 Existing CB 4 0.39 0.72 Additional storm water
received from the
extension of 4`h Street NE
Area 5 Existing CB 5 0.68 5.42 Drainage area was
increased due to regrading.
Total for the 10.0 13.28 Increase in the storm water
entire site flows is due to an increase
of the impervious area for
the developed site.
)_nan3sr,:.arr aacerrecrceL
ENVIRONNIEN'i:AL 5ERVICFi,S
. 2:1>NSl'Iti:C'T'A#>iY SI'RV[!;(iS
PROJECT:Gateway East Townhomes Storm Frequency=10 Years DATE:01/04/01
CITY:Fridley Developed Site BY: DKS
PREPARED BY:HKS ASSOCIATES, INC. FILE: 10315 '
LOCATION AREA RUNOFF COEFFICIENT DESIGN HYD G.L. PROFILE NOTES
%H Q with- BUILD
INC. % INC. INC. SUM To CALC GRD out FULL GRND HEAD Above
From To AC. TOT. impv. C CA CA'S conc i Q L d %GRD. LINE head V UP LOW UPPER LOWER ELEV. SPACE PIPE
Flow to University
Area 1 Street 0.31 0.31 26% 0.77 0.24 0.24 10 4.2 0.98 Avenue Service Road
New CB 7 replaces
Area 2 CB 7 0.53 0.53 60% 0.85 0.45 0.45 10 4.2 1.87 17 12 11,0096 0.23% 3.86 4.9 841.45 0.00 840.45 840.35 845.85 4.40 4.40 existing CB 1
Area 3 Ex CB 2 0.41 0.41 63% 0.86 0.35 0.35 10 4.2 1.46 16 12 '044°+6 0.14% 2.56 3.3 841.58 0.00 840.58 840.51 845.66 4.08 4.08
Area 4 CB 6 0.8 0.8 58% 0.85 0.68 0.68 10 4.2 2.81 19 15 1.00% 0.16% 6.99 5.7 840.39 0.00 839.14 838.94 844.98 4.59 4.59
Area 5 Ex CB 4 0.19 0.19 84% 0.91 0.17 0.17 10 4.2 0.72 16 12 0.01% 0.03% 0.39 0.5 841.82 0.00 840,82 840.86 844.62 2.80 2.80
4 3 0.13 0.13 77% 0.79 0.10 0.10 10 5.9 0.61 28 12 1.00%I' 0.02% 3.86 4.9 844.44 844.16 843.44 843.16 849.05> 4.61 4.61
31 2 0.261 0.39 69% 0.73 0.19 0.29 10 5.9 1.73 47 >15 1.00% 0.06% 6.99 5.7 844.16 843.69 842.91 842.44 849`.03 4.87 4.87
2 Ex 1 0.05 0.44 60% 0.67 0.03 0.33 10 5.9 1.93 150 15 1.00% 0.08% 6.99 5.7 843.69 842.19 842.44 840.94 848:59 4.90 4.90
1 Ex 1 0.5 0.5 84% 0.84 0.42 0.42 101 5.91 2.47 109 12 1.00% 0.41% 3.86 4.9 843.28 842.19 842.28 841.19 847.52 4.24 4.24
Ex 1 Ex STM 0.3 1.24 47% 0.58 0.17 0.92 10 5.9 5.42 68 15 0.66% 0.66% ..68r 4.6 842.19 0.00 840.94 840.49 844.76' 2.57 2.57
PAGE 1 of 1
PROJECT:Gateway East Townhomes Storm Frequency= 10 Years DATE:01/04/01
CITY:Fridley Predeveloped Conditions BY: DKS
PREPARED BY:HKS ASSOCIATES, INC. FILE: 10315
LOCATION AREA RUNOFF COEFFICIENT DESIGN HYD G.L. PROFILE NOTES
%H Q with- BUILD
scal INC. % INC. INC. SUM To CALC'' GRD out FULL GRND HEAD Above
FIRM TO a AC. TOT. impv. C CA CA'S conc i Q L d %GRD LINE head V UP LOW UPPERLOWER ELEV, SPACE PIPE
Avenue Service
Areal Street 0.42 0.42 81% 0.89 0.38 0.38 10 4.2 1.56 Road
Area 2 CB 1 0.45 0.45 80% 0.89 0.40 0.40 10 4.2 1.66 16 12 1.25% 0.19% 4.31 5.5 841.55 0.00 840.55 840.35 845.27 3.72 3.72
Area 3 CB 2 1 1 20% 0.71 0.71 0.71 10 4.2 2.95 16 12 0.44% 0.58% 2.56 3.3 841.58 0.00 840.58 840.51 845.31 3.73 3.73
Area 4 CB 3 0.82 0.82 54% 0.81 0.67 0.67 10 4.2 2.76 55 15 0.60% 0.16% 5.42 4.4 841.25 0.00 840.00 839.69 845.60 4.35 4.35
Area 5 CB 4 0.1 0.1 100% 0.95 0.10 0.10 10 4.2 0.39' 16 12 0.01% 0.01% 0.39 0.51 841.82 0.00 840.82 840.86 844.62 2.80 2.80
Area 6 CB 5 0.2 0.2 50% 0.83 0.17 0.17 10 4.2 0.68 68 15 0.66%° 0.01% 5.68 4.6 842.19 0.00 840.94' 840.49 844.76 2.57 2.57
Flow to 57th Avenue
Area 7 Street 0.38 0.38 0°k 0.70 0.27 0.27 10 4.2 1.10 NE
PAGE 1 of 1
City of Fridley Land Use Application
SAV#01-01, ZOA#01-01, PS #01-01 February 7, 2001
GENERAL INFORMATION SPECIAL INFORMATION
Applicant: SUMMARY OF REQUEST
Gateway East Redevelopment,LLC Gateway East Redevelopment,LLC is seeking to
325 Cedar St., Suite 400 vacate portions of the University Service Road and
St. Paul, MN 55101 57`h Place; rezone property to S-2,Redevelopment
Requested Actions: District; and to replat the property,generally
• Vacate a portion of 57`h Place NE& a located at 57`h Avenue&University Avenue,in
portion of University Service Road. order to accommodate the development of 28
• Rezone property from R-2 & C-2 to S-2. townhome units.
• Replat property to accommodate 28 unit SUMMARY OF ANALYSIS
townhome development. Staff recommends approval of all three requests.
Existing Zoning:
Mix of R-2,Two Family Residential, and C-2, City Staff recommends approval of the street&
General business. utility vacation request.
Size of Property: • New street alignments are needed to make
117,425 square feet 2.89 acres this development function properly
Existing Land Use: • Neighborhood supports proposed street
Vacant. layout
Surrounding Land Use&Zoning:
N:Comm.&Res.,C-2&R-2
E:Residential,R-2 City Staff recommends approval of the
S: Comm.&Res.,C-2&R-3 rezoning of the property to S-2,Redevelopment
W:University Avenue,S-1 District.
Comprehensive Plan Conformance: • Rezoning of property is necessary to
Use of property is consistent with Plan. provide desired density on this site
Legal Description of Property:
See Attached existing description. City Staff recommends approval of the
Council Action: preliminary plat request.
February 26, 2001 • Proposed plat will combine the five
Public Utilities: properties in the project area into one
Available near site. property
Transportation:
Property will be accessed via the new
alignment of e St. & 57 '/Z Avenue.
Physical Characteristics:
Lot is relatively flat, currently vacant.
Staff Report Prepared by: Paul Bolin
69
Gateway East Redevelopment - SAV#01-01, ZOA#01-01, PS #01-01
The Request
Gateway East Redevelopment, LLC is seeking to vacate portions of the University Service
Road and 57th Place; rezone property to S-2, Redevelopment District; and to replat the
property, generally located at 57th Avenue & University Avenue, in order to accommodate
the development of 28 two bedroom townhome units.
The property referred to as "Gateway East" is comprised of properties formerly used as a
pawn shop, an automotive repair shop, a duplex, &two vacant lots. The "Gateway East"
property is outlined in the aerial photograph shown below.
These three requests require separate actions by the Planning Commission. Information in
this staff report will be presented relevant to all three requests, but staff recommendations
will be made for each individual request.
Af it,
N.
711
fj
06.
�� SEE'
h
a
f
IV E' -MUSGS
Historical Timeline
The following timeline has been constructed to provide the background on how the
"Gateway East" project developed and to demonstrate the amount of planning and
neighborhood input that went into this project.
70
Aug. 1987 Holiday Station Stores closes operations at 5807 University Avenue, but
retains ownership of building and site. Building remains vacant.
Nov. 1988 City receives development proposal from Winfield Development for
commercial redevelopment of NE quadrant of 57th and University Avenue.
Project does not proceed, in part because of costs related to purchase of
Valvoline Instant Oil Change facility.
1993 Holiday leases building at 5807 University Avenue to Cash 'n' Pawn.
Jun. 1998 Owner of JR's Automotive at 5755 University Avenue, indicates desire to
close business and approaches HRA with offer to sell. HRA acquires
building and evaluates redevelopment options for area, including possible
acquisition of adjoining properties.
Jul. 1998 HRA hires Hoisington Koegler Group to develop concept plans for
redevelopment of NE quadrant of 57th and University Avenue, exclusive of
the Valvoline Instant Oil Change site. That site is considered too expensive
to purchase based on previous discussions. Residential development(e.g.
town homes) becomes vision for area.
Apr. 1999 HRA signs purchase agreement with Holiday Co. to acquire 5807 University
Ave.
Aug. 1999 HRA initiates offers to purchase duplex at 349-353 57th Place, a vacant lot
next to JR's Automotive and a vacant lot at the corner of 4th St. and 57th
Avenue. Negotiations are successful on duplex, HRA initiates condemnation
proceedings on remaining parcels.
Nov. 1999 HRA closes on purchase of Holiday site.
Dec. 1999 HRA closes on duplex site.
Jan. 2000 Condemnation proceedings completed on two vacant lots. HRA completes
site assembly.
Mar. 2000 Staff conducts neighborhood meeting to receive input on project and concept
plans. Three options are presented at meeting for re-aligning streets in
project area. Residents in attendance favor plan to close off access to
neighborhood
71
� E �
c;
57thkbiveNE,
Street alignment favored by neighborhood —to be constructed.
May 2000 HRA solicits proposals from approximately 20 private developers. Uses
neighborhood input to identify desired site plan for developer.
June 2000 HRA receives two proposals for project.
Real Estate Equities (St. Paul) - Proposes to build 28 town homes. Owner-
occupied units, priced between $126,000 to $142,000.
Hokanson Development (Lino Lakes) - Proposes to build 40 town homes.
Owner-occupied units priced between $99,000 and $128,000.
July 2000 Demolition proceeds on Cash n Pawn, JR's Automotive, and duplex.
i'.
Cash-n-Pawn site during demolition
Aug. 2000 HRA selects Real Estate Equities' proposal.
72
Oct. 2000 HRA authorizes business terms for a Contract for Private Redevelopment
with Real Estate Equities.
City holds public hearing regarding creation of Tax Increment Financing
District.
Dec. 2000 HRA approves Contract for Private Redevelopment with Gateway East
Redevelopment LLC (owned by Real Estate Equities).
City and HRA approve Gateway East TIF District.
Jan. 2001 Developer prepares final plans, land use applications, holds neighborhood
meeting, and conducts additional environmental testing.
Feb. 2001 Land use approval process
Mar. 2001
(If approved)
Mar. 2001 Developer to apply for building permits.
Apr. 2001 HRA and developer to close on property.
May 2001 Developer to begin site work and remediation (if necessary).
Jun. 2001 Developer to begin construction of town homes.
Dec. 2002 Deadline for project completion.
HRA's Vision for Gateway East
The Housing & Redevelopment Authority's (HRA) goal for Gateway East is to convert this
former commercial area into a viable residential development. This owner occupied
townhome development is situated to take advantage of it's close proximity to 1-694, bus
routes, shopping opportunities and nearby schools.
Street Alignment & Site Plan Configuration
Prior to sending out a Request for Proposals to developers, the City staff& the HRA
examined ways to reconfigure the roadways through this site to maximize development
opportunities. Three site plans containing different roadway configurations were
developed. The City then reviewed the proposed layouts with the neighborhood adjoining
"Gateway East". The neighbors chose the road layout now being proposed by the
petitioner. This option does require the City vacate portions of existing street and utility
right-of-way and that the petitioner dedicate the needed right-of-way through the plat
process. The proposed street configuration is on sheet C4 of the attached plans. It should
be noted that this layout will eliminate Valvoline's access to the existing University Service
Drive, but that staff has met with Valvoline to discuss options for modifying their site.
73
A zoning designation of S-2 gives the City greater flexibility in determining setbacks for a
given project. This flexibility is needed in this case due to street alignments, right-of-way
needs, utility locations, and proximity to adjacent land uses. With this sight plan, where
front yard setbacks range from 19.5' to 35', the developer is trying to establish "residential
character" by providing some amount of separation between the streets and adjacent land
uses. The 35' front yard setbacks, typical in the surrounding residential area, is used on
the 6 buildings fronting on public streets. The reduced front yard setbacks are found on the
2 buildings which front on private streets.
Staff Recommendations
Granting of these variances will enable the City's HRA to realize their vision of turning this
site from two run down commercial buildings into new owner occupied housing.
City Staff recommends approval of the street and utility vacation request.
• New street alignments are needed to maximize development opportunities
• Neighborhood supports proposed street layout
• Public Works approves of the proposed street layout
City Staff recommends approval of the rezoning of the property to S-2,
Redevelopment District.
• Rezoning of property is necessary to provide desired density on this site
• Rezoning gives developer flexibility to develop site in a manner that is able to
establish "residential character"
City Staff recommends approval of the preliminary plat request.
• Proposed plat will combine the five properties in the project area into one property
• Proposed plat will dedicate the right-of-way necessary for street layout
Stipulations
City Staff recommend that the following stipulations be placed upon approval of the plat
request.
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the
issuance of any building permits, in order to minimize impacts to the surrounding
properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay$750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. The petitioner shall agree to preserve mature trees to the extent possible. All trees
required to be removed for the new homes shall be marked and approved by City
staff prior to issuance of building permits.
74
PLANNING COMMISSION MEETING, FEBRUARY 7, 2001 PAGE 3
2. PUBLIC HEARING:
Consideration of a Rezoning, ZOA#01-01, by Gateway East Redevelopment, LLC, to
rezone for a proposed 28 unit for sale townhome project, generally located at 5807 and
5755 University, 353 and 339 57th Place, and 348 575th Avenue.
3. PUBLIC HEARING:
Consideration of a Preliminary Plat, PS #01-01, by Gateway East Redevelopment, LLC,
for a preliminary plat for proposed 28 unit for sale townhome project, generally located at
5807 and 5755 University, 353 and 339 57th Place, and 348 57th Avenue.
4. PUBLIC HEARING:
Consideration of a vacation, SAV#01-01, by Gateway East Redevelopment, LLC, for a
street vacation for a proposed 28 unit for sale townhome project, generally located at
5807 and 5755 University, 353 and 339 57th Place, and 348 57th Avenue.
MOTION by Ms. Johns, seconded by Mr. Saba, to open the public hearing regarding item nos.
2,3, and 4.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED AND THE PUBLIC HEARING WAS OPENED AT 7:41 P.M.
Mr. Bolin stated that these three requests were for the Gateway East Project. The petitioners
are Gateway East Redevelopment and the Limited Liability Corporation. This is a joint venture
between Real Estate Equities and the Bisanz Brothers. The project is located at the corner of
57th and University Avenues. The entire site is about 2.5 acres in size. Former uses on these
properties included a pawn shop, automotive repair facility, a duplex, and two vacant sites. The
developer's and HR.A's goal is to change the current aging commercial structures into a livable
residential area. Gateway East Redevelopment is proposing 28 owner-occupied townhome
units to be priced between $126,000 and $142,000. Each townhome will be a three-story
design with two bedrooms and two car attached garages.
Mr. Bolin stated the developer is seeking to vacate portions of the University Service Road, a
portion of 57th Place, and a portion of 4th Street. They would also like to rezone the property
from a mix of C-2 commercial and R-2 residential into an S-2 redevelopment district. They
would like to replat the properties into one parcel suitable for townhome development. In 1988,
the City was approached by a developer who looked at developing this site and the Valvoline
site as commercial. Due to the fact that the property was so expensive, it was determined that
the development was not feasible.
Mr. Bolin stated that in 1998, JR's Automotive contacted the HRA about purchasing their
property. The HRA acquired the property and looked at redeveloping that quadrant. In July
1998, the HRA hired the Hoisington Koegler Group to develop specific concept plans for the
redevelopment of this quadrant at 57th, exclusive of the Valvoline site. In April 1999, the HRA
signed a purchase agreement to purchase the Holiday property occupied by Cash-N-Pawn. In
August 1999, the HRA initiated offers to purchase the duplex at 349 57th Place and the two
vacant lots.
Mr. Bolin stated that in March 2000, City staff conducted a neighborhood meeting to present
three options for realigning streets in the project area. The residents favored the plan which
closed off access to the neighborhood. The residents in the northeast portion did not want to
see 4th Street extended through. In June 2000, the HRA sent out proposals to a number of
PLANNING COMMISSION MEETING, FEBRUARY 7,2001 PAGE 4
developers. Two proposals were received by Gateway East Redevelopment for 28 townhome
units and Hokanson Development for 40 townhome units. It was determined that the less dense
28-unit townhome proposal would be most appropriate for this site.
Mr. Bolin stated that in July 2000, the HRA demolished the duplex, JR's Automotive, and Cash-
N-Pawn. In December 2000, the HRA approved the contract for private redevelopment with
Gateway East Redevelopment and approved the Gateway East TIF District. In January 2001,
the developer prepared the final plans with the land use applications, called a neighborhood
meeting, and started conducting additional environmental testing on the site.
Mr. Bolin stated staff recommends approval of the three requests. The proposed alignment for
the streets is supported by the neighborhood and the Public Works Department. Rezoning of
the property is necessary to get the density needed on this site to accommodate the 28 units
proposed and gives more flexibility to establish a more residential character. It allows for some
closer setbacks found on the private streets close to the development. The plat request is
necessary to combine the five properties in the project area into one property to be platted for
the units. This would also dedicate the right-of-way necessary for the proposed street layout.
Mr. Chris Winter, representing Real Estate Equities, stated they are requesting to realign and
vacate the University Avenue Service Road. Valvoline Oil will have their entrance relocated.
They are proposing eight buildings with five and three-unit clusters. Green grass will be
between buildings and the driveways and garages will be in back with a private entrance. There
will be a nice streetscape with front porches and landscaping. There will be a common area in
the center of the community and nice landscaping on various properties. They are proposing a
three story tuck-under garage style that would allow front porches and decks. Landscaping will
add different elements of interest. Shaker maintenance free siding will be throughout. Private
entrances are on the front and the back. They took a lot of time to work on the elevation. They
want to make the development as residential as possible and bring down the elevation.
Mr. Saba asked for more information about the landscaping.
Mr. Winter stated they are looking at a two inch tree in the front yard with various types. The
first level is a garage level with room for a home office/bedroom space. Two different main level
floor plans are being proposed right now. Both have two bedrooms and one and a half
bathrooms. Both offer a little computer nook area on the main level and great room and dining
room area. The third floor will have two bedrooms with a master suite walk-in closet, oversized
bathroom, and a bedroom/storage room.
Mr. Saba asked how much green space is in back.
Mr. Winter stated there is about 35 feet of setback in the front yard for green grass and trees.
There will be about four or five feet of green space between each driveway in the back. There
is green grass and trees in the side yard.
Ms. Johns asked if the environmental testing has been done.
Mr. Winter stated they did soil borings in a number of locations, and the results should be in
next week.
Mr. Saba asked if the computer nook will have cable access.
Mr. Winter stated that the will have cable and hone access.
Y P
r
PLANNING COMMISSION MEETING FEBRUARY 7 2001 PAGE 5
Ms. Savage asked if any calls were received.
Mr. Bolin stated that he has had three calls. Two were in favor of this and the third was just
curious about the project.
Ms. Savage asked if he had any problems with stipulations.
Mr. Winter stated they have no problems with the stipulations.
Mr. Oquist asked if there were any problems with the way the roads were constructed.
Mr. Bolin stated that in December he, the building inspectors, the Fire Marshall, and the City
Engineering staff met to discuss the road construction. They ended up moving some utilities
and one fire hydrant. There were no other issues.
Ms. Johns asked if Valvoline has a problem with anything.
Mr. Bolin stated Valvoline is working with the HRA on the best way to redesign the site.
MOTION by Mr. Kuechle, seconded by Mr. Saba, to close the public hearing.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED AND THE PUBLIC HEARING CLOSED AT 8:05 P.M.
Mr. Oquist asked about fencing.
Mr. Bolin stated there would be the same kind of brick and wrought iron fencing found at
Christenson Crossings and Walgreens. Some design criteria is already in place for the fencing.
Mr. Oquist stated that this is a nice package and would clean that area up.
Ms. Savage stated they certainly could use more residential in Fridley.
MOTION by Mr. Oquist, seconded by Ms. Johns, to approve Rezoning, ZOA#01-01.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED UNANIMOUSLY.
MOTION by Mr. Kuechle to approve Preliminary Plat, PS #01-01, with the following stipulations:
1. The petitioner shall obtain all necessary permits prior to construction.
2. The grading and drainage plan shall be approved by the City's Engineering staff prior to the
issuance of any building permits, in order to minimize impacts to the surrounding properties.
3. During construction, silt fencing shall be used where applicable.
4. The petitioner shall pay $750 per unit park fees prior to issuance of building permits.
5. The petitioner shall pay all water and sewer connection fees.
6. The petitioner shall agree to preserve mature trees to the extent possible. All trees required
to be removed for the new homes shall be marked and approved by City staff prior to
issuance of building permits.
PLANNING COMMISSION MEETING, FEBRUARY 7, 2001 PAGE 6
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED UNANIMOUSLY.
MOTION by Mr. Oquist, seconded by Mr. Saba, to approve Vacation, SAV#01-01.
UPON A VOICE VOTE, ALL VOTING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED UNANIMOUSLY.
Ms. Savage stated that these request will go to City Council on February 26.
5. RECEIVE THE MINUTES OF THE DECEMBER 4 2000 PARKS AND RECREATION
COMMIS ION MEETING:
MOTION by Mr. uist, seconded by Mr. Saba, to receive the minutes.
UPON A VOICE V TE, ALL VOTING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED NANIMOUSLY.
6. RECEIVE THE MINUTES OF THE JANUARY 8 2001 PARKS AND RECREATION
COMMISSION MEETING:
MOTION by Mr. Oquist, econded by Mr. Saba, to receive the minutes.
UPON A VOICE VOTE, LL VOTING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED UNA IMOUSLY.
7. RECEIVE THE MIN TES OF THE OCTOBER 25 2000 APPEALS COMMISSION
MEETING:
MOTION by Mr. Kuechle, sec nded by Ms. Johns, to receive the minutes.
UPON A VOICE VOTE, ALL V ,TING AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED UNANIMOUSLY.
ADJOURNMENT:
MOTION by Mr. Oquist to adjourn t e meeting. Seconded by Mr. Saba.
UPON A VOICE VOTE, ALL VOTIN AYE, CHAIRPERSON SAVAGE DECLARED THE
MOTION CARRIED AND THE FEBRU RY 7, 2001, PLANNING COMMISSION ADJOURNED
AT 8:11 P.M.
Respectfully submitted, \
Sign L. Johns �'N
Recording Secretary
AGENDA ITEM
ri CITY COUNCIL MEETING OF FEBRUARY 21, 2001
MY OF
FRIDLEY
Date: 2/20/01
To: William Burns, City Manager
From:Scott Hickok, Acting Community Development Director
Paul Bolin, Planner
RE: Consideration of a resolution for the vacation of streets in the Gateway East
project area.
M-01-15
INTRODUCTION
Gateway East Redevelopment, LLC is seeking to vacate portions of the University
Service Road and 57th Place, generally located at 57th Avenue & University Avenue,
in order to accommodate the development of 28 two bedroom townhome units.
The property referred to as "Gateway East' is comprised of properties formerly
used as a pawn shop, an automotive repair shop, a duplex, &two vacant lots.
PLANNING COMMISSION RECOMMENDATION
At the February 7, 2001 Planning Commission meeting, a public hearing was held
on the vacation request for the Gateway East property. After review of the proposed
project, a motion was made to recommend approval of the vacation request. The
motion carried unanimously.
PLANNING STAFF RECOMMENDATION
City staff recommends that the City Council concur with the Planning Commission
and approve the resolution for the street vacation request.
68
A 72 1 AGENDA ITEM
C) CITY COUNCIL MEETING OF FEBRUARY 21, 2001
CITY OF
FRIDLEY
Date: 2/20/01
To: William Burns, City Manager
From: Scott Hickok, Acting Community Development Director
Paul Bolin, Planner
RE: Consideration of a preliminary plat for the Gateway East project.
M-01-16
INTRODUCTION
Gateway East Redevelopment, LLC is seeking to replat the property, generally located at
57th Avenue & University Avenue, in order to accommodate the development of 28 two
bedroom townhome units.
The property referred to as "Gateway East" is comprised of properties formerly used as a
pawn shop, an automotive repair shop, a duplex, &two vacant lots.
PLANNING COMMISSION RECOMMENDATION
At the February 7, 2001, Planning Commission meeting, a public hearing was held on the
preliminary plat request for the Gateway East property. After review of the proposed
project, a motion was made to recommend approval of the preliminary plat request with
stipulations. The motion carried unanimously.
PLANNING STAFF RECOMMENDATION
City staff recommends that the City Council concur with the Planning Commission and
approve the preliminary plat with stipulations.
STIPULATIONS
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the
issuance of any building permits, in order to minimize impacts to the surrounding
properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay$750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. The petitioner shall agree to preserve mature trees to the extent possible. All trees
required to be removed for the new homes shall be marked and approved by City
staff prior to issuance of building permits.
61
AGENDA ITEM
ri CITY COUNCIL MEETING OF JUNE 18, 2001
CITY of
FRIDLEY
Date: 6/13/01
To: William Burns, City Manager
From:Scott Hickok, Community Development Director
Paul Bolin, Planning Coordinator
RE: Consideration of a resolution for final plat for the Gateway East project.
M-01-76
INTRODUCTION
Gateway East Redevelopment, LLC is seeking to replat the property, generally
located at 57th Avenue & University Avenue, in order to accommodate the
development of 28 two bedroom townhome units.
Since the City Council approved the Preliminary Plat on February 26, 2001, title
issues had arisen which caused a delay in moving the final plat forward. After
working with City Staff and Anoka County, the petitioner has made minor
modifications to the plat, which will enable the County to record the plat and
construction to begin.
PLANNING STAFF RECOMMENDATION
City staff recommends that the City Council approve the resolution creating the final
plat with stipulations.
STIPULATIONS
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to
the issuance of any building permits, in order to minimize impacts to the
surrounding properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay$750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. The petitioner shall agree to preserve mature trees to the extent possible. All
trees required to be removed for the new homes shall be marked and
approved by City staff prior to issuance of building permits.
14
FRIDLEY CITY COUNCIL MEETING OF JUNE 18,2001 PAGE 2
descriptions for th vacated properties were incorrect. Staff recommends Council's
approval of this r olution.
ADOPTED SOLUTION NO. 28-2001.
3. RESOLUTION NO. 29-2001 APPROVING A PLAT, P.S. #01-01 (GATEWAY
EAST), BY GATEWAY EAST REDEVELOPMENT, LLC, TO REPLAT
PROPERTY FOR THE PURPOSE OF CREATING 28 LOTS AND 6 OUTLOTS
TO ALLOW THE CONSTRUCTION OF 28 OWNER-OCCUPIED TOWNHOME
UNITS, GENERALLY LOCATED AT 57 1/2 AVENUE AND UNIVERSITY
AVENUE N.E. (WARD 1):
Mr. Burns, City Manager, stated that this resolution approves the plat that contains the
corrected right-of-way vacation. Staff recommends Council's approval with the following
six stipulations:
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the
issuance of any building permits, in order to minimize impacts to the surrounding
properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay $750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. Petitioner shall agree to preserve mature trees to the extent possible. All trees
required to be removed for the new homes shall be marked and approved by City
staff prior to issuance of building permits.
ADOPTED RESOLUTION NO. 29-2001.
4. RESOLUTION O. 30-2001 TO VACATE A PORTION OF THIRD STREET,
GENERALLY LOCATED EAST OF FIFTH STREET N.E. AND NORTH OF
THE APARTMEN S AT 5451 FIFTH STREET N.E. SAV #01-05, BY HARRIET
SKARIE)(WARD 1).
Mr. Burns, City Manag , stated that the proposed vacation is south of I-694 near
University Avenue. The p ion of Third Street is unimproved and has no relationship to
any portion of Third Stree that is improved already. It is also the site for 16 non-
conforming garages in a parka g complex. The area covered by the proposed vacation is
1.62 acres and the northernmos five feet to be vacated is dedicated back to the City as a
utility easement. Staff reco ends Council's approval with the following two
stipulations:
1. A utility easement on the no ern 5 feet of the property is dedicated back to the
City.
CITY OF
F14DLEY
FRIDLEY MUNICIPAL CENTER•6431 UNIVERSITY AVE. N.E. FRIDLEY,MN 55432 •(612)571-3450•FAX(612)571-1287
CITY COUNCIL
ACTION TAKEN NOTICE
February 28, 2001
Gateway East Redevelopment, LLC
325 Cedar Street
Suite 400
St. Paul, MN 55101
Dear Sirs:
On Monday, February 26, 2001, the Fridley City Council officially approved your request for a
Preliminary Plat, PS #01-01, by Gateway East Redevelopment, LLC, for a proposed 28-Unit
Townhome Development, generally located at 5807 and 5755 University Avenue, 353 and 339
57' Place, and 348 57" Avenue NE.
Approval of this Preliminary Plat, PS #01-01, is contingent upon the following stipulations:
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the issuance
of any building permits, in order to minimize impacts to the surrounding properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay $750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. The petitioner shall agree to preserve mature trees to the extent possible. All trees required
to be removed for the new homes shall be marked and approved by City staff prior to
issuance of building permits.
The Council action described above is only to approve the preliminary plat. You must have an
approved final plat prior to recording at Anoka County. When the final plat has been prepared
by your surveyor, a copy of the plat should be sent to the Anoka County's Surveyor's office for
review. Once that review is completed, please submit three full size copies of the final plat to
the Community Development Department. The Community Development staff will contact you
as to which council meeting the item will be scheduled for consideration (it will be placed under
the "consent agenda"). After Council action on the final plat, the mylars of the plat must be
submitted to the City for signature by the Mayor and City Clerk. Once signed, the plat is ready
for recording at Anoka County. The final plat must be submitted for action within six months of
approval of the preliminary plat.
Action Taken Letter-Gateway East Redevelopment
Page 2
February 28, 2001
If you have any questions regarding the above action, please call me at 763-572-3590.
Sinc ly,
Sc t Hickok
Community Development Director
SH/jt
cc: Plat File
Address File
Assessing Dept.
GIS Dept.
Please review the above, sign the statement below and return one copy to the City of Fridley
Planning Department by March 12, 2001
Concur with action taken.
C-01-19
CI"IYOF
FMDLEY
FRIDLEY MUNICIPAL CENTER•6431 UNIVERSITY AVE.N.E.FRIDLEY,MN 55432•(763)571-3450•FAX(763)571-1287
CITY COUNCIL
ACTION TAKEN NOTICE
June 21, 2001
Gateway East Redevelopment, LLC
325 Cedar Street
Suite 400
St. Paul, MN 55101
Dear Sirs:
On I+Y"o;,uay, Juno 18, 2001, the Fridley City Council officially approved year reyucst fcr a Final
Plat, PS #01-01, Resolution #29-2001, by Gateway East Redevelopment, LLC, for a proposed
28-Unit Townhome Development, generally located at 5807 and 5755 University Avenue, 353
and 339 57th Place, and 348 57th Avenue NE.
Approval of this Final Plat, PS #01-01, is contingent upon the following stipulations:
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the issuance
of any building permits, in order to minimize impacts to the surrounding properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay $750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. The petitioner shall agree to preserve mature trees to the extent possible. All trees required
to be removed for the new homes shall be marked and approved by City staff prior to
issuance of building permits.
If you have any questions regarding the above action, please call me at 763-572-3590.
Sine y,
Sc tt Hickok
munity Development Director
SH/jt
u �
Action Taken Letter-Gateway East Redevelopment
Page 2
June 21, 2001
cc: Plat File
Address File
Assessing Dept.
GIS Dept.
Special Assessments-Sharon
Please review the above, sign the statement below and return one copy to the City of Fridley
Planning Department by July 2, 2001
Co ith action f-en.
C-01-83
555017
STATE OF MINNESOTA ) CITY COUNCIL PROCEEDINGS
SUBDIVISION (PLAT OR LOT SPLIT)
COUNTY OF ANOKA )
f`IT\/ rlC FRIDI EV
In the Matter of: Preliminary Plat, PS #01-01
Owner: HRA in and for the City of Fridley
The above entitled matter came before the City Council of the City of Fridley and was heard on the 26th day of
February, 2001, on a petition for a subdivision pursuant to the City of Fridley's Zoning Ordinance, for the
following described property:
For a proposed 28-unit townhome development, generally located at 5807 and 5755 University
Avenue, 353 and 339 57th Place and 348 57th Avenue NE, legally described as:
Lots 6, 7, 8, 9, Block 4, Bennett-Palmer Addition, Subject to Easement of Record
Lots 1, 2, and 3, Block 3, City View Addition, Subject to Easement of Record
Lots 4, 5, 6, Block 3, City View Addition, Subject to Easement of Record
Lots 7, 8, Block 3, City View Addition, Subject to Easement of Record
Lots 5, 6, and 7, Block 6, City View Addition, Subject to Easement of Record
IT IS ORDERED that a subdivision be granted as upon the following conditions or reasons:
Approval with six stipulations. See City Council Meeting Minutes of February 26th, 2001.
STATE OF MINNESOTA )
COUNTY OF ANOKA ) OFFICE OF THE CITY CLERK
CITY OF FRIDLEY )
I, Debra A. Skogen, City Clerk for the City of Fridley, with and in for said City of Fridley, do hereby certify that I
have compared the foregoing copy and order granting a subdivision with the original record thereof preserved
in my office, and have found the same to be a correct and true transcript of the whole thereof.
IN TESTIMONY WHEREOF, I have hereunto subscribed my hand at the City of Fridley, Minnesota, in the
County of Anoka on the day of /444ttk 12001.
DRAFTED BY:
City of Fridley
6431 University Avenue N.E.
Fridley, MN 55432 Debra A. Skogen, City erk _
_ L)
'.%. ' A V
FRIDLEY CITY COUNCIL MEETING OF FEBRUARY 26,2001 PAGE 9 -
Councilmember Bolkcom stated that they would have to be careful to in sure they are not
increasing their liability by doing that.
Mr. Hickok stated that one concern of the wall is that it can ca a damage to the plow
equipment, which could become a problem.
Mayor Lund asked about lighted bulbs there.
Mr. Hickok stated that would be a nice solution.
Councilmember Billings asked how the zoning is determine on the vacation of part of 57`h Place
and part of the University Avenue Service Drive.
Mr. Hickok stated that they need to take the zonin action First and then the land would be
considered the same zoning. The vacation comes a er that. The land use would be recognized
that the zoning is intended for the land underneath Staff would like to make sure that the legal
description for the zoning matches.
MOTION by Councilmember Billings to clos the public hearing. Seconded by Councilmember
Bolkcom.
UPON A VOICE VOTE, ALL VO NG AYE, MAYOR LUND DECLARED THE
MOTION CARRIED AND THE PUB IC HEARING WAS CLOSED AT 8:35 P.M.
t
14. FIRST READING OF AN � INANCE TO AMEND THE CITY CODE OF THE
CITY OF FRIDLEY, M ESOTA, BY MAKING A CHANGE IN ZONING
DISTRICTS REZONI REQUEST, ZOA #01-01, BY GATEWAY EAST
REDEVELOPMENT, L C :
Councilmember Billings aske when the sixty-day statutory time period would end.
Mr. Bolin stated that the sixyy-day period ends on March 5.
Councilmember Billings isked if this was tabled until Mlarch 5, if it would create a problem for
anyone. 1
i
Mr. Winter stated that Yiie sooner the better and that date would work.
MOTION by Councilmember Billings to approve Rezoning Request ZOA #01-01. Seconded by
Councilmember Bolkcom.
MOTION by Councilmember Billings to table Rezoning Request ZOA#01-01 in order to clarify
the language as#ppropriate and bring it back on the consent agenda of March 5. Seconded by
Councilmember Bolkcom.
FRIDLEY CITY COUNCIL MEETING OF FEBRUARY 26,2001 PAGE 10
Mayor Lund suggested that Item s. 15 and 16 be treated the same way.
UPON A VOICE VOTE, ALL VOTING AYE, MAYOR LUND DECLARED THE
MOTION CARRIED UN NIMOUSLY.
15. PRELIMINARY PLAT REQUEST, PS #01-01, BY GATEWAY EAST
REDEVELOPMENT, LLC, FOR A PROPOSED 28-UNIT TOWNHOME
DEVELOPMENT, GENERALLY LOCATED AT 5807 AND 5755 UNIVERSITY
AVENUE,353 AND 339 57H PLACE AND 348-57 1H AVENUE N.E. (WARD 1)
Councilmember Billings stated that the roadway is vacated and reverts to the abutting property.
A portion of 57`h Place is adjacent to the current Valvoline Oil operation. There is also a
condemnation procedure. He asked if this includes the portion of the future vacated right-of-
way.
Mr. Fernelius, HRA Housing Coordinator, stated that the condemnation was totally unrelated to
that portion and it is not included.
Councilmember Billings asked if the southern half of 57`h Place adjacent to the Valvoline Oil
reverts to Valvoline Oil rather than the City.
Mr. Fernelius stated that it would revert to Valvoline Oil. The issue is what the City should do
since half that vacated right-of-way is affected. Valvoline has been approached with an offer for
that part of it and it has not been resolved yet.
Councilmember Billings stated that at this point neither the City nor the developer has control of
the southern 33 feet of that piece of property adjacent to Valvoline Oil. He asked how Council
could approve a plat for something someone else has control over.
Mr. Hickok, Community Development Director, stated that they are optimistic and confident that
an agreement can be reached a provision be made to maintain the overall integrity of the project.
Councilmember Billings asked if it would be more practical to vacate the north 33 feet of 57th
Place and then the other 33 feet adjacent to Valvoline Oil would remain as City right-of-way. He
asked what would be the best way to handle this and vacate the remaining portion of the street or
hold up the vacation.
Mr. Hickok stated that his solution aligns with staff s. The ideal would be to have both pieces
and make it part of the plat and consider it all part of the parcel. If it does not work, this project
would have to be revisited.
Mayor Lund asked if this puts them into a lesser position by allowing this tonight.
s
FRIDLEY CITY COUNCIL MEETING OF FEBRUARY 26,2001 PAGE 11
Mr. Hickok stated that there is a plan to do extensive landscaping in the right-of-way area and
treat it as open space for the developer. This is something that came later as staff was analyzing
this plat. He said staff felt the best solution was to move this forward and proceed as we have.
Councilmember Billings asked if the plat would be finalized in the future and if Council could
proceed with approving the plat that evening in its entirety. He asked if the plat could be redone.
Mr. Hickok stated that Council has an opportunity at the time of the final plat to discuss any
issues.
MOTION by Councilmember Billings to approve the preliminary plat request. Seconded by
Councilmember Bolkcom.
UPON A VOICE VOTE, ALL VOTING AYE, MAYOR LUND DECLARED THE
MOTION CARRIED UNANIMOUSLY.
16. RESOLUTION TO VACATE PORTIONS OF THE UNIVERSITY SERVICE
ROAD AND 57 ACE, GENERALLY LOCATED NORTHEAST OF 57
AVENUE AND UNI RSITY AVENUE IN ORDER TO ACCOMMODATE THE
GATEWAY EAST DEVELOPMENT PROJECT ACATION REQUEST,
SAV 901-01, BY GATE AY EAST REDEVELOPMENT LLC ARD 1):
MOTION by Councilmember Bi ings to table this item until March 5. Seconded by
Councilmember Bolkcom.
UPON A VOICE VOTE, ALL TING AYE, MAYOR LUND DECLARED THE
MOTION CARRIED UNANIMOUS Y.
17. SPECIAL USE PEIUMIT RE
ST, SP #01-01, BY WAYNE DAHL, TO ALLOW
AN AUTOMATIC READER BOARD SIGN TO CHANGE ITS MESSAGE MORE
THAN ONCE EVERY 15 MINUTES, GENERALLY LOCATED AT 7699
HIGHWAY 65:
Mr. Bolin, Planner, stated that the petitioner i Dr. Wayne Dahl of North Metro Spine Care.
Code requires a special use permit to allow a tomatic readerboard signs but not to change
messages other than time and temperature more th once every fifteen minutes. His property is
C-2 commercial. He neighbors with Wendy's, Spik r's, and a small office building to the east of
his property. The site was originally the FrosTop Drive-In in 1964. It was also used as a
miniature golf course in the late 1970's. Dr. Dahl pur ased the property in 1981 and remodeled
it to accommodate his chiropractic office. Sign perm.ts were issued for pylon signs in 1981,
1988, and 1986 by the Planning Commission. A pub is hearing was held on this issue. A
motion was approved to direct approval of the special us permit with stipulations. Automatic
changeable readerboard signs are an approved special use provided that the message does not
change more than once every fifteen minutes. In 1996, a sp ial use permit was obtained for the
time and temperature readerboard, and it will need to be rem ved as it is 4.8 square feet. Staff
FRIDLEY CITY COUNCIL MEETING OF FEBRUARY 26,2001 PAGE 12
recommended that Council concur with the Planning Commission recommendatio of approval
for the special use permit subject to stipulations.
MOTION by Councilmember Billings to approve SP #01-01 with stipulatio s. Seconded by
Councilmember Bolkcom.
UPON A VOICE VOTE, ALL VOTING AYE, MAYOR LUND DECLARED THE
MOTION CARRIED UNANIMOUSLY WITH THE F LLOWING TWO
STIPULATIONS: 1) PETITONER SHALL OBTAIN SIGN RMITS PRIOR TO
INSTALLING ANY SIGNAGE ON SITE; AND 2) EXISTING IME/TEMPURATURE
READER BOARD TO BE REMOVED PRIOR TO GRANT G OF SIGN PERMITS
FOR NEW SIGNAGE.
18. VARIANCE REQUEST, VAR #01-01, BY WAY DAHL, TO ALLOW AN
AUTOMATIC READER BOARD SIGN TO CHANGE ITS MESSAGE MORE
THAN ONCE EVERY 15 MINUTES, GENRkALLY LOCATED AT 7699
HIGHWAY 65 (WARD 2):
Mr. Bolin, Planner, stated that at the February 14 Appea Commission meeting, a public hearing
was held on this variance. After discussion over the ack of hardship necessary to grant this
variance a motion was made and approved to recom end denial. Prior to granting of the sign
variance, there are four requirements that need to b met. The first is that there will need to be
exceptional or extraordinary circumstances applic le to the property or to the intended use that
do not apply generally to other properties in the same vicinity or district. The circumstances
surrounding this property are neither exception nor extraordinary. There is direct frontage on
Highway 65 and Osborne Road with a single o cupaut. No other automatic readerboard signs in
Fridley change messages more than once ev fifteen minutes. The variance is necessary for
the preservation and enjoyment of the prope y rights possessed by other properties in the same
vicinity or district. Neither the petitioner nor the properties located in Fridley that have had
automatic readerboard signs changed mes ges more than once every fifteen minutes.
Mr. Bolin said that the third requireme t is that strict'application would constitute unnecessary
hardship. This business has been in t s location since 1981. This site has optimum visibility.
The petitioner could raise the height the sign to the 25 foot maximum allowed by code. Strict
application of the code requires that he petitioner not change the sign message more than once
every fifteen minutes. The fourth equirement is that the granting of the variance may not be
materially detrimental to the publ' health, safety, general welfare, or to the properties in the
vicinity in which the property is 1 Gated. Quick changing messages may be detrimental to public
safety. If you are driving by th e signs and do not catch the whole message you might try to
catch the rest in the rearview irror as you go by. Staff recommended denial, as there is no
statutory hardship and no comp rable variances have been granted. This would set a precedent.
Mr. Kelly Kannigan, represen ing Dr. Dahl, stated that the reason businesses, municipalities, and
schools use these is that they o not pose a danger. He has letters from Costa Mesa and Norwalk
that state that these readerb and signs in no way influence traffic accidents. Many businesses
readerboards have larger t xt with two or three different changes with one message. Mr.
ABSTRACT
Receipt# gnO iso ❑ Certified Copy
Date Mailed DOCUMENT N0.
rde: 1555017 . 0 ABSTRACT
Doc.Order of/ /'7-� El Tax Liens/Releases ANOKA COUNTY MINNESOTA
El Multi-Co Doc Tax Pd I HEREBY CERTIFY THAT THE WITHIN INSTRUMENT WAS FILED IN THIS OFFICE
./by: Pins: ry)L FOR RECORD ON MAR 12 2001
Recordability/ I Delgs: rn�L ❑ Transfer El New Desc.
AT 5 : 00 PM AND WAS DULY RECORDED.
,y-. FEES AND TAXES IN THE AMOUNT OF
Filing Fees:,'# I •S� El Division El GAC $19 - 50 PAID.
Well Certificate ❑ Status ❑ Def.Spec RECEIPT NO. 2001021789
Received this Date: N J.
ANOKACOUNTYPROPER7YTAX /$TRORDER�RE�STRAROFTITLES
Anoka County Recorder El Other E] No Change
BY SLZ
Notes: DEPUTY PROPERTY TAX ADMINISTRATOR/RECORDER/REGISTRAR OF TITLES
STATE OF MINNESOTA }
COUNTY OF ANOKA } §
CITY OF FRIDLEY }
I,the undersigned,being duly qualified City Clerk of the City of Fridley,Minnesota, do hereby
certify that I have carefully compared the RESOLUTION attached hereto, adopted by the City
Council of the City of Fridley at said meeting on June 18,2001,with the original record thereof on
file in my office,and the same is a full,true and complete transcript therefrom insofar as the same
relates to:
RESOLUTION NO. 29-2001
RESOLUTION APPROVING A PLAT,P.S.#01-01 (GATEWAY EAST),BY GATEWAY
EAST REDEVELOPMENT,LLC. TO REPLAT PROPERTY FOR THE PURPOSE OF
CREATING 28 LOTS AND 6 OUTLOTS TO ALLOW THE CONSTRUCTION OF 28
OWNER OCCUPIED TOWNHOME UNITS,GENERALLY LOCATED AT 57%AVENUE
&UNIVERSITY AVENUE.
WITNESS MY HAND as City Clerk of the City of Fridley and the seal of the City this 2nd day of
July 2001.
(SEAL)
Debra A. Skogen
City Clerk of the City of Ft dley
RESOLUTION NO. 29-2001
RESOLUTION APPROVING A PLAT, P.S. #01-01 (GATEWAY EAST),BY GATEWAY
EAST REDEVELOPMENT,LLC. TO REPLAT PROPERTY FOR THE PURPOSE OF
CREATING 28 LOTS AND 6 OUTLOTS TO ALLOW THE CONSTRUCTION OF 28
OWNER OCCUPIED TOWNHOME UNITS, GENERALLY LOCATED AT 57%
AVENUE & UNIVERSITY AVENUE.
WHEREAS, the Planning Commission held a public hearing on February 7, 2001, and
recommended approval of said plat; and
WHEREAS, the City Council approved the preliminary plat for GATEWAY EAST ADDITION
at the February 26, 2001, meeting with stipulations attached as Exhibit A; and
WHEREAS, a copy of the plat GATEWAY EAST ADDITION has been attached as Exhibit B.
NOW, THEREFORE, BE IT RESOLVED, that the City Council approves the Final Plat for
GATEWAY EAST ADDITION and directs the petitioner to record plat at Anoka County within
six months of this approval or such approval shall be null and void.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS
18th DAY OF JUNE,2001.
Scott J. Lund-MAYOR
ATTEST:
Debra A. Skogen, 4y Cler
Resolution No. 29 - 2001 Page 2
EXHIBIT A
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the issuance of
any building permits, in order to minimize impacts to the surrounding properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay$750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. The petitioner shall agree to preserve mature trees to the extent possible. All trees required
to be removed for the new homes shall be marked and approved by City staff prior to
issuance of building permits.
Y
�0 5_ r?
-1
o
�� I SM9TN'E 12!.70 a�-,•G-C—r•- �� �3� p 2
-i C:
C) — 25 I nx.crr-..ua.mmr
Nrrn>.rr. r_aw,3arY�-
f,
715
-i I N -i �s t •� '� _- _
_ - - NMrea-W 1"." —
112 Tris ✓ Es x
i u[v aav x arr ucr _
se9,r.at_.. 37a82
co
rn
__ -i <: >!. f { •� - � �, ata �
_xaa xa a a.a _xs.a >J xna N stair. 1F (A
Z `
°ems
yyy �GtO - - '�vYq�r 6tOx�a_ - Iraltr)Ya am
o ss a- ato w 1 i�_
` 5`0° r v
Mp91r4rW aar a
'-nom'•' •- - io,-' � arta�v�,a. �
vn� - v
• i rtritt 1; ,rr. :•isaar: f `i r fl PLACG
2_w-•moi'- --�!i4t_'}.9i..-- -_ �� Y. ar+r.rr n jaes: H$ --awnr uc v wr.. _
V.i_ c-`'trrrlr.r.o Na!mCra oEnM
A a o 9.57- +
ca
` •—" MM74a'W 21a,13
y-rrlr.r. 't- S "'as a0ap orr vn
rrl ._._-.amtr dmsarr v+K ta,nr o ato f C 1 Z
u[v aav 3.Pn.c'a iaa
4C Jn -''i I -•
_ _i ato 0 8
c� I a n I itM�3A -
J a
s '•` Ia i T
'� v swx'A•.`�3 • `i
-•- Na91r4a-w 121.00 ----
m
9
cm PRO
A T/, N
N m= I flr,rv,ri_r Vry -. Ir')I ✓VrrrV . rVl fr- Du 'i
rl
A i
T �>
N =
ANOKA COUNTY PROPERTY RECORDS .❑ XSSTRACT Receipt#
2100 3rd Avenue, Anoka, Minnesota 55303 , " TORRENS Certificate# 2- �1'f
S2 V
Filed by: e
The instruments forwarded on 7 /� d is are not acceptable for filingfor the
c � / 1 P
reasons listed below:
❑ Warranty Deed ❑ Assign Mortgage ❑ Aff of Survivorship
❑ Quit Claim Deed ❑ Satis/Rel Mortgage ❑ Contractfor Deed
❑ Mortgage ❑ Partial Rel Mortgage ❑ Other Ot t
Reasons:
pf,f atlGV t/ r n 0 17
iCVtS �,(,( �atd I X+ -710.3~ yZ z -- 7 s
KL C�
PLEASE NOTE: WHITE OUT IS NOT ACCEPTABLE ON TOR RENS DOCUMENTS
PLEASE RETURN THIS FORM WHEN YOU RESUBMIT YOUR DOCUMENTS.
NAME �Vwl Phone# (612)323-54
Original: Document Copy Blue: Filo Copy 7-1V
�'Fridley, Anoka.Minnesota...!/�1�� _ /..................
.
COUNTY RECORDER OF ANOKA COUNTY, MINNESOTA
Please charge against our deposit with you for the record of the following instruments-
Doc. No. Inst.
r `'1
o
Please includ key info on receipt to City
TOTAL . . . . ... . . . .
By ..i!:::: /1�/ .� . .....................
Debra A. Skogen, City Clerk for the City of Fridley, with and in for said City of Fridley, do hereby certify that I
have compared the foregoing copy and order granting a subdivision with the original record thereof preserved
in my office, and have found the same to be a correct and true transcript of the whole thereof.
IN TESTIMONY WHEREOF, I have hereunto subscrib d my hand at the City of Fridley, Minnesota, in the
County of Anoka on the ,th day of 12001.
DRAFTED BY:
City of Fridley
6431 University Avenue N.E.
Fridley, MN 55432 Debra A. Skogen, City CIA
(SEAL)
FRIDLEY CITY COUNCIL MEETING OF JUNE 18,2001 PAGE 2
descriptions for th vacated properties were incorrect. Staff recommends Council's
approval of this r olution.
ADOPTED SOLUTION NO. 28-2001.
3. RESOLUTION NO. 29-2001 APPROVING A PLAT, P.S. #01-01 (GATEWAY
EAST), BY GATEWAY EAST REDEVELOPMENT, LLC, TO REPLAT
PROPERTY FOR THE PURPOSE OF CREATING 28 LOTS AND 6 OUTLOTS
TO ALLOW THE CONSTRUCTION OF 28 OWNER-OCCUPIED TOWNHOME
UNITS, GENERALLY LOCATED AT 57 1/2 AVENUE AND UNIVERSITY
AVENUE N.E. (WARD 1):
Mr. Burns, City Manager, stated that this resolution approves the plat that contains the
corrected right-of-way vacation. Staff recommends Council's approval with the following
six stipulations:
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the
issuance of any building permits, in order to minimize impacts to the surrounding
properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay $750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. Petitioner shall agree to preserve mature trees to the extent possible. All trees
required to be removed for the new homes shall be marked and approved by City
staff prior to issuance of building permits.
ADOPTED RESOLUTION NO. 29-2001.
4. RESOLUTION NO. 30-2001 TO VACATE A PORTION OF THIRD STREET,
GENERALLY LOCATED EAST OF FIFTH STREET N.E. AND NORTH OF
THE APARTMEN S AT 5451 FIFTH STREET N.E. SAV 401-05, BY HARRIET
SKARIE)(WARD 1):
Mr. Burns, City Manag , stated that the proposed vacation is south of I-694 near
University Avenue. The p ion of Third Street is unimproved and has no relationship to
any portion of Third Stree that is improved already. It is also the site for 16 non-
conforming garages in a parka g complex. The area covered by the proposed vacation is
1.62 acres and the northernmos five feet to be vacated is dedicated back to the City as a
utility easement. Staff reco ends Council's approval with the following two
stipulations:
1. A utility easement on the no ern 5 feet of the property is dedicated back to the
City.
THE MINUTES OF THE REGULAR MEETING OF THE FRIDLEY CITY COUNCIL
OF JUNE 18,2001
The Regular Meeting of the Fridley City Council was called to order by ayor Lund at 7:30
p.m.
PLEDGE OF ALLEGIANCE:
Mayor Lund led the Council and audience in the Pledge of Alle 'ance to the Flag.
ROLL CALL:
MEMBERS PRESENT: Mayor Lund, Councilme er Barnette, Councilmember Billings,
Councilmember Wolfe Councilmember Bolkcom.
MEMBERS ABSENT: None.
APPROVAL OF PROPOSED CONSENT A NDA:
MOTION by Councilmember Barnette to a rove the proposed consent agenda. Seconded by
Councilmember Bolkcom.
UPON A VOICE VOTE, ALL V ING AYE, MAYOR LUND DECLARED THE
MOTION CARRIED UNANIMOU Y.
APPROVAL OF MINUTES: Cit Council Meeting of June 4, 2001.
APPROVED.
NEW BUSINESS:
1. RECEIVE THE P ANNING COMMISSION MEETING MINUTES OF JUNE 6,
2001:
RECEIVED.
2. RESOLUTI NO. 28-2001 TO VACATE PORTIONS OF THE UNIVERSITY
AVENUE SERVICE ROAD AND 57 PLACE, GENERALLY LOCATED
NORTHEAST OF 57 AVENUE AND UNIVERSITY AVENUE IN ORDER TO
ACCOMMODATE THE GATEWAY EAST REDEVELOPMENT PROJECT
(WARD ):
Mr. Bs, City Manager, stated Gateway East Redevelopment, LLC, is seeking to vacate
portions of University Avenue and 57`h Place. This is necessary to accommodate 28
owner-occupied townhomes the developer is proposing for this site. The original legal
Resolution No. 29 - 2001 Page 2
EXHIBIT A
1. Petitioner shall obtain all necessary permits prior to construction.
2. Grading and drainage plan to be approved by City's engineering staff prior to the issuance of
any building permits, in order to minimize impacts to the surrounding properties.
3. During construction, silt fencing shall be used where applicable.
4. Petitioner to pay $750 per unit park fees prior to issuance of building permits.
5. Petitioner to pay all water and sewer connection fees.
6. The,petitioner shall agree to preserve mature trees to the extent possible. All trees required
to be removed for the new homes shall be marked and approved by City staff prior.to
issuance of building permits.
I
i
THIS PAGE IS NOT PART OF THE ORIGINAL DOCUMENT
PRESENTED FOR RECORDING
I
Added by Anoka County Recorder for posting cnly.
Post to Abstract Document Number �55 d ( 1
j PIN Range
j
aL4 - ;)L C) thrcucn 00-7/6
j 2 2-3 , 30 a a L OQ 1 thrcucn
3.
7" 3 . 3 p Y • �-�/ • �O'7� thrcuch
T• A3 , 30 ' -D Lf - a Y • 0 1 C) � thrcucn
6. thrcucn
6. throuch
I
7. thrcucn I
f8. _ thrcuch
9. throuch
10. throuch
I
1 1 . throuch
12. throuch
13. throuch
14. throuch