Res 2019-35 2020 Street Rehab Proj.RESOLUTION NO. 2019 - 35
A RESOLUTION ORDERING PREPARATION OF PRELIMINARY REPORT, PLANS,
AND SPECIFICATIONS FOR
2020 STREET REHABILITATION PROJECT NO. ST2020-01
WHEREAS, the City of Fridley staff regularly monitors the condition of streets and maintains them
in good condition, and
WHEREAS, the City of Fridley staff has developed a long-range pavement management plan to
rehabilitate select street segments by neighborhoods identified in the plan, and
WHEREAS, the City of Fridley thereby maintains the condition of its streets in the most cost-
efficient manner through this methodology, avoiding failing street conditions and reducing excessive
maintenance costs, and
WHEREAS, the City of Fridley funds these rehabilitation projects through its street reserve fund,
with special assessments in accordance with its policies as one source of funding for said projects
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fridley as follows:
That it appears in the interests of the City and of the property owners affected that there be
constructed certain improvements to -wit:
Street and utility improvements, including milling, bituminous asphalt overlay, pavement
reclamation, drainage, water main, and utility repairs including the street segments as follows:
79TH WAY
from EAST RIVER ROAD to CUL-DE-SAC
ASHTON AVENUE
from 79TH WAY to CUL-DE-SAC
ELY STREET
from 232' WEST OF RUTH STREET to 1,041' EAST
HUGO STREET
from EAST RIVER ROAD to IRONTON STREET
IRONTON STREET
from EAST RIVER ROAD to HUGO STREET
LIBERTY STREET
from 107' WEST OF RUTH ST to 1,135' EAST
LONGFELLOW STREET
from EAST RIVER ROAD SVC RD to CUL-DE-SAC
RUTH STREET
from LIBERTY STREET to RUTH CIRCLE
That the work involved in said improvements listed above shall hereafter be designated as:
2020 STREET REHABILITATION PROJECT NO. ST2020-01
2. That the Public Works Director, James P. Kosluchar, City Hall, Fridley, MN, is hereby authorized
and directed to draw the preliminary plans and specifications and to tabulate the results of his
estimates of the costs of completion and all fees and expenses incurred (or to be incurred) in a
preliminary report of his finding stating therein whether said improvements are feasible and
whether they can best be made as proposed, or in connection with some other improvements (and
the estimated costs as recommended), including also a description of the lands or area as may
receive benefits there from and as may be proposed to be assessed.
Resolution No. 2019 — 35 Page 2
3. That said preliminary report of the Public Works Director shall be furnished to the City Council.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 121h
DAY OF AUGUST, 2019.
SCOTT J. LUND — MAYOR
ATTEST:
DEBRA A. SKOGEN - CITY CLERK
0
. ..........
MINOR ........... .
IIIIIIIIIIIIIIIIIIIII�IIIII'tltllllllI
mw�
M=
G..PP`:
Frid l,yEn gin—mg
FridleyG[5
Map Date: 1/11/2019
z
,, j �1 IJ
,1, - ""I SM -EJ �,
Pain,, F��o��a�a�na, ��s���a�aio�e���o,�e,o�aa=�„aa�pa naa�9s�a�pa naa�9P�-019.2029— -a 1,1-19
t
` city of
Fridley
Street Resurfacing Plan
2019-2029
IV
k
YaJ.. VC's:
=j
�i Ili
Ma'il%N
6)
Resurfacing of Local
Streets to be Determined
2019 " 2025
2020
2026
2021 2027
2022 2028
2023 2029
2024