Resolution No. 2021-83 Civic Campus West Project Bids
Resolution No. 2021-83
Awarding Civic Campus West Plaza Project No. 405-31-21150
Whereas, the Civic Campus West Plaza Project (Project) is included as part of the City’s Capital
Investment Program; and
Whereas, City Staff directed final plan completion considering input received and requested
quotes from three contractors based on the plans;
Whereas, three quotes were received and tabulated and found the low responsive proposal is
determined to be within budget for the Project,
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves
received quotes per the attached bid tabulation and award the Civic Campus West Plaza Project
No. 405-31-21150 to Sunram Construction, Inc. of Corcoran, MN in the amount of $53,113.
th
Passed and adopted by the City Council of the City of Fridley this 27 day of September,
2021.
_______________________________________
Scott J. Lund – Mayor
Attest:
Melissa Moore – City Clerk
BIDDINGTABULATION
CIVIC CAMPUS WEST PLAZA CITY OF FRIDLEY, MN
BMI PROJECT NO. R12.121541
BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices:
SunramPetersonBlackstone
NOTE: BIDS shall include sales tax and all applicable taxes and fees.
BIDDER must fill in unit prices in numerals, make extension for each item, and total.
CY (EV) = Cubic Yards, Excavated Volume
CY (CV) = Cubic Yards, Compacted Volume (Measured in Place) (P)=Planned Quantity Basis of Measurement
ITEMMNDOTAPPROX.UNITUNITUNITUNIT
ITEMNOTESUNITAMOUNTAMOUNTAMOUNTAMOUNT
NO.SPEC NO.QUANT.PRICEPRICEPRICEPRICE
35003,500.00$ 6000.56,000.50$ 1374513,745.00$ 5955.855,955.85$
1.00LUMP SUM
1
2021.501 MOBILIZATION
235.00CU YD 255,875.00$ 368,460.00$ 52.0512,231.75$ 104.9924,672.65$
22105.507
COMMON EXCAVATION (P) (EV)(1)
100400.00$ 150600.00$ 206824.00$ 157.26629.04$
4.00HOUR
32123.61
STREET SWEEPER
85.00TON 252,125.00$ 705,950.00$ 29.362,495.60$ 69.955,945.75$
42211.509
AGGREGATE BASE CLASS 5
1.00LUMP SUM 10001,000.00$ 800800.00$ 660660.00$ 477.25477.25$
52563.601
TRAFFIC CONTROL
500500.00$ 800800.00$ 12701,270.00$ 11501,150.00$
1.00LUMP SUM
62573.501
STABILIZED CONSTRUCTION EXIT
2.00EACH 200400.00$ 150300.00$ 193386.00$ 172.5345.00$
72573.502
STORM DRAIN INLET PROTECTION
53,250.00$ 1650.00$ 3.452,242.50$ 4.062,639.00$
650.00LIN FT
82573.503
SEDIMENT CONTROL LOG TYPE COMPOST
633.00CU YD 4025,320.00$ 3522,155.00$ 17.9711,375.01$ 55.7935,315.07$
92574.507
COMMON TOPSOIL BORROW
225.00POUND 2450.00$ 1225.00$ 0.58130.50$ 0.87195.75$
102574.508
FERTILIZER TYPE 3
25001,875.00$ 630472.50$ 45763,432.00$ 42783,208.50$
0.75acre
112575.508
SEEDING
250.00LB 61,500.00$ 71,750.00$ 4.181,045.00$ 3.72930.00$
12
SEEDING MIXTURE 25131
2575.508
26,000.00$ 1.654,950.00$ 1.775,310.00$ 0.942,820.00$
HYDRAULIC BONDED FIBER MATRIX3000.00LB
13
NOTES:
BID TOTAL:
$ 52,195.00$ 84,283.8655,147.36$
$ 53,113.00
(1) EXCESS MATERIAL SHALL BECOME THE PROPERTY OF THE CONTRACTOR