Resolution No. 2021-122 Street Imp Proj Final Plans/Bids
Resolution No. 2021-122
Ordering Final Plans, Specifications and Calling for Bids: 2021 Street Rehabilitation
Project No. ST2021-01
Whereas, the construction of certain improvements is deemed to be in the interest of the City of
Fridley (City) and the property owners affected thereby; and
Whereas, the City has prepared a Capital Investment Program to systematically reconstruct streets
in the City regularly to maintain roadway quality and performance; and
Whereas, the City’s Engineering Division has completed preparation of a feasibility report and
estimates of costs thereof for the improvements; and
Whereas, it is the intent of the City to fund a portion of the project costs through special assessments
to benefiting property owners in accordance with its Roadway Major Maintenance Policy; and
Whereas, pursuant to direction of the Fridley City Council, a report has been prepared by the City’s
Public Works Department with reference to the specific improvements; and
Whereas, Resolution No. 2021-111 adopted November 8, 2021 received the feasibility report and
called for a public hearing on the matter of the construction of certain improvements listed therein;
and
Whereas, a public hearing regarding said improvements was set for December 13, 2021; and
Whereas, pursuant to Minnesota Statute, proper notification of said public hearing was given; and
Whereas, pursuant to Minnesota Statute, the City Council heard all those persons that desired to
address the Council.
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves:
1. Such improvement is necessary, cost-effective, and feasible, as detailed in the feasibility report.
2. The improvements proposed in the feasibility report are hereby ordered to be effected and
completed as soon as reasonably possible, to-wit:
Street and utility improvements, including pavement reclamation, bituminous asphalt paving,
concrete curb replacement, water main and utility repairs including the street segments as follows:
th
59 Avenue from West Moore Lake Drive to Monroe Street;
Marigold Terrace from West Moore Lake Drive to Monroe Street;
thth
Monroe Street from 59 Avenue to 57Avenue;
Resolution No. 2021-122 Page 2
th
58 Avenue from West Moore Lake Drive to Madison Street;
thth
Madison Street from 58 Avenue to 57 Avenue;
th
Quincy Street from 58 Avenue to Carrie Lane;
Helene Place from Quincy Street to Madison Street;
th
Jackson Street from 58 Avenue to Carrie Lane;
Carrie Lane from Jackson Street to Quincy Street;
thth
57 Avenue from Quincy Street to 7 Street;
thth
Washington Street from 57 Place to 58 Avenue; and
thth
59 Avenue from Jefferson Street to 7 Street
3. That the work be incorporated in the 2021 Street Rehabilitation Project No. ST2021-01.
4. That the work be performed under this project may be performed under one or more contracts
as may be deemed advisable upon receipt of bids.
5. That the Director of Public Works, James P. Kosluchar, P.E. is hereby designated as the engineer
for this improvement. He shall oversee the preparation of plans, specifications and estimates of
costs thereof for making of such improvements.
6. That final plans, specifications, and estimates are prepared by the Public Works Engineering
Division and provided to the City Council as they are completed.
7. That the Engineering Division call for bids in order that project award and construction can be
considered.
th
Passed and adopted by the City Council of the City of Fridley this 13 day of December,
2021.
_______________________________________
Scott J. Lund – Mayor
Attest:
Melisa Moore – City Clerk