Resolution No. 2022-09 Ordering Final Plans/Bids for ST2022-01
Resolution No. 2022-09
Ordering Final Plans, Specifications and Calling for Bids: 2022 Street
Rehabilitation Project No. ST2022-01
Whereas, the construction of certain improvements is deemed to be in the interest of the City of
Fridley (City) and the property owners affected thereby; and
Whereas, the City has prepared a Capital Investment Program to systematically reconstruct streets
in the City regularly to maintain roadway quality and performance; and
Whereas, the City’s Engineering Division has completed preparation of a feasibility report and
estimates of costs thereof for the improvements; and
Whereas, it is the intent of the City to fund a portion of the project costs through special assessments
to benefiting property owners in accordance with its Roadway Major Maintenance Policy; and
Whereas, pursuant to direction of the Fridley City Council, a report has been prepared by the City’s
Public Works Department with reference to the specific improvements; and
Whereas, Resolution No. 2022-04 adopted January 3, 2022, received the feasibility report and called
for a public hearing on the matter of the construction of certain improvements listed therein; and
Whereas, a public hearing regarding said improvements was set for January 24, 2022; and
Whereas, pursuant to Minnesota Statute, proper notification of said public hearing was given; and
Whereas, pursuant to Minnesota Statute, the City Council heard all those persons that desired to
address the Council.
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves:
1. Such improvement is necessary, cost-effective, and feasible, as detailed in the feasibility report.
2. The improvements proposed in the feasibility report are hereby ordered to be effected and
completed as soon as reasonably possible, to-wit:
Street and utility improvements, including pavement reclamation, bituminous asphalt paving,
concrete curb replacement, water main and utility repairs including the street segments as follows:
Hartman Circle from East River Road to Hartman Circle East Leg;
st
71 Way from East River Road to Riverview Terrace;
st
Riverview Terrace from 71 Way to 71 ½ Way; and
West Bavarian Pass from North Innsbruck Drive to Arthur Street
Resolution No. 2022-09 Page 2
3. That the work be incorporated in the 2022 Street Rehabilitation Project No. ST2022-01.
4. That the work performed under this project may be performed under one or more contracts as
may be deemed advisable upon receipt of bids.
5. That the Director of Public Works, James P. Kosluchar, P.E., is hereby designated as the engineer
for this improvement. He shall oversee the preparation of plans, specifications and estimates of
costs thereof for the making of such improvements.
6. That final plans, specifications, and estimates are prepared by the Public Works Engineering
Division and provided to the City Council as they are completed.
7. That the Engineering Division call for bids in order that project award and construction can be
considered.
th
Passed and adopted by the City Council of the City of Fridley this 24 day of January, 2022.
_______________________________________
Scott J. Lund – Mayor
Attest:
Melisa Moore – City Clerk