Loading...
Resolution No. 2022-41 Award Street Rehab. Proj. Resolution No. 2022-41 Award of 2021 Street Rehabilitation Project No. ST2021-01 Whereas, the 2021 Street Rehabilitation Project No. ST2021-01 (Project) included as part of the City of Fridley’s (City) regular street maintenance programs under its Capital Investment Program and includes rehabilitation of specific street segments in the Lakeview neighborhood, along with associated roadway repairs, and other ancillary items; and Whereas, the City has prepared a Capital Investment Program to systematically reconstruct streets in the City regularly to maintain roadway quality and performance; and Whereas, Resolution No. 2021-111 adopted November 8, 2021 received the Project feasibility report and called for a public hearing on the matter of the construction of certain improvements listed therein; and Whereas, a public hearing regarding said improvements considered under the Project was set for December 13, 2021 and ten days mailed notice and two weeks published notice of the hearing was given; and Whereas, at said hearing on improvements, the Fridley City Council (Council) heard all those persons that desired to address the Council; and Whereas, Resolution No. 2021-122 adopted December 13, 2021 ordered final plans, specifications and calling for bids. Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves received bids per the attached bid tabulation (Exhibit A) and award the 2021 Street Rehabilitation Project No. ST2021-01 to the lowest responsive bidder, North Valley, Inc. of Nowthen, MN in the amount of $852,411.23. th Passed and adopted by the City Council of the City of Fridley this 9 day of May, 2022. _______________________________________ Scott J. Lund – Mayor Attest: Melissa Moore – City Clerk 202101StreetRehabilitationProject Owner:CityofFridley BidOpening:04/27/20229:00AM EngineerEstimateNorthValley,Inc.NorthwestGMHAsphaltCorporationParkConstructionCompanyT.A.Schifsky&Sons,Inc.BituminousRoadwaysInc. Line Item ItemDescriptionUnitQuantityUnitPriceExtensionUnitPriceExtensionUnitPriceExtensionUnitPriceExtensionUnitPriceExtensionUnitPriceExtensionUnitPriceExtension 1MobilizationLUMPSUM160,000.00$$60,000.00$19,316.22$19,316.22$42,286.00$42,286.00$41,700.00$41,700.00$52,850.00$52,850.00$35,000.00$35,000.00$30,000.00$30,000.00 2SawingBituminousPavement(FullDepth)LINFT379$3.00$1,137.00$2.52$955.08$3.50$1,326.50$2.50$947.50$3.05$1,155.95$3.00$1,137.00$1.85$701.15 3RemoveConcreteCurb&GutterLINFT18758.00$$15,000.00$7.21$13,518.75$9.59$17,981.25$7.60$14,250.00$10.08$18,900.00$7.00$13,125.00$7.90$14,812.50 4RemoveBituminousDrivewayPavementSQYD100$9.00$900.00$10.94$1,094.00$3.58$358.00$10.00$1,000.00$17.25$1,725.00$9.00$900.00$11.00$1,100.00 5RemoveConcreteDrivewayPavementSQYD10012.00$$1,200.00$12.76$1,276.00$7.16$716.00$18.90$1,890.00$19.40$1,940.00$11.00$1,100.00$17.00$1,700.00 6RemoveConcretePavementSQYD2512.00$$300.00$21.88$547.00$7.93$198.25$18.90$472.50$18.80$470.00$11.00$275.00$24.00$600.00 7CommonExcavation(P)(ExcessReclaim)CUYD319920.00$$63,980.00$19.99$63,948.01$21.14$67,626.86$12.60$40,307.40$15.00$47,985.00$2.00$6,398.00$29.50$94,370.50 8SubgradePreparation(P)ROADSTA88.36300.00$$26,508.00$164.20$14,508.71$102.90$9,092.24$330.00$29,158.80$159.75$14,115.51$373.00$32,958.28$280.00$24,740.80 9StreetSweeper(WithPickupBroom)HOUR25150.00$$3,750.00$166.33$4,158.25$150.00$3,750.00$145.00$3,625.00$132.60$3,315.00$165.00$4,125.00$173.00$4,325.00 10FullDepthReclamation(P)SQYD329001.25$$41,125.00$1.31$43,099.00$0.73$24,017.00$0.65$21,385.00$0.98$32,242.00$2.75$90,475.00$1.20$39,480.00 11BituminosJointSaw&SealLINFT72623.00$$21,786.00$3.18$23,093.16$3.30$23,964.60$3.25$23,601.50$3.00$21,786.00$3.17$23,020.54$3.00$21,786.00 12BituminousMaterialforTackCoatGAL19744.00$$7,896.00$3.22$6,356.28$3.75$7,402.50$0.01$19.74$2.40$4,737.60$0.01$19.74$3.00$5,922.00 13TypeSP9.5WearingCourseMix(3,C)TON271475.00$$203,550.00$88.82$241,057.48$89.26$242,251.64$91.80$249,145.20$91.55$248,466.70$91.00$246,974.00$104.50$283,613.00 14TypeSP12.5NonWearingCourseMix(3,C)TON361975.00$$271,425.00$83.17$300,992.23$84.01$304,032.19$87.90$318,110.10$87.30$315,938.70$87.00$314,853.00$96.15$347,966.85 153"BituminousDrivewayW/6"Class5AggregateSQYD10060.00$$6,000.00$48.13$4,813.00$64.16$6,416.00$54.00$5,400.00$44.95$4,495.00$62.00$6,200.00$43.00$4,300.00 16AdjustGateValveBox(Water)EACH9400.00$$3,600.00$241.45$2,173.05$605.00$5,445.00$900.00$8,100.00$519.65$4,676.85$550.00$4,950.00$380.00$3,420.00 17AdjustExistingFrameandRingCasting(Sanitary)EACH20600.00$$12,000.00$713.63$14,272.60$880.00$17,600.00$1,250.00$25,000.00$1,021.40$20,428.00$1,250.00$25,000.00$1,000.00$20,000.00 18AdjustExistingFrameandRingCasting(Storm)EACH4600.00$$2,400.00$311.21$1,244.84$880.00$3,520.00$1,250.00$5,000.00$252.20$1,008.80$850.00$3,400.00$345.00$1,380.00 194"ConcreteWalkSQFT22512.00$$2,700.00$5.37$1,208.25$7.70$1,732.50$7.20$1,620.00$5.75$1,293.75$6.30$1,417.50$20.00$4,500.00 20ConcreteCurb&GutterDesignB618LINFT187522.00$$41,250.00$28.17$52,818.75$27.50$51,562.50$27.95$52,406.25$28.70$53,812.50$27.30$51,187.50$28.50$53,437.50 216"ConcreteDrivewayPavementSQYD10080.00$$8,000.00$96.58$9,658.00$90.00$9,000.00$97.15$9,715.00$94.65$9,465.00$103.95$10,395.00$88.00$8,800.00 22Repair/ReplacePetFence&IrrigationSystemLUMPSUM13,000.00$$3,000.00$3,058.40$3,058.40$0.01$0.01$1,500.00$1,500.00$1,750.00$1,750.00$1,500.00$1,500.00$1,100.00$1,100.00 23TrafficControlLUMPSUM18,000.00$$8,000.00$4,292.49$4,292.49$4,795.00$4,795.00$4,250.00$4,250.00$4,440.00$4,440.00$14,000.00$14,000.00$4,550.00$4,550.00 24StormDrainInletProtectionEACH37150.00$$5,550.00$134.14$4,963.18$75.00$2,775.00$110.00$4,070.00$192.50$7,122.50$125.00$4,625.00$200.00$7,400.00 25CommonTopsoilBorrowCUYD7050.00$$3,500.00$60.80$4,256.00$22.00$1,540.00$21.20$1,484.00$20.40$1,428.00$60.00$4,200.00$61.00$4,270.00 26SoddingTypeLawnSQYD62515.00$$9,375.00$25.22$15,762.50$25.85$16,156.25$24.90$15,562.50$24.00$15,000.00$20.00$12,500.00$25.00$15,625.00 BidTotal:$823,932.00$852,441.23$865,545.29$879,720.49$890,547.86$909,735.56$999,900.30