Resolution No. 2023-04, Ordering Final Plans, Specifications and Calling for Bids for the 2023 Street Rehabilitation Project No. ST2023-01
Resolution No. 2023-04
Ordering Final Plans, Specifications and Calling for Bids for the 2023 Street
Rehabilitation Project No. ST2023-01
Whereas, the construction of certain improvements identified as the 2023 Street Rehabilitation
Project No. ST2023-01 (Improvements) is deemed to be in the interest of the City of Fridley
(City) and the property owners affected thereby; and
Whereas, the City has prepared a Capital Investment Program to systematically reconstruct
streets in the City regularly to maintain roadway quality and performance; and
Whereas, the City’s Engineering Division has completed preparation of a feasibility report and
estimates of costs thereof for the Improvements; and
Whereas, it is the intent of the City to fund a portion of the project costs through special
assessments to benefiting property owners in accordance with its Roadway Major Maintenance
Policy; and
Whereas, pursuant to direction of the Fridley City Council, a report has been prepared by the
City’s Public Works Department with reference to the Improvements; and
Whereas, Resolution No. 2022-151 adopted December 19, 2022, received the feasibility report
and called for a public hearing on the matter of the construction of the Improvements listed
therein; and
Whereas, a public hearing regarding said Improvements was set for January 9, 2023; and
Whereas, pursuant to Minnesota Statute, proper notification of said public hearing was given;
and
Whereas, at said Hearing on Improvements, the City Council heard all those persons that
desired to address the Council.
Now, therefore be it resolved, that the City Council of the City of Fridley hereby finds and
orders:
1. Such Improvements are necessary, cost-effective, and feasible, as detailed in the feasibility
report.
2. The Improvements proposed in the feasibility report are hereby ordered to be effected and
completed as soon as reasonably possible, to-wit:
Resolution No. 2023-04 Page 2
Street and utility improvements, including mill and overlay, pavement reclamation,
bituminous asphalt paving, concrete curb replacement, water main and utility repairs
including the street segments as follows:
rd
53 Avenue from Central Avenue (T.H. 65) to Cheri Lane
rd
Cheri Lane from 53 Avenue to Fillmore Street
rd
Fillmore Street from Cheri Lane to 53 Avenue
st
51 Way from East River Road (County Road 1) to Industrial Boulevard
st
East River Road East from 51 Way to North Terminus Service Drive
East River Road West from South Terminus to North Terminus Service Drive
rd
Stinson Boulevard from 73 Avenue to Osborne Road (County Road I)
3. That the Improvements be incorporated in the 2023 Street Rehabilitation Project No.
ST2023-01 (Project).
4. That the work effecting the Improvements be performed under this project may be
performed under one or more contracts as may be deemed advisable upon receipt of bids.
5. That the Director of Public Works, James P. Kosluchar, P.E. is hereby designated as the
engineer for the Improvements and shall oversee the preparation of plans, specifications
and estimates of costs thereof for making of the Improvements.
6. That final plans, specifications, and estimates are prepared by the Public Works Engineering
Division and provided to the City Council as they are completed.
7. That the Engineering Division call for bids in order that Project award(s) and construction
can be considered.
th
Passed and adopted by the City Council of the City of Fridley this 9 day of January, 2023.
_______________________________________
Scott J. Lund – Mayor
Attest:
Melissa Moore – City Clerk