Loading...
01-05-2023 Reg. Mtg Housing & Redevelopment Regular Meeting January 05, 2023 7:00 PM Fridley City Hall, 7071 University Avenue N.E. Agenda Call to Order Roll Call Action Items 1.Approval of Expenditures from November and December, 2022 2.Approval of the Minutes from the HRA Meeting of November 3, 2022 3.Resolution No. 2023-01 Designating Official Depositories for the Year 2023 4.Designation of an Official Newspaper for 2023 5.Approval of S-2 Zoning, Master Plan -Moon Plaza Redevelopment Informational Items 6.Housing Program Update Adjournment 2 Jufn!2/ AGENDA REPORT Meeting Date:January 5, 2023 Meeting Type:Housing & Redevelopment Authority Submitted By:Paul Bolin, Assistant Executive Director Title Approval of Expenditures Background Recommendation Staff recommend the approval of the expenditures for the period November 1 through December 31, 2022. Attachments and Other Resources Check Reports for November and December, 2022 Vision Statement We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses. 3 Jufn!2/ 4 Jufn!2/ 5 Jufn!2/ 6 Jufn!2/ 7 Jufn!3/ AGENDA REPORT Meeting Date:January 5, 2023 Meeting Type:Housing & Redevelopment Authority Submitted By:Paul Bolin, Assistant Executive Director Title Approval of the Minutes from the HRA Meeting of November 3, 2022 Background Recommendation Staff recommend the HRA approve the minutes from the HRA meeting of November 3, 2022. Attachments and Other Resources HRA Minutes November 3, 2022 Vision Statement We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses. 8 Jufn!3/ HOUSING AND REDEVELOPMENT AUTHORITY November 3,2022 7:00 PM Fridley Civic Campus, 7071 University Avenue N.E. MINUTES CALL TO ORDER Vice Chairperson Mulrooneycalled the Housing and Redevelopment Authority meeting to order at 7:00 p.m. PRESENT Gordon Backlund Troy Brueggemeier Rachel Schwankl Kyle Mulrooney Joe Starks, Finance Director Nancy Abts, Associate Planner Vickie Johnson, Development Consultant ACTION ITEMS 1. Approval of Expenditures Motionby Commissioner Backlundto approve the expendituresfrom September and October 2022. Seconded by Commissioner Brueggemeier. UPON A VOICE VOTE, ALL VOTING AYE, VICE CHAIR MULROONEYDECLARED THE MOTION CARRIED UNANIMOUSLY. 2.ApprovalSeptember 1,2022, Meeting Minutes Motionby Commissioner Brueggemeierto approve the meeting minutesof September 1,2022 as presented. Seconded by Commissioner Backlund. UPON A VOICE VOTE, ALL VOTING AYE, VICE CHAIR MULROONEYDECLARED THE MOTION CARRIED UNANIMOUSLY. 3.Approval of 2023 Budget for the Housing and Redevelopment Authority Joe Starks, Finance Director, reviewed the proposed budget process, general background information on the proposed budget, and details of the proposed 2023 budget. He highlighted significant modifiations to the proposed budgetrevenuesincluding an increase of $34,000 to the property tax levy, $100,000 increase in the sale of miscelanious propoerty, and $120,000 decrease in miscelanious revenues. He 9 Jufn!3/ Housing and Redevelopment Authority 11/3/2022 Minutes Page 2 highlighted signficant modifications to the proposed budget expenditures including that the HRA Assistant Executive Director will be budgeted for within the City General Fund/Planning and charged back to the HRA, and a five percent increase in professional and contractual services due to inflation. He provided additional details on other changes incorporated into the proposed budget and noted that staff recommends approval of the budget as presented. The Commission referenced the recommendations from staff and asked for details on approving those items. Mr. Starks replied that those changes have been incorporated into the proposed budget and therefore if the HRA approves of those changes, the budget could be approved. He confirmed that the larger items have been included in the budget as placeholders, but would still come back to the HRA for consideration and approval. He clarified that the items referenced by a member of the HRA are not his recommendations but is instead inforation from the TIF Plan that was approved by the HRA last November. The consensus of the Commission was to have an annual review of the TIF Plan at a future meeting. MOTION by Commissioner Schwankl to approve the 2023 HRA Budget. Seconded by Commissioner Backlund. UPON A VOICE VOTE, ALL VOTING AYE, VICE CHAIR MULROONEY DECLARED THE MOTION CARRIED. 4. Approval of 2023 Housing Grant Programs Nancy Abts provided an overview of the housing grant programs throughout 2022, noting that they are looking to make things fairly consistent for 2023. She reviewed proposed changes to the different grant programs and highlighted the different methods that would be used to promote the grant programs. The Commission asked for clarification on the changes to the income allowance for the paint program and commented how great it is to see these programs implemented and the positive impact these projects have on the community. The Commission also agreed that applications with more complete information should be prioritized. Ms. Abts explained that the income guidelines are updated to reflect the most up to date information on those guidelines. MOTION by Commissioner Brueggemeier to approve the Housing Grant Programs for 2023. Seconded by Commissioner Backlund. UPON A VOICE VOTE, ALL VOTING AYE, VICE CHAIR MULROONEY DECLARED THE MOTION CARRIED UNANIMOUSLY. 5. Insulation Rebate Pilot Program Extension Ms. Abts stated that staff would recommend extension of the pilot program which began in 2022 as the program has been well received, providing additional details. MOTION by Commissioner Backlund to approve an extension to the pilot grant program through 2023. Seconded by Commissioner Schwankl. : Jufn!3/ Housing and Redevelopment Authority 11/3/2022 Minutes Page 3 UPON A VOICE VOTE, ALL VOTING AYE, VICE CHAIR MULROONEY DECLARED THE MOTION CARRIED UNANIMOUSLY. 6. Approval of 2023 Meeting Dates for the Housing and Redevelopment Authority The Commission reviewed the proposed 2023 meeting dates. MOTION by Commissioner Backlund to approve the 2023 meeting dates for the HRA. Seconded by Commissioner Brueggemeier. UPON A VOICE VOTE, ALL VOTING AYE, VICE CHAIR MULROONEY DECLARED THE MOTION CARRIED UNANIMOUSLY. INFORMATIONAL ITEMS 7. Update on Housing Programs Ms. Abts provided an update on the monthly and year to date progress of the different housing programs offered by the HRA. A member of the Commission asked for a comparison on the activity from the previous year. Ms. Abts stated that staff can follow up and provide that information. ADJOURNMENT MOTION by Commissioner Backlund to adjourn the meeting. Seconded by Commissioner Brueggemeier. UPON A VOICE VOTE, ALL VOTING AYE, VICE CHAIR MULROONEY DECLARED THE MOTION CARRIED AND THE MEETING ADJOURNED AT 7:32 P.M. Respectfully submitted, Melissa Moore City Clerk 21 Jufn!4/ AGENDA REPORT Meeting Date:January 5, 2023 Meeting Type:Housing & Redevelopment Authority Submitted By:Paul Bolin, Assistant Executive Director Title Resolution No. 2023-01 Designating Official Depositories for the Year 2023 Background Attached is a resolution appointing Wells Fargo Bank Minnesota N.A. as the Housing & Redevelopment The service the HRA receives from Wells Fargo has been first-rate. Wells Fargo is responsive to not only our requests for information, but also other banking issues that may arise. In today's world of increasing demands for electronic banking, Wells Fargo Bank provides a one-stop- and efficient, as our banking needs are quite complex. collateralized. This assures deposits are safe and not subject to loss if the bank were to fail. This daily monitoring is critical, since the Authority can experience large swings in cash balances at different points throughout the year. Staff recommends a motion adopting a resolution designating official depositories for the Housing & Redevelopment Authority for 2023. Recommendation Staff recommend the approval of HRA Resolution No. 2023-01. Attachments and Other Resources HRA Resolution No. 2023-01 Vision Statement We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses. 22 Jufn!4/ Resolution No. 2023-01 Designating an Official Depository for the Housing & Redevelopment Authority Whereas, I, Joe Starks, do hereby certify that I am the Finance Director-Treasurer of the Housing & Redevelopment Authority in and for the City of Fridley, a corporation organized under the laws of the State of Minnesota. I further certify that at a meeting of said corporation duly and properly th called and held on the 5 day of January 2023, the following resolution was passed; that a quorum was present at said meeting; and that said resolution is set forth in the minutes of the meeting and has not been rescinded or modified. Now, therefore, be it resolved that Wells Fargo Bank Minnesota N.A. is hereby designated as a depository for the funds of this corporation. Be it further resolved that checks, drafts or other withdrawal orders issued against the funds of this corporation on deposit with said bank shall be signed by the following two individuals: Walter T. Wysopal, Executive Director Joe Starks, Finance Director and that said bank is hereby fully authorized to pay and charge to the account of this corporation any checks, drafts, or other withdrawal orders. Be it further resolved that Wells Fargo Banks as a designated depository of the corporation is hereby requested, authorized and directed to honor checks, drafts or other orders for the payment of money drawn in this corporation's name, including those drawn to the individual order of any person or persons whose name or names appear thereon as signer or signers thereof, when bearing or purporting to bear the facsimile signatures of the following two individuals: Walter T. Wysopal, Executive Director Joe Starks, Finance Director and Wells Fargo Banks shall be entitled to honor and to charge this corporation for all such checks, drafts or other orders, regardless of by whom or by what means the facsimile signature or signatures thereon may have been affixed thereto, if such facsimile signature or signatures resemble the facsimile specimens duly certified to or filed with Wells Fargo Banks by the City Clerk or other officer of this corporation. Be it further resolved that any and all resolutions heretofore adopted by the Housing & Redevelopment Authority of the corporation and certified to as governing the operation of this corporation's account(s) with it, be and are hereby continued in full force and effect, except as the same may be supplemented or modified by the foregoing part of this resolution. 23 Jufn!4/ Resolution No. 20323 01 Page 2 Be it further resolved that all transactions, if any relating to deposits, withdrawals, re-discounts and borrowings by or on behalf of the corporation with said bank prior to the adoption of this resolution be, and the same hereby are, in all things ratified, approved and confirmed. Be it further resolved that any bank or savings and loan may be used as depositories for investment purposes so long as the investments comply with authorized investments as set forth in Minnesota Statutes. Be it further resolved that the signatures of the following two named City/HRA employees are required for withdrawal of Housing & Redevelopment Authority investment funds from savings and loan associations: Walter T. Wysopal, Executive Director _______________________________________________ Joe Starks, Finance Director _______________________________________________ Be it further resolved that any brokerage firm may be used as a vendor for investment purposes so long as the investments comply with the authorized investments as set forth in Minnesota Statutes. I further certify that the Board of this corporation has, and at the time of adoption of said resolution, had full power and lawful authority to adopt the foregoing resolutions and to confer the powers therein granted to the persons named who have full power and lawful authority to exercise the same. Passed and adopted by the Housing & Redevelopment Authority in and for the City of th Fridley this 5 day of January, 2023. _______________________________________________ Elizabeth Showalter - Chairperson Attest: _________________________________________________ Walter T. Wysopal - Executive Director 24 Jufn!5/ AGENDA REPORT Meeting Date:January 5, 2023 Meeting Type:Housing & Redevelopment Authority Submitted By:Paul Bolin, Assistant Executive Director Title Designation of an Official Newspaper for 2023 Background The Fridley City Charter Section 12.01 requires the designation of an official newspaper for the Fridley Housing and Redevelopment Authority. The official newspaper is used for publishing public hearings and other legal notices. Recommendation Staff recommend the approval of HRA Resolution No. 2023-02, designating the Minneapolis Star Tribune as the official legal newspaper of the Fridley Housing and Redevelopment Authority for the year 2023. Attachments and Other Resources HRA Resolution No. 2023-02 Vision Statement We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses. 25 Jufn!5/ Resolution No. 2023 - 02 Designating an Official Newspaper for the Year 2023 Whereas, the Charter of the City of Fridley requires in Section 12.01 thereof that the Fridley Housing and Redevelopment Authority, annually designate an official newspaper for the Housing and Redevelopment Authority. Now, therefore be it resolved, that the Minneapolis Star Tribun e is designated as the official legal newspaper for the City of Fridley for the year 2023 for all publications required to be published therein. Passed and adopted by the Housing and Redevelopment Authority in and for the City of th Fridley this 5 day of January, 2023. _______________________________________________ Elizabeth Showalter Chairperson Attest: __________________________________________________ Walter T. Wysopal Executive Director 26 Jufn!6/ AGENDA REPORT Meeting Date:January 5, 2023 Meeting Type:Housing & Redevelopment Authority Submitted By:Stacy Stromberg, Planning Manager Scott Hickok, Community Development Director Title Review S-2, Rezoning Request, ZOA #22-000001 for 6257 University Avenue N.E. (Moon Plaza) petitioned by Roers Companies Background See attached report to the Planning Commission. Recommendation Staff recommendsthat the HRAreview the Rezoning Request for the property at 6257 University Avenue N.E. and make a recommendation of approval of the rezoning to the City Council. Attachments and Other Resources Roers-Moon Plaza Rezoning Report Vision Statement We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses. 27 Jufn!6/ LandUseApplicationSummary Item:CPA#22-000001, ZOA #22-000001 Meeting Date:December 21, 2022,postponed PS #22-000002January 4, 2023 – Special Mtg. GENERAL INFORMATIONSPECIAL INFORMATION Petitioner: Transportation: Roers CompaniesProperty is accessed from the University Avenue Service Drive Two Carlson Pkwy N, Suite 400 Plymouth, MN 55447 Physical Characteristics: Requested Action:Building, parking, with very little landscaping Comprehensive Plan Amendment, Rezoning Summary of Request: and Plat The petitioner, Andy Bollig with Roers Location:Companies has submittedthree land use 6257 University Avenueapplications to allow for the redevelopment of the Moon Plaza, located at 6257 University Existing Zoning: Avenue. The redevelopment that is proposed is C-3, General Shopping to allow for the construction of a multi-family Size: housing development, located at 6257 University 158,961sq. ft. 3.65acres Avenue. Those items are: 1. Comprehensive Plan Existing Land Use: Amendment from a Commercial Use to a Commercial – Moon Plaza strip mall Residential Use 2. Rezoning from C-3, General Surrounding Land Use & Zoning: Shopping to S-2, Redevelopment District 3. Re- N:Commercial & C-3 Plat to combine the two existing lots to create E:Commercialand Multi-Family & C-3 and R-3 one lotfor the development S:St. Williams Church& R-3 Staff Recommendation: W:University Avenue & Right-of-Way City staff recommends approval of the requested Comprehensive Plan Conformance: land use applications, subject to stipulations. Property is designated as Commercial Building and Zoning History: 1956 – Auditor Sub. recorded. 1963 – Building issued. 1965 – Building construction completed. Several permits have been issued over the years to allow interior remodels. Aerial of the Property Legal Description of Property: City Council Action/60 Day Action Date: See attached certificate of survey City Council – January 9, 2023 Public Utilities: 60 Day Date – January 16, 2023 Buildingis connectedand adequate services Staff Report Prepared by Stacy Strombergand are available for the new use Nancy Abts 1 28 Jufn!6/ Written Report – The Request The petitioner, Andy Bollig, Developer with Roers Companies is requesting three land use items to allow for the redevelopment of the Moon Plaza property, located at 6257University Avenue N.E. The redevelopment will allow for the construction of a 169-unit affordable multi-family rental housing development. The land use items are: 1.Comprehensive Plan Amendment – The 2040 Comprehensive Plan’s designates the future land use of the property as Commercial. Thepetitioner is requesting an amendment to change the land use designationof the siteto Multi-Family. 2.Rezoning Request to S-2, and SubsequentMaster Plan – Thesubject property is currently zoned C-3, General Shopping and the petitioner is requesting to have the property rezoned to S-2, Redevelopment District. When a property is zoned S-2, Redevelopment District, a master plan needs to be approved for the site. 3.Plat – To accommodate the redevelopment of the property, the petitioner would like to replat the property to create one new lot. Site Description and History The Moon Plaza Shopping Center was constructed between1963-1965. Over the years it has been home to wide variety of retail and office users including a dry cleaner, a beauty salon and barber shop, small grocery stores, military recruiting offices, a café, and many others. A photo from 1975 shows there oncewas a small a small photo mat building in the parking lot. The property sits onthe University st Avenue Service Drive, north of 61 Avenue. It is bordered by St. Williams Church to the south, small commercial users to the north, and Norwood Square, an affordable senior independent living community to the east. The property has been a source of criticism for many years, even dating back to 1985. At that time, the City Manager asked the Planning Coordinator to evaluate the vitality of the outdated, run-down strip center. The memo notes that the building’s lack of architectural character, sufficient tenant floor space, landscaping, 2 29 Jufn!6/ attractive lighting, and other contemporary amenities commercial tenants are looking forhindered itsability to attract quality tenants. Over the last two Comprehensive Planning processes, staff has heard from many people in the community, who want to see something done with the outdated Center. Concerns raised were likethat of the Holly Center: the poor condition of the structure and itsfaçade, an overabundance of parking, and lack of landscaping. As a result of community concerns and the overall condition of the property, ithas been placed in a redevelopment district in the City’s Comprehensive Plan for over 20 years. The property has been under the same ownership since the early 1990s. The owner has generally been responsive and willing to work with the City as issues have come up; however, with no major reinvestment in the building and property over the last 40 years, it has become very tired, and is in desperate need of redevelopment. Roers Companies started discussions with the property owner in early 2022 topotentiallypurchase the property. Roers has a letter of intent to purchase the property contingent upon these land use items being approved. Proposed Project The petitioner is proposing to redevelop the Moon Plaza property by constructing anew 169-unit affordable multi-family housing development. There will be a mix of 1 bedroom, 2 bedroom and 3- bedroom units, with rents affordable to households earning 60 percent of area median income (AMI). There will be 265 parking stalls on site, with 167 of those underground. The building will be 5- stories along the east side, and the north and south sides of the building will step down to 4-stories. Common area amenities will include a community room, outdoor patio, resident storage areas, a dog wash station, a game room, a playground, a dog run, and a seating and gazebo area. As described by the petitioner, “theMoon Plaza Multifamily Redevelopmentis a transformation of an existing aged retail strip center into a new affordable housing development. The project will create a high-qualitydevelopment that enables lower than market rentsmaking housing moreaccessible. It will target an underserved population of renters without sacrificing finish levels and amenities. The rent levels will be set to serve families and individuals who earn 60% of the area median income (AMI), which is an 3 2: Jufn!6/ annual income of $56,320 for a family of 2, and $70,380 for a family of 4. Sixty percent AMI translates to monthly rents for this project being approximately $1,242for a one-bedroom, $1,489 for a two-bedroom, and$1,717 for a 3-bedroom. Applicants will need to submit income eligibility rd that is verified by a 3party before they can qualify to live in this development.” The chart below shows the 2022 income limitsfor the Minneapolis-St. Paul Metropolitan Area, at 60% to 100% of AMI, based on household (HH) size, put together by the US Department of Housing and Urban Development (HUD). The text in red, “65%” is Fridley’s median incomefor 2022. Income1 Person2 Person3 Person4 Person LimitHHHHHHHH 100%$82,740$94,560$106,390$118,200 80%$62,600$71,550$80,500$89,400 65%$53,536$61,184$68,832$76,480 60%$49,280$56,320$63,360$70,380 Comprehensive Plan Analysis The 2040 Comprehensive Plan’s Future Land Use Map designates the site as “Commercial.” Commercial Land Use is defined as, “Lots or parcels containing retail services, offices, restaurants, and uses that are generally privately owned and operated for profit.” The petitionerrequests the site be designated “Multi-Family Residential,” which applies to “Lots or parcels containing multiple dwelling units, such as…apartment complexes, from 9-40 units/acre...” The site is located within an identified RedevelopmentArea, and the Comprehensive Plan notes, “Some specific redevelopment areas have higher density…”. With 169 proposed housing units across a 3.66-acresite, the proposed density is 46 2030 Comp Plan units per acre. The site is near the proposed “F Line” Bus Rapid Transit (BRT) stops at st Avenue, 61 and Mississippi Street, where higher density development may be warranted. Density at other TOD locations is approximately: 35 units per acreat The Cielo Apartments, 32 units per acre at Fridley Station Village (Altair, Aura, & Ursa Apartments), and 36 units per acre at Axle Apartments. During the 2030 and 2040 Comprehensive Planning process, City staff continued to hear from Fridley citizens that they’d like to see something done with the Moon Plaza property. The concerns 4 31 Jufn!6/ raised were related to the condition of the structure, the façade, the abundance of parking, and lack of landscaping. The 2030 Comprehensive Plan (adopted in 2009) and the 2040 Comprehensive Plan (adopted in 2021) put the subject property in one of theCity’s identified redevelopment districts. 2040 Comp Plan The following amendments to the 2040 plan, shown in red, are proposed: The 2040 Comprehensive Plan guides the future land use for the subject property and the parcels to the north and east as commercial. The petitioner’s Comprehensive Plan amendment request is to change the land use designation of the subject property to Multi-Family and the Rezoning request is to change the zoning from C-3, General Shopping toS-2, Redevelopment District. The parcels to the north will remain guided in the Comprehensive Plan as commercial and zoned C-3, General Shopping. The City encouraged the developer to consider incorporating retail and commercial into the building design, however the current market is showing that this mix isn’t always viable, and developers are struggling to find commercial tenants to occupy that space. The Roers project at Holly Center did incorporate a commercial parcel, and to date Roers hasn’t been able to lease it. Therefore, the proposed project only includes residential uses. In addition to future land use guidance, the Housing Chapter of the Comprehensive Planoffers some perspective on the project. The Housing Chapter(p. 67) 5 32 Jufn!6/ comments on the concentration of subsidized multi-family housing within a small area of the city. Historically, this concentration arose due to the proximity of other services (e.g., library, bus transit, pharmacy, etc.) in the area. As the petitioner establishes via the submitted Housing Market Study, a similar justification exists for locating this project on the proposed site. Additionally, the Metropolitan Council has allocated needed affordable housing units to Fridley. This allocation is addressed in the Housing Chapter. By 2030, the Met Council anticipates Fridley will need at least 122 housing units which are affordable to residents earning 51 to 80 percent of AMI. The petitioner proposes to build 169 units at this affordability level. In the housing study, the petitioner establishes significant demand for housing affordable to households earning 60 percent of AMI or less, more than the 122 units anticipated in the forecast. Moreover, the petitioner’s housing study addresses providing housing to existing area residents, while the Met Council’s allocation of need is calculated based on anticipated regional population growth. Therefore, proposing to create 169 units of housing affordable at 60 percent AMI is consistent with the Comprehensive Plan. Lastly, Amendments to the City’s Comprehensive Plan need to be approved by the City Council and the Metropolitan Council. Jurisdictions that may be affected by the change—in this instance, Fridley Public Schools, Mississippi WMO, & MnDOT—are given an opportunity to review and comment on the amendment prior to the Met Council’s action. Rezoning Analysis The City’s zoning ordinance and official zoning map are the mechanisms that help the City achieve the vision laid out in the Comprehensive Plan. The law gives the City the authority to “rezone” property from one designated use to another, so long as the zoning meets the intent of the Comprehensive Plan. Therefore, rezoning may be contingent on the Comprehensive Plan Amendment. Rezoning the property to S-2, Redevelopment District to allow construction of the multi-family housing development will revitalize the property, which is what the City was hoping to achieve through the last two Comprehensive Planning processes. This redevelopment will also be consistent with the zoning and uses on the surrounding properties. If the rezoning and subsequent master plan are approved by the City Council, any modification of the site plan would need to go back to the City Council for review and approval. Review and Recommendation of the Rezoning to S-2, Redevelopment District is also required by the HRA to the City Council before the master plan can be approved. The HRA will review the land use requests at their January 5, 2023, meeting. 6 33 Jufn!6/ Plat Analysis To accommodate the redevelopment of the subject property, the petitioner would like to replat the property to create one lot. Platting of the property will also allow the dedication of the west 30 ft. for right-of-way. Lot 1, Block 1 shown in blue will be 158, 961 sq. ft. or 3.65 acres in size, and the right-of-way dedication shown in yellow is 15,750 sq. ft. or .36 acres. Site Plan Analysis The proposed project is a 169-unit affordable housing building that will havea mix of 1 bedroom, 2 bedrooms, and 3 bedrooms. Each unit will include a washer and dryer, stainless steel applies, quartz counter tops, and 9 ft. ceilings. Common area amenities include a community room, a game room, resident storages areas, an outdoorpatio with a dog run, and tot lot, and sidewalk and connections to existing sidewalk and train systems. Parking – The R-3, Multi-Family zoning code requires 339 parking stalls for this project, based on the breakdown of types of units, which is 1.57 stalls per unit. The petitioner is proposing 265stalls, 167of those will be underground and 98 will be surface stalls, which is deficient to the code requirements by 74stalls. Though the parking doesn’t meet the R-3, Multi-Family code regulations, it is consistent with the parking per unit ratios the City has approved for other recently constructed multi- family housing projects. The Axle Apartments and the Train Station Village Apartments have a parking ratio at 1.57 stalls per unitand have been operating without any on-street parking complaints. The petitioner notes that because residents of this building will be incomerestricted at60%AMI, the renters will primarily be families, that may or may not have a car, and will likelyutilize the public 7 34 Jufn!6/ transportation opportunities that are within proximity to the site. A new 8 ft. trail will be constructed as part of the project to connect to the existing sidewalk on St. Williams property to the south, which will then cross the old Citgo site, which the City is currently working to create a suburban micro-mobility hub that will tie into the existing Route 10 bus line stop, and future F Line BRT bus station. Lot Coverage – After the replat and right-of-way dedication, the property will be 158,961 in size. Currently 87% of the site is covered with impervious area, and after the redevelopment 56% of the property will covered with impervious area. The Fire Code requires a 26 ft. drive-aisle around the proposed new building for fire protection. The new impervious coverage figure considers the use of a turn reinforcement mat along the north, west, and east sides of the property to accommodate the requirement by the Fire Code. If this mat doesn’t meet the intent or requirements of the Fire Marshal, that 26 ft. drive aisle with need to be constructed of asphalt or concrete. Access – The underground parking entrance and access to the surface parking lot will be from the University Avenue Service Drive. As proposed the site will have five access points, two for the fire lane, two for the surface parking lot and one for underground parking. Height – The proposed building will be 5-stories along the east elevation, with a height of 51 feet 8 inches. The north and south sides of the building will step down to 4-stories and will be 42 feet 7 ½ inches in height. Both the R-3, Multi-Family and the C-3, General Shopping zoning codes allow a maximum height of 65 ft. Building Orientation – Instead of placing the building close to the Service Drive, the petitioner has designed this project as a backwards “C”, which pushes the building closer to the eastern property line. The shared common space and parking area on the west side, in front of the building and visible from University Avenue and the Service Drive. This building orientation was preferred by staff, as it works better for a mid-block development and was favored by the Public Safety Department for safety and security. Setbacks and Landscaping – The building in this location complies with the setback requirements of the R-3, Multi-Family zoning code, and will provide a nice landscape buffer between it and the Northwood Square building to the east. A code complaint landscape plan will be required at time of building permit application. Engineering Analysis provided by Brandon Brodhag, Assistant City Engineer Engineering staff has reviewed the submitted Site Plan, Stormwater Management Plan and Traffic Analysis Report for the proposed development. The project is located within the MWMO (Mississippi Watershed Management Organization) watershed. The City of Fridley is the permitting authority for stormwater management, and the LGU (Local Governing Unit) for administration of MWMO standards within this portion of Fridley. Permits for the construction of this project will be issued by the City of Fridley. 8 35 Jufn!6/ Site Plan/Utility Plan Review – The site plan shows existing concrete sidewalk on the west side of the property will be removed during construction and the City would like the sidewalk replaced with a shared-use bituminous trail. The proposed Utility Plan shows the locations of the two infiltration storm vaults and utility services. Based on the review with the Fridley Utility Department, the developer will be required to locate all existing utilities for final design. For the infiltration storm vaults, the developer shall consider having one access point at each run of the chamber. The developer should verify capacity at the sanitary sewer tie-in location and downstream at University Avenue Service Drive. Stormwater Management Plan Review – Based on the stormwater management plan, the proposed project meets the rate control requirement for the 2-, 10- and 100-year storm events. This means the rate of runoff for these specific events does not increase because of the development. The Developer is meeting this requirement by constructing an infiltration storm vault as part of the project. MWMO also requires the abstraction by infiltration of 1.1 inches of runoff from the proposed development to reduce the volume of runoff caused by the development. Based on the stormwater management plan, the project meets the abstraction requirement. Should this project go to construction, the Developer will need to verify the following information and revised the stormwater management plan, if necessary: The included stormwater model in the stormwater management plans assumes Type A soils in this area based on county soil maps. The soils in Fridley are highly variable, and if the soils are not Type A soils, the project will not meet either the rate control or abstraction requirement. The Developer will need to provide further evidence that the assumptions of the model are correct. The infiltration storm vaults will need to be designed to provide the required abstraction, verified during construction, and protected from construction activity as described in MWMO Standards Section 3.1.3 – 4. The Developer shall submit a maintenance plan and maintenance agreement for these infiltration storm vaults. For the infiltration areas to work correctly, there must be 3 feet of separation between the bottom of the basin and the top of the water table. The Developer will need to provide evidence that this will be met, and no subject to seasonal variations in the water table also described in MWMO Standards Section 3.1.3 – 4 . Housing Study Analysis The applicant provided a housing market study prepared by Novogradac, a real estate consulting firm from Dallas, Texas. The report’s effective date is from October 2022. The report defined a Market Area for analysis and utilized socio-economic and demographic characteristics to estimate demand for this new multi-family housing development. Overall, the report established a market need for at least 175 apartments affordable to households earning 60 percent of AMI. (Due to changes to the project from the time the report was commissioned, this is more than the number of units currently being proposed.) Due to the number of cost-burdened 9 36 Jufn!6/ households within the Primary Market Area who pay more than 35 percent of their income for housing, the report predicts demandfor and rapid uptake of the new apartments. The report notes as weaknesses the relatively smaller size of the units, compared to competitor properties. The proposed units are found to be 9.5 to 14 percent smaller than other average units; however, the report finds they are within the range of acceptable sizes. Additionally, the report finds that higher quality construction and building components will be an asset to offset any size-related drawbacks. Comparable properties have vacancy rates from zero to 6 percent, and on average this figure is quite low and indicates housing demand in the market. Additionally, several comparable properties—including the recently-completed Low Income Housing Tax Credit (LIHTC) property “Ursa” in Fridley—maintain waiting lists for their units. Employment characteristics in the Primary Market Area—including concentrations in healthcare and manufacturing—should allow residents’ income to remain relatively stable in the faceof an economic downturn. Beyond local demand, at least 15 percent of residents are estimated to come from outside the Primary Market Area. The report notes that Fridley experiences a significant in-migration of workers who travel to Fridley to work but live outside the community. Traffic Study Analysisprovided by Brandon Brodhag, Assistant City Engineer The petitioner hired Swing Traffic Solutions to complete a Traffic Analysis for the proposed apartment project. They analyzed the connections from the University Avenue Service Road to the th surrounding roadways at the intersections of Trunk Highway 47 & Mississippi Street, 5Street & stst Mississippi Street, Trunk Highway 47 & 61Avenue, and University Avenue Service Road & 61 Avenue. The proposed development will generate 53 trips (30 entering and 23 exiting) during the morning traffic peaking and will generate 48 trips (21 entering and 27 exiting) during the evening traffic peak hour and 749 daily trips. The traffic numbers are based off the 165-unit mid-rise multi-family building. Each intersection is given a letter designation from “A” representing the best operation conditions to “F”, representing the worse. Generally, Level of Service “D” represents the threshold for acceptable overall intersection operation conditions during a peak hour. In the No Build Scenario 10 37 Jufn!6/ and Build Scenario, for each of the intersections listed above that were analyzed, the letter grades ranged from “A” to “C” for each of the intersections. These letter grades stayed the same between the No Build/Build and a.m./p.m. scenarios. The analyzed intersections are and will continue to operate well, according to the study. The traffic analysis results with the proposed project indicate acceptable operations with minimal vehicle delay and back-ups at adjacent intersections. Staff worked with the developer to review the traffic impacts for the possibility of converting the University Avenue Service Drive to a one-way, and the results were that the one-way conversion provides very little benefit. The traffic analysis includes the closure of the University Avenue Service Drive between Fourmies Avenue and Mississippi Street. Staff asked the developer to review the trip generation if Moon Plaza were to redevelop to a modern commercial center, and the results were that the modern commercial center would have approximately twice the number of trips per day compared to the proposed apartments. Staff Recommendation Staff recommends the Planning Commission hold a public hearing for CPA #22-000001, ZOA #22- 000001, and PS #22-000001. Staff recommends approval of the Comprehensive Plan Amendment CPA #22-000001 to change the future land use guidance for the site, contingent on the following: Approval of the Rezoning of the site Metropolitan Council approval of the Comprehensive Plan Amendment Staff recommends approval of the Rezoning to S-2, Redevelopment District, ZOA #22-000001 and the subsequent master plan, with stipulations. Meets the goals highlighted in the 2030 and 2040 Comprehensive Plan. City Staff recommends approval of preliminary plat, PS #22-000001, with a stipulation. Stipulations Staff recommends the following stipulations on the Comprehensive Plan Amendment, CPA #22- 000001: 1. The City Council’s approval of the Comprehensive Plan Amendment is contingent upon the Metropolitan Council’s approval of said amendment. Staff recommends the following stipulations on Rezoning and Master Plan, ZOA #22-000001. 1. The property shall be developed in accordance with the site plan submitted for “Roers – 6257 University Apartments”, by Kaas Wilson, dated 12/15/2022. 2. The exterior building elevations shall be developed in accordance with the architectural exterior elevation’s sheets submitted by Kaas Wilson Architects. 3. The petitioner shall meet all requirements set forth by: a. The Building Code b. The Fire Code 11 38 Jufn!6/ c. The City’s Engineering department – related to grading, drainage, storm pond maintenance agreement, utilities, and utility connection fees d. The City’s Planning department – related to landscaping (meeting the 30% coniferous requirement), signage, parking, setback, and sidewalk/trail connections. e. The Mississippi Watershed Management Organization f. The Minnesota Department of Transportation 4. If the square footage of the footprint of any of the buildings proposed changes by more than 10%, a S-2 master plan amendment shall be required. 5. The parking formula for this project requires that the 167 underground parking stalls are assigned to a rental unit through that unit’s lease at no additional/severable cost to assure adequate parking overall on this development site. 6. The petitioner is strongly encouraged to participate in Xcel Energy’s Energy Design Assistance program to identify energy and cost-saving strategies and to evaluate the potential for solar energy. 7. The petitioner is strongly encouraged to consider accommodations for electric vehicle (EV) charging. 8. The internal refuse rooms shall be designed to include the future collection of organics. The petitioner is encouraged to work with Anoka County Recycling and Resource Solution on signage for waste receptacles. City staff recommends approval of the following stipulation on Plat, PS #22-000001. 1. The University Avenue Service Drive right-of-way dedication shall occur with final plat approval. Attachments Comp Plan Amendment Current and proposed 2040 Future Land Use Map Amended Pages (changes in red) Rezoning Petitioner’s Narrative Architectural and Civil drawings Resident Public Hearing Notice, Map and Labels Plat Preliminary Plat drawing 12 39 Jufn!6/ REDEVELOPMENT \[ğƓķ ƭĻ !ƦƦƌźĭğƷźƚƓΑ tƩƚƆĻĭƷ bğƩƩğƷźǝĻ Project Address: University AveNE LLC Current Owner: Current Use: Single story retail strip center, surfaceparking 3: Jufn!6/ Proposed Owner/Developer/Manager:Roers Companies LLC Proposed Use:apartments in a-story building+ 1 level ofunderground parking. Timeline: Begin construction in Q 20, finish in 202. Residential Unit Mix TypeNo.Percentage 1 Bedroom% 2 Bedroom% 3 Bedroom% Total 100% PARKING Underground, indoor1 Stalls 2 of 4 41 Jufn!6/ Dear Councilmembers, Commissioners, Staff andCommunity Stakeholders, Roers is pleased to present this application forthe redevelopment of the property located at University Ave,nownasthe The wĻķĻǝĻƌƚƦƒĻƓƷ isthe transformation of an existingretail strip center into a new development. The projectwill includea apartment community comprisingapproximately residential apartments 1 underground parkingstalls. Theproject will bringnew energy and activityto a highly visible and trafficked site along the University corridor. ŷĻtƩƚƆĻĭƷ͸ƭunits include a range of optionsincluding multiple spaceconfigurations. The units arecomprised ofone, two and threebedroom apartment options. Included in each unit willbe a washer and dryer, stainless steel appliances,ͲğƓķ В͸ ceilings. Common area amenities in thebuilding inclu community room,outdoor patio, resident storageareas,a dogwash station, and game room. Outdoor amenitiesincludea playground, dogrunarea, and seating/gazebo area. Oneof themost unique aspectsof thisproject is that it is built to target underserved population of renters. Without sacrificing finish levels and amenitiesthe rent levelsin this project will be seta .Thisproject will providethose renters ǞźƷŷ ğ ƓĻǞ ŷƚǒƭźƓŭ ƚƦƷźƚƓ ğƷ ğ ƩğƷĻ ƷŷğƷ ǞƚƓ͸Ʒ ƦƩƚŷźĬźƷ ĻƓƷƩǤ͵ The requested rezoning is toaccommodatethe change in useof theproperty 3 of 4 42 Jufn!6/ Site Plan 4 of 4 43 4 / 4 6 ! n f u J 5 / 4 6 ! n f u J QMB\[B!CFMPX - PJDPJD DDL 49933 T SWPPP 22448A 11/09/22 SITE PLAN F PLANNING DEMO PLAN 763.424.5505 CIVIL DETAILSCIVIL DETAILS FRIDLEY, MNSWPPP NOTES STORM SEWER SHEET INDEX GRADING PLAN A LANDSCAPE PLAN 6 www.loucksinc.com LAND SURVEYING FRIDLEY ENVIRONMENTAL / CIVIL ENGINEERINGLANDSCAPE DETAILS QUALITY CONTROL 4 C2-1 R PJ Disch - PE Maple Grove, MN 55369 Minnetonka, MN 55305 6 SITE PLAN OUCKS CADD QUALIFICATION SUBMITTAL/REVISIONS ! 7200 Hemlock Lane, Suite 300SANITARY AND WATERMAIN 110 Cheshire Lane, Suite 120 L PROFESSIONAL SIGNATURE D LANDSCAPE ARCHITECTURE n ROERS COMPANIES MULTI-FAMILY f DEVELOPMENT u CADD files prepared by the Consultant for this project areinstruments of the Consultant professional services for use solelywith respect to this project. These CADD files shall not be usedon other projects, for additions to this project, or for completionof this project by others without written approval by theConsultant. With the Consultant's approval, others may bepermitted to obtain copies of the CADD drawing files forinformation and reference only. All intentional or unintentionalrevisions, additions, or deletions to these CADD files shall bemade at the full risk of that party making such revisions, additionsor deletions and that party shall hold harmless and indemnify theConsultant from any & all responsibilities, claims, and liabilities.09/12/22PRELIMINARY PRICING09/16/22CITY SUBMITTAL11/09/22CITY SUBMITTALLicense No.Date Loucks Project No.Project LeadDrawn ByChecked ByReview DateC1-1C2-1C3-1C3-2C3-3C4-1C4-2C8-1C8-2L1-1L2-1 I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and thatI am a duly Licensed Professional Engineer under thelaws of the State of Minnesota. J 972.5 2 2 7 1.0% 9 SIGN FENCE TREE LINE HYDRANTBUILDING DRAINTILE CONCRETECONTOUR GAS METER LIGHT POLE FORCEMAIN GATE VALVE WATERMAIN POWER POLEBENCHMARKNO PARKING SOIL BORING CATCH BASIN STORM SEWER WATER SERVICE ELECTRIC METER SPOT ELEVATION SANITARY SEWERCONCRETE CURBRETAINING WALL STORM MANHOLE CHAIN LINK FENCE OVERHEAD UTILITY SANITARY MANHOLE DIRECTION OF FLOW FLARED END SECTIONTELEPHONE PEDESTALUNDERGROUND GAS PARKING SETBACK LINE PARKING STALL COUNT POST INDICATOR VALVEBUILDING SETBACK LINE WATER MANHOLE / WELL SANITARY SEWER SERVICE UNDERGROUND ELECTRIC ACCESSIBLE PARKING STALL UNDERGROUND TELEPHONE UNDERGROUND FIBER OPTIC WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALLMAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 ATCABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES INLEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGEDDURING CONSTRUCTION AT NO COST TO THE OWNER. 2 EXISTINGPROPOSED " WITH TYPICAL PRE-MOLDED EXPANSION JOINT MATERIAL - NO PLASTIC INSETS. 1 4 DENOTES BITUMINOUS PAVEMENTDENOTES CONCRETE PAVEMENTDENOTES HEAVY DUTY CONCRETE PAVEMENT LEGEND MAXIMUM OF STANDARD DUTY BITUMINOUS. SEE DETAIL ON C8-2. 10.THE GAP BETWEEN THE SIDEWALK AND CONCRETE CURB (B612 OR FLUSH CURB) TO BE A11. ALL DRIVE LANES TO BE HEAVY-DUTY BITUMINOUS PAVEMENT AND PARKING STALLS TO BE ACCESSIBLE PARKING SITE DATAOFF-STREET PARKING CALCULATIONS SITE NOTES PAVEMENT LEGEND 2040 N SCALE IN FEET 0 5.0' 20.0' 20.0' 40.0' R20.0' R40.0' R40.0' R20.0' 20.0' 8.0' FFE-857.00 GFE-845.67 STOOP-TYP(SEE ARCH PLANS) 5.0' (GRASS PAVE 2-SEE DETAIL) TURF REINFORCEMENT MAT PROPOSED BUIDLING 42" WIDE FENCE GATE (TO MATCH FENCE) 25.0' ARTIFICIAL TURF(SEE DETAIL)10' CURB TAPER 10' CURB TAPERFLAT CURB (SEE DETAIL) 42" WIDE FENCE GATE(TO MATCH FENCE)STOOP-TYP(SEE ARCH PLANS)(SEE DETAIL)CONCRETE PATIO SPACEW/ BLACK ORNAMENTAL FENCE(SEE DETAIL)FLAT CURB (SEE DETAIL) HC SIGN - TYP42" WIDE FENCE GATE(TO MATCH FENCE) VINYL COATED CONCRETECURBING W/ BLACKCHAIN LINK FENCE(SEE DETAILS)SEE PLAY CURBING 42" WIDE FENCE GATE(TO MATCH FENCE)DETAIL FOR MULCHINFORMATION W/ BLACK VINYL COATEDCHAIN LINK FENCE(SEE DETAIL) PLAY CONCRETE CURBING STOOP-TYP(SEE ARCH PLANS) TURF REINFORCEMENT MAT (GRASS PAVE 2-SEE DETAIL) GARAGE ENTRY WALL W/ BLACK P.I.P. CONCRETEPROTECTIVE FENCE(SEE STRUCTURAL) 28.0' TOTLOT 34.0' 34.0' 20.0' 25.0' RUN24.0' DOG 50.0' 60.0' 10.0' BUILDING PROPOSED 9.0' TYP 6.0' FFE-857.00 GFE-845.67 18.0' FFE-857.00 GFE-845.67 9.0' PROPOSED BUIDLING PROPOSED BUIDLING DRAINTILE TRENCH(SEE CIVIL UTILITYSHEET AND DEAIL)9.0'TYP R3.0' 25.0' R3.0' BIKE RACK R3.0' R7.0'(SEE DETAIL) R8.0' TURF REINFORCEMENT MAT (GRASS PAVE 2-SEE DETAIL) 63.5' 8.0' 8' CURB TAPER3' CURB TAPER 36.0' 25.0' 18.0' FLAT CURB (SEE DETAIL) 9.0' 9.0' STOOP-TYP 6.0' CMU BLOCK WALLW/ PROTECTIVE BLACK ORNAMENTALFENCE(SEE GRADING PLAN) STOOP-TYP CONCRETE PADFOR TRANSFORER(SEE ELECTRICAL) (SEE ARCH PLANS) R8.0' R3.0' R3.0' (SEE ARCH PLANS) R7.0' 25.0' R3.0' R3.0' R7.0' R8.0' 18.0' 9.0'R3.0' R3.0' 35.0' 35.0' 25.0' 6.0' 20.0' 20.0' 25.0' 25.0' 8.0' R10.0' R10.0' R10.0' R10.0' R10.0'R10.0' CONCRETE (SEE DETAIL)(SEE DETAIL) CONCRETECONCRETE CONCRETE (SEE DETAIL) (SEE DETAIL) HEAVY DUTY(SEE DETAIL) HEAVY DUTY DOWELED TODOWELED TO TRAIL (SEE DETAIL) EXISTING APRONGEXISTING APRONG TRAIL (SEE DETAIL) TRAIL (SEE DETAIL) PEDESTRIAN RAMP-TYP PAVEMENT SECTION CONCRETE APRON-TYP PAVEMENT SECTION CURB/GUTTER STYLE8' WIDE BITUMINOUS 8' WIDE BITUMINOUS PEDESTRIAN RAMP-TYPCONCRETE APRON-TYP 8' WIDE BITUMINOUS CONCRETE APRON-TYP MATCH EXISTING ROAD MATCH EXISTING ROADMATCH EXISTING ROAD Plotted: 12 /09 / 2022 3:58 PM W:\\2022\\22448A\\CADD DATA\\CIVIL\\_dwg Sheet Files\\C2-1 SITE PLAN - PJDPJD DDL 49933 SWPPP 22448A 11/09/22 SITE PLAN PLANNING DEMO PLAN 763.424.5505 PLAN CIVIL DETAILSCIVIL DETAILS FRIDLEY, MNSWPPP NOTES STORM SEWER SHEET INDEX GRADING PLAN LANDSCAPE PLAN 7 www.loucksinc.com LAND SURVEYING FRIDLEY ENVIRONMENTAL / CIVIL ENGINEERINGLANDSCAPE DETAILS QUALITY CONTROL 4 C3-1 PJ Disch - PE GRADING Maple Grove, MN 55369 Minnetonka, MN 55305 6 OUCKS CADD QUALIFICATION SUBMITTAL/REVISIONS ! 7200 Hemlock Lane, Suite 300SANITARY AND WATERMAIN 110 Cheshire Lane, Suite 120 L PROFESSIONAL SIGNATURE LANDSCAPE ARCHITECTURE n ROERS COMPANIES MULTI-FAMILY f DEVELOPMENT u CADD files prepared by the Consultant for this project areinstruments of the Consultant professional services for use solelywith respect to this project. These CADD files shall not be usedon other projects, for additions to this project, or for completionof this project by others without written approval by theConsultant. With the Consultant's approval, others may bepermitted to obtain copies of the CADD drawing files forinformation and reference only. All intentional or unintentionalrevisions, additions, or deletions to these CADD files shall bemade at the full risk of that party making such revisions, additionsor deletions and that party shall hold harmless and indemnify theConsultant from any & all responsibilities, claims, and liabilities.09/12/22PRELIMINARY PRICING09/16/22CITY SUBMITTAL11/09/22CITY SUBMITTALLicense No.Date Loucks Project No.Project LeadDrawn ByChecked ByReview DateC1-1C2-1C3-1C3-2C3-3C4-1C4-2C8-1C8-2L1-1L2-1 I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and thatI am a duly Licensed Professional Engineer under thelaws of the State of Minnesota. J 972.5 2 2 7 1.0% 9 SIGN FENCE TREE LINE HYDRANTBUILDING DRAINTILE CONCRETECONTOUR GAS METER LIGHT POLE FORCEMAIN GATE VALVE WATERMAIN POWER POLEBENCHMARKNO PARKING SOIL BORING CATCH BASIN STORM SEWER WATER SERVICE ELECTRIC METER SPOT ELEVATION SANITARY SEWERCONCRETE CURBRETAINING WALL STORM MANHOLE CHAIN LINK FENCE OVERHEAD UTILITY SANITARY MANHOLE DIRECTION OF FLOW FLARED END SECTIONTELEPHONE PEDESTALUNDERGROUND GAS PARKING SETBACK LINE PARKING STALL COUNT POST INDICATOR VALVEBUILDING SETBACK LINE WATER MANHOLE / WELL SANITARY SEWER SERVICE UNDERGROUND ELECTRIC ACCESSIBLE PARKING STALL UNDERGROUND TELEPHONE UNDERGROUND FIBER OPTIC WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALLMAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 ATCABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES INLEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGEDDURING CONSTRUCTION AT NO COST TO THE OWNER. 2 EXISTINGPROPOSED LEGEND GRADING & DRAINAGE NOTES ELEVATION NOTES 2040 N SCALE IN FEET 0 602SET CAP# 48988 601SET CAP# 48988 849.69 849.50 847.75 851.25 849.50 % 849.89848.20847.75 848.20 0 849.89 . 2 849.25 847.55 848.42 851.05 847.80 40004NAIL MAG852.50 851.25851.28 852.00850.00 852.50 851.87 852.00 850.50 852.73 853.26 853.06 853.26 FFE-857.00 GFE-845.67 852.83 PROPOSED BUIDLING 854.002.0% 856.00 HI-PT 857.00 857.00 TW=857.00 GW=845.67 857.00 855.09 857.00 TW=857.00857.00 GW=845.67 845.67 852.00 851.81851.72 %8.1 %9.1 856.79 854.50 854.00 855.85 856.57 856.61856.95 845.51 856.61 845.51 845.70 845.70 856.75 856.75 858.52 859.25 856.57 857.84 856.57 2.0% 858.32 854.58 852.72852.82 852.25 %2.1 858.35 858.32 % 0 . FFE-857.00 TW=856.00 GFE-845.67 1.0%1 1.0% GW=856.00 856.00 856.00 FFE-857.00 856.67 GFE-845.67 857.79 PROPOSED BUIDLING PROPOSED BUIDLING 857.64 855.90 856.37 TW=855.90855.82 857.94 855.50 GW=851.03 855.09 856.74 857.00 854.99 0.9% %% 76 . .857.51 66 857.17 857.00 856.83 856.95 854.58 856.37 856.93 % 7854.29 856.32 . 2 851.22851.13851.43 10:1 %8.1 %0.2 854.10 856.53% 6 . 2 856.67 856.00 852.50 856.67 GW=856.00856.60 4.0% 851.54851.64 853.84853.97 855.99 GW=856.07 TW=856.43 TW=856.44853.02 855.00 GW=855.94 855.63 853.35 855.50 2 %0.2%4.853.46 853.31 854.01 854.00 856.86 853.26 1.0% 856.19 856.62 853.90 853.17 854.00 2.0% TW=858.25GW=855.25 GW=857.75 TW=857.75 5FND ALUM DISC 18407850.59 853.75 858.06 857.70856.82851.86851.66 851.46 857.17 857.54 4NAIL MAG857.56603SET CAP# 48988 40005NAIL MAG857.58 3FIP 1/2" OPEN857.39 600SET CAP# 48988 853.66 857.62 856.73 857.45 851.35 853.27 % % 2 3 ??? . . 2.1% 4.3%3.7%4 3 853.18 857.08 ??? 857.05 857.00853.50 856.10 852.55 Plotted: 11 /09 / 2022 1:56 PM W:\\2022\\22448A\\CADD DATA\\CIVIL\\_dwg Sheet Files\\C3-1 GRADING PLAN - PJD DDLDDL 45591 SWPPP 22448A 11/09/22 SITE PLAN PLANNING DEMO PLAN 763.424.5505 PLAN CIVIL DETAILSCIVIL DETAILS FRIDLEY, MNSWPPP NOTES STORM SEWER SHEET INDEX GRADING PLAN LANDSCAPE PLAN 8 www.loucksinc.com LAND SURVEYING FRIDLEY ENVIRONMENTAL / L1-1 CIVIL ENGINEERINGLANDSCAPE DETAILS QUALITY CONTROL 4 Maple Grove, MN 55369 Minnetonka, MN 55305 6 OUCKS CADD QUALIFICATION SUBMITTAL/REVISIONS ! Douglas D. Loken - LA 7200 Hemlock Lane, Suite 300SANITARY AND WATERMAIN 110 Cheshire Lane, Suite 120 LANDSCAPE L PROFESSIONAL SIGNATURE LANDSCAPE ARCHITECTURE n ROERS COMPANIES MULTI-FAMILY f DEVELOPMENT u CADD files prepared by the Consultant for this project areinstruments of the Consultant professional services for use solelywith respect to this project. These CADD files shall not be usedon other projects, for additions to this project, or for completionof this project by others without written approval by theConsultant. With the Consultant's approval, others may bepermitted to obtain copies of the CADD drawing files forinformation and reference only. All intentional or unintentionalrevisions, additions, or deletions to these CADD files shall bemade at the full risk of that party making such revisions, additionsor deletions and that party shall hold harmless and indemnify theConsultant from any & all responsibilities, claims, and liabilities.09/12/22PRELIMINARY PRICING09/16/22CITY SUBMITTAL11/09/22CITY SUBMITTALLicense No.Date Loucks Project No.Project LeadDrawn ByChecked ByReview DateC1-1C2-1C3-1C3-2C3-3C4-1C4-2C8-1C8-2L1-1L2-1 I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and thatI am a duly Licensed Landscape Architect under the lawsof the State of Minnesota. J 4` HGT 2.5"Cal2.5"Cal2.5"Cal6` HGT24" HGT24" HGT24" HGT24" HGT24" HGT24" HGT24" HGT24" HGT 10` HGT.18" HGT18" SPRD18" SPRD18" SPRD B & BB & BB & BB & BB & B10` HGT.B & B6` HGTB & B5 gal5 gal5 gal5 gal5 gal5 gal1 gal1 gal1 gal WARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALLMAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 ATCABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES INLEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGEDDURING CONSTRUCTION AT NO COST TO THE OWNER. Acer freemanii `Autumn Blaze` Gleditsia triacanthos `Impcole` TMBetula papyrifera `Renaissance Reflection`Betula nigraPicea glauca `Densata`Pinus sylvestrisSpirea x bumalda `Anthony Waterer`5 galSpirea x betulifolia `Tor`Viburnum trilobum `Bailey Compact`5 galSpirea x bumalda `Goldflame`Ribes alpinum `Green Mound`Hydrangea arborescens `Incrediball`5 galSpirea japonica `Little Princess`5 galCalamagrostis x acutiflora `Karl Foerster`1 galMiscanthus sinensis `Purpurascens`1 galJuniperus scopulorum `Medora`15 galJuniperus chinensis `Monlep`5 galJuniperus sabina 'Scandia'5 galJuniperus chinensis `Sea Green`5 galHemerocallis x `Stella Supreme`1 galSTONE MULCHCRUSHED GRAY ROCK 1"-3" DIA.WITH 3" DEPTHTURF SEEDMNDOT COMMERCIAL TURF SEED MIX25-131 OVER GRASSPAVE GRIDTURF SOD COMMON HACKBERRYCeltis occidentalisRENAISSANCE REFLECTION BIRCHRIVER BIRCHCLUMPCOMMON NAMEBOTANICAL NAMECONTSIZEBLACK HILLS SPRUCEFULL FORMSCOTCH PINEFULL FORMCOMMON NAMEBOTANICAL NAMECONTSIZEBIRCH-L EAF SPIREAGOLDFLAME SPIREAGREEN MOUND ALPINE CURRANTLITTLE PRINCESS SPIREACOMMON NAMEBOTANICAL NAMEMIN CONTMIN SIZEFEATHER REED GRASSFLAME MISCANTHUSCOMMON NAMEBOTANICAL NAMEMIN CONTMIN SIZEMEDORA JUNIPERFULL FORMCOMMON NAMEBOTANICAL NAMEMIN CONTMIN SIZE27,555 sf28,673 sf INCREDIBALL HYDRANGEA12,979 sf 10AUTUMN BLAZE MAPLE96QTY5QTY12352063QTY536QTYQTYSM 1SEEDSOD PLANT SCHEDULE ABAWS37ANTHONY WATERER SPIREAAD38ARCTIC FIRE DOGWOODCornus sericea `Artic Fire`TY37TAUNTON YEWTaxus x media `Taunton`AFS27AUTUMN FIRE SEDUMSedum x `Autumn Fire` DECIDUOUS TREESQTYCOMMON NAMEBOTANICAL NAMECONTSIZECHIH11IMPERIAL HONEYLOCUSTRRRB3EVERGREEN TREESBS4SCPORNAMENTAL TREESPRC4PRAIRIE ROSE CRABAPPLEMalus x `Prairie Rose`B & B1.5"CalSHRUBSQTYCOMMON NAMEBOTANICAL NAMEMIN CONTMIN SIZEBLSCV20COMPACT AMERICAN VIBURNUMDH43DWARF BUSH HONEYSUCKLEDiervilla loniceraGS46GACINHLPSGRASSESFGFLMCONIFEROUS SHRUBSMDJ25MJJ21MINT JULEP JUNIPERSJ44SCANDIA JUNIPERSG36SEA GREEN JUNIPERPERENNIALSFRH12FRANCEE HOSTAHosta `Francee`PHO8PATRIOT HOSTAHosta x `Patriot`SSD37STELLA SUPREME DAYLILYGROUND COVERSCODEQTYCOMMON NAMEBOTANICAL NAME 2040 N SCALE IN FEET 0 2 2 2 IHCH CH 1 4 2IH CH SCP 1 SCP 2 34224 32422 222322222222 2422233 3CV GSGSGSGSSGGS SGGSSGGSGS CVCVGSSGCVSGCVGSSGGSSG GSGSSGSGGS MDJGS MDJ 2 GAC 1 1 IH MDJ 5 LPS 3 2 MJJ TY 3 LPS 2 FFE-857.00 GFE-845.67 LPS 2 MJJ 2 TY PROPOSED BUIDLING 1 CH 7 6 72 373737373318SJ 1212FG FG BLS SGSGSGSGSGSG AFS AWS AWSAWSAWSAWS AWS 6 FG 5 LPS 8 PHO 6 5 LPS GAC 2 CV 2 MJJ 6 2 13 TY5 AFS FLM TY TOT LOT 1 IH 3 LPS GARAGEENTRY DOGRUN 2 LPS 2 TY 7 22 4 CV INH MJJ LPS 17 FG 95 23SJ11TY AD17SJ SSD3 4 1 FFE-857.00 6 GFE-845.67 GAC PRCCH RR FFE-857.00 GFE-845.67 2 2MJJ TY 2 5 CV LPS PROPOSED BUIDLING PROPOSED BUIDLING 4 4 4INH BS 26 BLS SSD 2 LPS 5 3 TY LPS 2 4 IH2 IH TY 3 MJJ 1 IH 12 FG 12 FRH 1 MDJ 3 CV 4 5 CMU WALL(SEE GRADING PLAN) LPSGAC 56 TY INH 4 1 1 MDJ MDJ 91CH LPS MJJ 4 MDJ 10 GAC 2 AB 2 AB 41 10 MJJ MDJ 1GAC RB 14 1 MJJ MJJMDJ 1 8' WIDEBITUMINOUSTRAIL 2 RB 1 1AB AB AB2 AB 1 RB 55555 1111 6AD DHADDHDHADDH DH Plotted: 11 /09 / 2022 2:16 PM W:\\2022\\22448A\\CADD DATA\\LANDSCAPE\\_dwg Sheet Files\\L1-1 LANDSCAPE PLAN 9 / 4 6 ! n f u J : / 4 6 ! n f u J Jufn!7/ AGENDA REPORT Meeting Date:January 5, 2023 Meeting Type:Housing & Redevelopment Authority Submitted By:Paul Bolin, Assistant Executive Director Title Update on Housing Programs Background On a monthly basis, staff will provide updates from loan programs, remodeling advisor visits and Home Energy Squad Visits. Attachments and Other Resources Chart of Loans Issued and Remodeling Advisor Visits Vision Statement We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses. 51 Jufn!7/ 18 48 1 4: 11 259:45/11 2-195-225/29 449 1/11 16 36111/11 1/11 11 1/11 1/11 11 1/11 1/11 12 8111/11 1/11 12 28958/11 1/11 124 2:8776/11 2442737/29 259:45/11 469 1/111354156/119 1/11354156/119 1 52 Jufn!7/ -- 22/5: 21/:7 / 22/5: 98/7: 6997/68 65/92 45/59 54/96 56/:8 87/84 43/99 76/88 32/:3 // 21/:7 / 65/92 21/:7 43/99 21/:7 / 2221/69 43/99 21/:7 2221/69 21:/73 21/:7 21/:7 87/84 32/:3 32/:3 43/99 - 21/:7 54/96 53