Resolution No. 2024-04, Ordering Final Plans, Specifications and Calling for Bids for the 2024 Street Rehabilitation Proj. No. ST2024-01
Resolution No. 2024-04
Ordering Final Plans, Specifications and Calling for Bids for the
2024 Street Rehabilitation Project No. ST2024-01
Whereas, the City of Fridley (City) has prepared a Capital Investment Program to systematically and
regularly reconstruct and rehabilitate streets and utilities within the City to maintain infrastructure
quality and performance; and
Whereas, the construction of certain roadway and utility improvements (Improvements) are
included within the 2024 Street Rehabilitation Project No. ST2024-01 (Project) as identified within
the Capital Investment Program and deemed to be in the interest of the City and property owners
affected thereby; and
Whereas, pursuant to the direction of the Fridley City Council, the City’s Engineering Division has
prepared a feasibility report and estimates of costs thereof for the Improvements; and
Whereas, Resolution No. 2023-142 adopted November 27, 2023, received the feasibility report and
set a public hearing regarding the estimated costs, funding and construction of the Improvements
for the date of December 18, 2023; and
Whereas, it is the intent of the City to fund a portion of the project costs through special
assessments to benefitting property owners in accordance with its Roadway Major Maintenance
Financing Policy; and
Whereas, pursuant to Minnesota Statute, proper notification of said public hearing was given; and
Whereas, at said Hearing on Improvements, the City Council heard all those parties that desired to
address the Council regarding said Improvements in whole or in part.
Now, therefore it be resolved, that the City Council of the City of Fridley hereby finds and orders:
1. Such Improvements are necessary, cost-effective and feasible as detailed in the feasibility
report.
2. The Improvements proposed in the feasibility report are hereby ordered to be effected and
completed as soon as reasonably possible, to-wit:
Street and utility improvements, including pavement reclamation, mill & overlay,
bituminous asphalt paving, concrete curb & gutter spot replacement, water main
replacement and utility repairs including the street segments as follows:
th
Lucia Lane from Mississippi Street (CSAH 6) to 68 Place
Channel Road from Mississippi Street (CSAH 6) to North Terminus
th
66 Avenue from Pierce Street to Channel Road
Norton Avenue from Central Avenue (CSAH 35) to West Terminus
rd
Buchanan Street from 53 Avenue to City Limits
Resolution No. 2024-04 Page 2
3. The Improvements be incorporated in the 2024 Street Rehabilitation Project No. ST2024-01.
4. That the work affecting the Improvements under said Project may be performed under one
or more contracts as may be deemed advisable upon receipt of bids.
5. That the Director of Public Works, James P. Kosluchar, P.E. is hereby designated as the
engineer for the Improvements and shall oversee the preparation of plans, specifications
and estimates of cost thereof for making of the Improvements.
6. That final plans, specifications and estimates are prepared by the Public Works Engineering
Division and provided to the City Council as they are completed.
7. That the Engineering Division call for bids in order that Project award(s) and construction
can be considered.
th
Passed and adopted by the City Council of the City of Fridley this 8 day of January, 2024.