Ordinance No. 1418, Amending the Fridley City Code to Update Building and Inspection Fees 02-12-2024
Ordinance No. 1418
Amending the Fridley City Code Chapter 209, Fees, to Update Building and Inspection Fees
The City Council of the City of Fridley does ordain, after review, examination and staff
recommendation that the Fridley City Code be amended as follows:
Fridley City Code
Chapter 209 Fees
209.12.2 Building and Inspection Fees
2. Building and Inspection Fees
(b) Electrical Permit Fees
Code Subject Fee
Residential, Commercial, Multi-Family
206 0 to 400 Amp Power Source $50 each
206 401 to 800 Amp Power Source $100 each
206
Over 800 Amp Power Source $150 each
206
0 to 200 Amp Circuit or Feeder $8 9 each
206
Over 200 Amp Circuit or Feeder $30 each
Over 200 Volts
206
0 to 400 Amp Power Source $100 each
206
401 to 800 Amp Power Source $200 each
206
Over 800 Amp Power Source $300 each
206
0 to 200 Amp Circuit or Feeder $16 18 each
206
Over 200 Amp Circuit or Feeder $60 each
206
Panel Changes (reconnect existing circuit or feeder $100 each
for panelboard replacement)
206
New 1 and 2 Family Homes up to 25 Circuits, 3 Trips $175 200 each
206
New Multi-Family Dwelling unit (with up to 20 circuits $100 per dwelling
and feeders per unit) unit
206
New Multi-Family Dwelling Unit $8 9 per feeder or
(additional circuits over 20 per unit) circuit
206
Existing Multi-Family Dwelling Unit (up to 10 feeders $100 per unit
or circuits are installed or extended)
206
Existing Multi-Family Dwelling Unit $8 9 per feeder or
(where less than 10 feeders or circuits are installed or circuit
extended)
206
Additional circuits over 25 per unit $8 9 each
206
Circuits extended or modified $8 9 each
206
Retrofitting of existing lighting fixtures $1 each
206
Manufactured Home Park Lot Supply + Circuits $50 55 per pedestal
206
Separate Bonding Inspection $40
206
Pools plus circuits $80110
206
Inspection of concrete encased grounding electrode $4055
206
Technology circuits and circuits less than 50 volts $1 per device
206
Traffic Signals, Street, Parking and Outdoor Lighting $5 each
Standards
206
Transformers for light, heat and power (0 to 10 KVA) 20 each
206
Transformers for light, heat and power (more than 10 $40 50 each
KVA)
206
Transformers for electronic power supplies and $5.50 each
outline lighting
206
Additional Inspection trip(s), re-inspections $40 55 each
Minnesota Solar PV System Electrical Inspection Fee Chart
206
0 – 5,000 watts (5 kw) $6090
206
5,001 – 10,000 watts (5 kw – 10 kw) $100150
206
10,001 – 20,000 watts (10 kw – 20 kw) $150225
206
20,001 – 30,000 watts (20 kw – 30 kw) $200300
206
30,001 – 40,000 watts (30 kw – 40 kw) $250375
206
40,001 and larger watts (40 kw) $250375
Each additional 10,000 watts $25
206
Plan review fee $80 per hour
Passed and adopted by the City Council of the City of Fridley on this 12th day of February,
2024.
______________________________________
Scott J. Lund - Mayor
______________________________________
Melissa Moore - City Clerk
First Reading: January 22, 2024
Second Reading: February 12, 2024
Publication: February 15, 2024